Impedance working group update 3rd Sept 2013

Slides:



Advertisements
Similar presentations
AWG 36, 0.2 A 0.3 mm Heat Shrink Tubing t = 0.38 mm Silicone Coating t = 0.2 mm D = 3 mm Shielding: Copper Tape AWG 26, 2.2A 0.6 mm AWG 26, 2.2A 0.6 mm.
Advertisements

Impedance of SPS travelling wave cavities (200 MHz) A. Grudiev, E. Métral, B. Salvant, E. Shaposhnikova, B. Spataro Acknowledgments: Erk Jensen, Eric Montesinos,
4 November 2014 Mike Hourican TE/ABT1 LIU-SPS Injection Upgrade With input from Jan Borburgh, Bruno Balhan.
Outcome of yesterday’s brainstorming on the potential of using CALIFES or CTF3 electron beam for impedance studies Elias Métral, Benoit Salvant, Carlo.
RF contact non conformities in LHC interconnects: Impedance aspects N. Mounet, B. Salvant With the help of: Gianluigi Arduini, Vincent Baglin, Serge Claudet,
Particle Studio simulations of the resistive wall impedance of copper cylindrical and rectangular beam pipes C. Zannini E. Metral, G. Rumolo, B. Salvant.
TDI longitudinal impedance simulation with CST PS A.Grudiev 20/03/2012.
2012 activities of the ICE impedance working group and plans for
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
Acknowledgements F. Caspers, H. Damerau, M. Hourican, S.Gilardoni, M. Giovannozzi, E. Métral, M. Migliorati, B. Salvant Dummy septum impedance measurements.
Update on BGV impedance studies Alexej Grudiev, Berengere Luthi, Benoit Salvant for the impedance team Many thanks to Bernd Dehning, Massimiliano Ferro-Luzzi,
Update on wire scanner impedance studies
Simulation of trapped modes in LHC collimator A.Grudiev.
Trapped Modes in LHC Collimator (II) Liling Xiao Advanced Computations Department SLAC National Accelerator Laboratory.
News and hot topics Impedance meeting 14/04/2014.
Resistive Effects in XFEL Kicker Andranik Tsakanian XFEL Beam Dynamic Meeting 17 Dec 2007.
Main activities and news from the Impedance working group.
POTENTIAL EN-MME DESIGN JOBS IDENTIFIED BUT CURRENTLY NO REQUEST FROM EQUIPMENT OWNERS TO EN-MME EDMS B.RIFFAUD On behalf of EN-MME design team.
Update on new triplet beam screen impedance B. Salvant, N. Wang, C. Zannini 7 th December 2015 Acknowledgments: N. Biancacci, R. de Maria, E. Métral, N.
Proposal to change bunch length during physics fills to assess beam induced heating after LS1 M. Barnes, P. Baudrenghien, A. Burov, S. Claudet, S. Jakobsen,
August 21st 2013 BE-ABP Bérengère Lüthi – Summer Student 2013
TPSG4 validation at HighRadMat #6 Cedric Baud, B. Balhan, Jan Borburgh, Brennan Goddard, Wim Weterings.
Longitudinal impedance of new RF fingers O. Berrig, C. Garion, B. Salvant.
Impedance Working Group Update ICE meeting June 12 th 2013.
Update on the TDI impedance simulations and RF heating for HL- LHC beams Alexej Grudiev on behalf of the impedance team TDI re-design meeting 30/10/2012.
Impedance of current TCP compared to new TCP with button.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
General – mode matching for transverse impedance being compared with CST and infinitely long pipes (Nicolo) – Carlo found a way to disentangle direct space.
LIU-SPS Project baseline, objectives and reviews for 2016 B.Goddard 20/01/16.
New Contributions to the SPS Longitudinal Impedance Model
Feasibility of impedance measurements with beam N. Biancacci, N. Wang, E. Métral and B.Salvant COLUSM meeting 27/05/2016 Acknowledgements: A. Lafuente.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
LIU-PS Beam Dynamics Working Group Introduction and objectives
TDI: to coat or not to coat?
ICE SECTION The coolest place to be! Elias Métral
Finemet cavity impedance studies
Update on HL-LHC triplet fingers
Benoit Salvant, Kyrre Sjobak, Christine Vollinger, Na Wang
LIU–PLI report LIU SPS meeting.
Proposals for 2015 impedance-related MD requests for PSB and SPS
Possible causes for SPS ZS2 misalignment
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Upcoming longitudinal MDs
Laser-engineered surface structures (LESS) What is the beam impedance?
News on the TMCI and SPS transverse impedance
Impedance working group update
Dummy septum impedance measurements
LHC INJECTION SEPTUM MSI (1/3)
TCTP the CST side F. Caspers, H. Day, A. Grudiev, E. Metral, B. Salvant Acknowledgments: R. Assmann, A. Dallocchio, L. Gentini, C. Zannini Impedance Meeting.
News Request to install SLAC collimator in SPS
Beam impedance of 63mm VM with unshielded Bellows
Laser-engineered surface structures (LESS) What is the beam impedance?
Agenda Lessons from TU Darmstadt New total wakes with CST 2010
Discussion on the TDI impedance specifications
Simulation of trapped modes in LHC collimator
LHC SPS PS Impedance working group update 3rd July 2013 HL-LHC:
TDIS simulations plan.
impedance aspects for the beam screen
Impedance working group update 21st August 2013
Simulations and RF Measurements of SPS Beam Position Monitors (BPV and BPH) G. Arduini, C. Boccard, R. Calaga, F. Caspers, A. Grudiev, E. Metral, F. Roncarolo,
RESISTIVE HEAT LOAD FOR THE TDI = LHC injection beam stopper
HBP impedance calculations
TCLIA/TCTV transverse BB impedance versus gap size
Impedance working group update 07th August 2013
Current impedance activities
FOLLOW-UP FOR THE TDI = LHC injection beam stopper
Two beam coupling impedance simulations
Results on RF-Measurements on 3-Convolution HL-LHC fingers
Current impedance issues
TCLIA/TCTV transverse BB impedance versus gap size
Presentation transcript:

Impedance working group update 3rd Sept 2013 General using symmetries in CST (Andrea), presented at the last impedance meeting. Transverse impedance of finite length devices with mode matching (Nicolo), and recall of Zotter/Gluckstern (Elias) presented at the last impedance meeting CST specialized training coming up. HL-LHC Deadline: Beam induced heating with HL-LHC parameters for end of Summer Deadline: impedance model for November

LHC SPS PS PSB CLIC ELENA: TLEP: ALFA: request to increase the gap between the bellow and the filler from 1 mm to 2 mm. ALFA recommendation out for comments (Olav) Non-conformities in RF contacts (presented at the last impedance meeting, LBOC next week): impedance of damage seems to be small and damage has not evolved from 2009 in the trplets  no strong push to repair if isolated as difficult operation. TDI: trying to increase copper coating thickness, but possibility of peeling in case of beam impact. SPS Wirescanner: MSWG last week most likely the insert tube will be removed. ZS: discussion with Bruno Balhan, the ZS in LSS2 will not be changed, maybe ZSTF in LSS6, but not much time left. TPSN, TPSG  very similar geometry to dummy septum without screen  likely many modes at low frequency. Serena agreed to study this. PS Deadline: Simone’s correction for TDR are being implemented. Maybe new BGI in PS (Mariusz Sapinski): will contact us. PSB No news. CLIC No news ELENA: TLEP: