J1879 Robustness Validation Hand Book A Joint SAE, ZVEI, JSAE, AEC Automotive Electronics Robustness Validation Plan Robustness Diagram Trends and Challenges.

Slides:



Advertisements
Similar presentations
Chapter 12 Prototyping and Testing Design of Biomedical Devices and Systems By Paul H. King Richard C. Fries.
Advertisements

Design of Experiments Lecture I
Relex Reliability Software “the intuitive solution
ISO 9001 : 2000.
Supplier SQM Participation. 2 | MDT Confidential What is SQM? Stands for Supplier Quality Managment –Formally referred to as SPACE and SPICE Is a system.
Module 3 UNIT I " Copyright 2002, Information Spectrum, Inc. All Rights Reserved." INTRODUCTION TO RCM RCM TERMINOLOGY AND CONCEPTS.
1 MANUFACTURING AND PRODUCTION OF BIOLOGICAL PRODUCTS (ERT 455) HAZARD ANALYSIS AND CRITICAL CONTROL POINT (HACCP) SYSTEM Munira Mohamed Nazari School.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
1 Highly Accelerated Life Test (HALT) Wayne Bradley 8 April 2014.
Managing Quality Chapter 5.
Overview Lesson 10,11 - Software Quality Assurance
Strategic cost analysis 2
Lucas Phillips Anurag Nanajipuram FAILURE MODE AND EFFECT ANALYSIS.
Software Verification and Validation (V&V) By Roger U. Fujii Presented by Donovan Faustino.
SIX SIGMA. What is six sigma? Sigma is a measure of “goodness: the capability of a process to produce perfect work. A “defect” is any mistake that results.
Codex Guidelines for the Application of HACCP
© 2009 Michigan State University licensed under CC-BY-SA, original at Corrective Action.
Testing: Chapter 13 "You make it, I’ll break it".
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 24 Slide 1 Critical Systems Validation 1.
Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.
Managing Risk. Objectives  To Describe Risk Management concepts and techniques  To calculate and analyze a project using Probability of completion 
Analyze Opportunity Part 1
Estimating total drug offending in Victoria using statistical methodologies. Richard Watkins Craig Darragh Victoria Police.
J1879 Robustness Validation Hand Book A Joint SAE, ZVEI, JSAE, AEC Automotive Electronics Robustness Validation Plan The current qualification and verification.
Building Dependable Distributed Systems Chapter 1 Wenbing Zhao Department of Electrical and Computer Engineering Cleveland State University
Testability of Analogue Macrocells Embedded in System-on-Chip Workshop on the Testing of High Resolution Mixed Signal Interfaces Held in conjunction with.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e Slides prepared by Kim Langfield-Smith.
Fault Tolerance Benchmarking. 2 Owerview What is Benchmarking? What is Dependability? What is Dependability Benchmarking? What is the relation between.
COSTING AND THE VALUE CHAIN CHAPTER 18 PAGE# 794 Faisal
Smart Home Technologies
Experimental Control Definition Is a predictable change in behavior (dependent variable) that can be reliably produced by the systematic manipulation.
Chapter 16 Managing costs and quality
HNDIT23082 Lecture 09:Software Testing. Validations and Verification Validation and verification ( V & V ) is the name given to the checking and analysis.
ICS Area Managers Training 2010 ITIL V3 Overview April 1, 2010.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
Product Lifecycle Management
Integration of Temperature Control into the Supply Chain
Project Management PTM721S
APQP Five Phase Process
Authors: Maria de Fatima Mattiello-Francisco Ana Maria Ambrosio
Manufacturing and Service Operations
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
FMEA.
Failure mode and effect analysis
© The Aerospace Corporation 2008 Rationale for Selected MIL-STD-1540E Thermal Test Requirement John W. Welch The Aerospace Corporation TFAWS
Project Management for Software Engineers (Summer 2017)
Quality Management Systems – Requirements
Global Supplier Quality Early Production Containment Training
GE 6757 TOTAL QUALITY MANAGEMENT
Lecture 09:Software Testing
GROUP MEMBERS NAME ROLL NO SHAUBAN ALI 17-ARID-5650 UMAIR MUSHTAQ 17-ARID-5656 TARIQ SAEED 17-ARID-5657 MUSKAN WADOOD 17-ARID-5641.
  Aptiv Global Supplier Quality Early Production Containment Training.
Critical Systems Validation
Testing and Test-Driven Development CSC 4700 Software Engineering
H A C C P HAZARD ANALYSIS CRITICAL CONTROL POINTS 1 December 2018
RAM XI Training Summit October 2018
Performance Improvement Projects: PIP Library
Martin Shaw – Reliability Solutions
YuankaiGao,XiaogangLi
Consider the Evidence Evidence-driven decision making
Unit I Module 3 - RCM Terminology and Concepts
Failure Mode and Effect Analysis
BU5004 Managerial Accounting
Quality Control Lecture 3
Global Supplier Quality Early Production Containment Training
RELIABILITY Reliability is -
Demand Management and Forecasting
Six Sigma Introduction 1 1.
Presentation transcript:

