Always ensure the correct grade and length bolts are used

Slides:



Advertisements
Similar presentations
Always start a vehicle correctly
Advertisements

Beware of hazards around you
Always use mechanical handling aids when carrying out a heavy lift
Always ensure travelling block is stationary during DM changeover
Always stay alert while driving, and observe other drivers behaviour
Always use 3 points of contact when using ladders
PDO Second Alert Date: Incident : LTI What happened?
PDO Second Alert What happened? Ensure you are out of the danger zone
Don’t pull a twisted sling
Always think to use hands off technique.
PDO Second Alert Date: Incident title: Fall from Height
Drive with appropriate speed to road conditions
Identify Pinch Points and keep your Hands & Fingers away
Do not work at height without fall protection
PDO Second Alert Date: Incident type: LTI What happened?
Ensure to use the right tools and equipment for the activity
Ensure a working platform is adjusted and used
Follow Management of Change for an activity which is not in permit
Always Drive to road conditions
PDO Second Alert What happened? Your learning from this incident..
Keep away form ‘line of fire’
Always use the correct tools for the job
Always use the right equipment for the task !!!!
Always follow Night driving rules
Check & avoid potential Pinch points
Ensure OHL Clearance required for your lifting activity
No hands on elevator while delivering pipe
PDO Second Alert What happened? Your learning from this incident..
Never put your Hands in line of fire
Always stay out of the line of fire
PDO Second Alert What happened? Your learning from this incident..
Ensure cat line are under tension before removing elevator bolts
PDO Second Alert Date: Incident title: Fatality What happened?
PDO Second Alert Date: Incident title: LTI What happened?
Adequate tethered tools
PDO Second Alert Always follow the PTW procedures
Photo explaining what was done wrong
Safety Critical Devices can Save the Lives & Protect Asset
Unsecured pup joint falling
Identify, Verify & Monitor Barriers
PDO Second Alert Date: Incident title: HiPo MVI
PDO Second Alert Use Hands Free Lifting Aids What happened?
Always report Near Misses
Do not stand in the LINE OF FIRE
PDO Second Alert Date: Incident title: HiPo Asset Damage
Always use secondary retention
Keep your hands in a safe position
Always keep your hands away from crush points (Line of Fire)
Always use your hands to set the slips
Ensure that all Rig moves are carried out by competent personnel
Always stay away from line of fire
PDO Second Alert What happened? Your learning from this incident..
When operating the Tongs under tension, make sure all crew keep clear
PDO Second Alert Date: Incident title: HiPo What happened?
Always ensure “no go” zone are in place
Check equipment prior to start the job
PDO Second Alert Photo explaining what was done wrong
Always ensure your journey is authorised
Seek assistance of Banksman while reversing the vehicle
Use only certified lifting equipment in good condition
Always keep your hands and fingers away from the Line of Fire
Always keep your equipment maintained
PDO Second Alert What happened? Your learning from this incident..
Check Level Setup prior Lifting & Lowering Operation
PDO Second Alert What happened? Your learning from this incident..
Always adhere to Red/No Go zones
Always drive to the road conditions!
Always be alert and operate drilling hoisting equipment at safe speed.
Always position the crane boom correctly before slinging the casing
Beware of raised edges of walk ways.
Presentation transcript:

Always ensure the correct grade and length bolts are used PDO Second Alert HIPO Near Miss, 24th Mar 2017 What happened? While drilling 8½” hole section, the Derrickman observed that the stabber guide was hanging by its secondary retention. The Driller was informed and the operation was stopped immediately. A safety meeting was conducted with site supervisors and crew members to discuss required action to rectify the situation, Drill pipe stand was racked back and TDS was descended to the rig floor so the stabber guide could be reattached. Your learning from this incident.. Secondary retention worked effectively preventing a DROPs incident Learning from an previous incident was utilized and implemented preventing a DROPs incident Incorrect bolts were installed as means of primary retention for the stabber guide bracket Bolt length and threads weren't inspected prior to reinstallation Lock wire on the bolts wasn’t installed correctly Incorrect length bolt and worn threads Always ensure the correct grade and length bolts are used Correct length bolt and good threads

Management self audit HIPO NM, 24th Mar 2017 As a learning from this incident and ensure continual improvement all contract managers must review their HSE HEMP against the questions asked below Confirm the following: Does your DROPs inspection include checking both primary and secondary retention? Does your Snr mechanic complete a DROPS inspection on the TDS at regular intervals? Do you have a quality assurance procedure for checking 3rd party DROPS inspections? Make a list of closed questions (only ‘yes’ or ‘no’ as an answer) to ask other contractors if they have the same issues based on the management or HSE-MS failings or shortfalls identified in the investigation. Pretend you have to audit other companies to see if they could have the same issues.