J1879 Robustness Validation Hand Book A Joint SAE, ZVEI, JSAE, AEC Automotive Electronics Robustness Validation Plan Robustness Diagram Trends and Challenges Robustness Decision Parameter A Parameter B Specification Application II LEAST ROBUST Failure Mode C Mode B Mode A Robustness Margin ROBUST VERY ROBUST Robustness Curve - Sufficient Robustness If the Area Of The Robustness Curve (blue ring in figure 1) lies outside the specification limits, the robustness of the component is sufficient. In general, the target is met if the robustness curve lies outside the specification limits. Robustness Curve – Insufficient Robustness Strategies for improvement of insufficient robustness. In case of insufficient robustness, improvement measures have to be defined and implemented during the development phase. Corrections for Unexpected Failures that are discovered after the development phase should be corrected and added to the knowledge base. The current qualification and verification methods do not provide statistical evidence that a device under test will meet customer demand of parts per million failure rates. The correlation between applied stress condition and lifetime under use condition is not established. The result of a qualification is qualitative, under the same requirements, it is possible to select the worst choice. Analyzed returns from the field demonstrate that some tests are not detecting deficiencies during the qualification process. In consequence, a more pragmatic validation approach must be introduced. Robustness validation seeks to define the guard band between the outer limits of the specification and the component's actual performance. Robustness is the degree to which a component or system is impervious or resistant to factors which can effect its function, performance or other identified attribute or quality characteristic. Solutions for Improvement Robustness Validation Components Before implementing the solution for improving robustness, the solution must be reviewed with respect to several other aspect, i.e.: Does the expected improvement meet the robustness target? Does the improvement solution influence the robustness of other failure mechanisms? What is the implementation risk (probability that the device fails in it’s implementation)? Robustness ~ (1-Implementation Risk) It should be taken into account that, in general, from a statistical point of view, nearly everything that reduces the risk increases the robustness. Robustness Validation has four key components Knowledge of use/application conditions - Mission Profile Knowledge of failure mechanisms, failure modes and their interactions – Captured in the Knowledge Matrix database Acceleration models for the failure mechanisms needed for defining and assessing accelerated tests Testing of the part until failure or determination of End of Life Robustness Validation results in a product being qualified as “fit for application”, not “fit for standard”. This approach requires more up front communication and explanation between customer and supplier than a stress-based qualification. Figure 1. The robustness diagram is a way to demonstrate robustness validation results graphically. The figure above gives an example for two parameters, i.e., Temperature and Voltage. The guard band, or safety margin, between the limits of the specification and the component's actual performance determines the component’s robustness as indicated by the three robustness curves. Qualification Process Flow Using Robustness Validation Expected Outcomes Input Knowledge Matrix - A knowledge matrix is needed to capture the basic mechanisms behind each potential failure mechanism, the root cause(s) of each failure mechanism and the effects of failure to the electronic component, product performance and application. The knowledge matrix is the database for generating a qualification plan based on the application profile and for generating the reliability performance numbers under use conditions. Mission Profile - The mission profile determines, within a specific group of applications, the range of environmental, life time and manufacturing conditions to which the device is exposed during its life. This life time includes the whole supply chain (storage, shipping, processing, operating and non-operating). Based on the mission profile the potential risks to fail in the application together with the potential failure mechanisms can be defined. Robustness Assessment - A robustness assessment has to be done separately for each failure mechanism. The overall component robustness can be estimated by the failure mode’s statistical data. Quality Engineering requirements Mindset Change – Rather than relying on the current reliability system of probability prediction, i.e., 95%Reliability / 90%Confidence (50,000 ppm), Robustness Validation provides more and better data to prove whether or not a component of system will achieve very high reliability in its intended application. “Smarter” testing which is quicker, better and less expensive than traditional past and present methods eliminates the wastes associated with low-value testing/analysis and the risks associated with insufficient testing/analysis. Better more efficient, effective, reliable methods for validating changes to the design, process and application. Address the “real” problems, including NTF (no trouble found), HW/SW interfaces, system issues and “soft” failures such as out-of-spec performance. Provide methods for preventing and capturing problems caused by unintended and undisclosed design/process changes. Environment defined by mission profile Performance in the application spec Failure mechanism Known potential failure mechanisms Unknown potential failure mechanisms Potential risk and failure mechanism Qualification plan Reliability tests, test conditions, duration & acceptance, test vehicle, Sample size / number of lots Qualification setup Perform stress tests Stress tests according to quality plan Review stress set up Design for Reliability Screening strategy Technology solution Application review Mission profile review Parameter change over time of stress Fail distribution Model used for extrapolation Reliability Characterization Robustness Assessment Compare data to requirements Compare delta to robustness target Robustness Sufficient? NO Improvement YES Intrinsic reliability monitoring Extrinsic reliability monitoring Frequency of monitoring/sample size Actions on deviations in monitoring results Monitor plan set up Production Figure 2.