HIE-LINAC status report

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

Juliette PLOUIN – CEA/SaclayCARE’08, 3 December /21 Superconducting Cavity activities within HIPPI CARE ‘08 CERN, 2-5 December 2008 Juliette PLOUIN.
Superconducting Spoke Resonator Cavities and Cryomodules
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
Cell-Coupled Drift Tube Linac M. Pasini, CERN AB-RF LINAC4 Machine Advisory Committee 1 st meeting CERN January 29-30, 2008.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
HIE-ISOLDE contribution packages M. Pasini BE/RF.
High beta cavity simulations and RF measurements Alessandro D’Elia- Cockroft Institute and University of Manchester 1.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
WP3 Required interfaces for cryostat design / integration Patxi DUTHIL SPL 3 rd Collaboration Meeting, CERN, Geneva November 12 th 2009.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
Advanced Energy Systems, Inc. Prototype Cavity Fabrication & Test Presented by Ilan Ben-Zvi, BNL for Michael Cole, AES.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
HIE-ISOLDE Project Y. Kadi (EN-STI) On behalf of the HIE-ISOLDE Coordination team.
High beta cavity simulations and RF measurements Alessandro D’Elia- Cockcroft Institute and University of Manchester 1.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
SPL cavity design by IPN Orsay Guillaume OLRY November rd SPL collaboration meeting.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
Vacuum, Surfaces & Coatings Group Technology Department 22 nd January 2015 C. Garion2 Beam Line Interconnection: snapshot of present design principles.
Prepare specifications/requirements magnetic and mechanical characteristics operation mode Development of Test facility - dedicated test facility to study.
TIARA PP TIARA Final Meeting 27 th November 2013 – Daresbury TIARA-PP WP 9 : TIHPAC TIARA-PP WP 9 : TIHPAC Test Infrastructure for High Power Accelerator.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
ESS AD RETREAT 5 th December 2011, Lund “A walk down the Linac” SPOKES Sébastien Bousson IPN Orsay.
Slide 1 of 10Matthew Fraser – CI MEW Meeting, 25 th October 2010.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Ralf Eichhorn CLASSE, Cornell University. I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see.
650 MHz Beta = 0.61 Cavity Design, Fabrication and Testing R. Rimmer for F. Marhauser Jefferson Lab, Newport News, Virginia 23606, USA Project-X Collaboration.
1 Project X Workshop November 21-22, 2008 Richard York Chris Compton Walter Hartung Xiaoyu Wu Michigan State University.
7th SRF Materials Workshop FRIB SRF Cavities 7/16/12 Chris Compton.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Cavities, Cryomodules, and Cryogenics Working Group 2 Summary Report Mark Champion, Sang-ho Kim Project X Collaboration Meeting April 12-14, 2011.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
650 MHz, Beta = 0.9, 11 April 2012Page 1650 MHz, Beta = 0.9, 11 April 2012Page 1 Project X Beta = 0.9, 650 MHz Cavity and Cryomodule Status Tom Peterson.
EURISOL CB MEETING – PSI – 15 JUNE 2006 Sébastien Bousson IPN Orsay – Accelerator Division TASK 8 STATUS REPORT INFN – Legnaro IPN Orsay.
WP1: Superconducting Cavity Developments and Tests Walter Venturini Delsolaro Mid Term Review Meeting, 26 September 2012 CATHI Marie Curie Initial Training.
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
Alessandro D’Elia- CI/Univ. of Manchester PDRA
Crab Cavity Technical Coordination meeting:
Beam Dynamics Studies of the HIE-ISOLDE Superconducting LINAC at CERN
CERN – Zanon discussions
Oleksiy Dolinskyy December 1st, 2014
WP5 Elliptical cavities
FRIB Cryogenic Support
Overview of the RFCC Module and 201-MHz Cavity Design
Complementary ISTC Projects #3888, 3889p
TTC - JLab - Bob Laxdal - TRIUMF
THE HIE-ISOLDE SUPERCONDUCTING CAVITIES:
HIE-ISOLDE Project: Planning & Resources
V. Veshcherevich Cornell University
HIE-ISOLDE Status & Summary of HIE-ISOLDE SC
HIE-ISOLDE Project: Status Report
IHEP Cryomodule Status
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
Pulsed Ion Linac for EIC
Report on HIE-ISOLDE Status
CERN’s MidTermPlan and the consequences for HIE-ISOLDE
FRIB summary of performance degradation - VTA to cryomodule
HIE-ISOLDE contribution packages
SC ISOL Linac of KoRIA Tae-Sun Park (SKKU).
Presentation transcript:

HIE-LINAC status report Matteo Pasini BE/RF

R&D activity RF – Beam dynamics studies High b cavity prototype Copper substrate manufacturing Chemical etching Nb sputtering RF sub-system prototypes Tuner Power coupler SC solenoid prototype Cryomodule design In parallel preparation of a test stand for QWR at CERN M. Pasini SRF09 Berlin, 20-25.09 2009

HIE-ISOLDE LINAC - layout 3 stages installation 1.2 MeV/u 3 MeV/u 5.5 MeV/u 10 MeV/u 8 M. Pasini SRF09 Berlin, 20-25.09 2009

RF – Beam Dynamics studies Beam Port shape studies Intense studies to match the SC linac to the existing machine. In particular we have looked at different drift tube shapes in order to fully understand the dynamics and the production of halo particles that dilute the beam emittance. The result of the study are reported in a internal cern note before which will be published at the end of the month. The main achievement is that an optimal tune of the optics was found and allow an overall emittance growth on few % even in case of misalignment and other machine errors. THPPO026 M. Pasini SRF09 Berlin, 20-25.09 2009

QWR cavities (Nb sputtered) High beta cavity design has been confirmed and a prototype has been constructed (test will happen the second week of December) M. Pasini SRF09 Berlin, 20-25.09 2009

High –beta cavity final welding and cleaning Cavity has been sputtered successfully with the magnetron technique (new technique for this kind of cavity geometry) All the cavity ancillaries are have been designed and are now in fabrication THPPO010 M. Pasini SRF09 Berlin, 20-25.09 2009

SC solenoid prototype (Nb3-Sn technology) Magnetic length 0.16 m ∫ B2 dz >16.2 T2m Max mechanical length <0.4 Operating temperature 4.5 K Inner Diameter 30 mm Model of the SC solenoid has been constructed test will happen beginning of next year. Mechanical drawings for the model are completed M. Pasini SRF09 Berlin, 20-25.09 2009

Cryomodule design Features: Single vacuum cryostat Side loading of the cold masses Independent alignment of the cavities w.r.t. solenoid Heat shield cooled by He cold gas Conceptual design of the cryomodule completed, need to start detailed design M. Pasini SRF09 Berlin, 20-25.09 2009

The HIE-ISOLDE facility Civil engineering study in advanced status. Will be ready to detailed design at the beginning of next year. Construction is expected to last 18 months and will start depending on cash flow available from cern. M. Pasini SRF09 Berlin, 20-25.09 2009

Summary Cavity prototype completed. Tests to be done @ TRIUMF before the end of the year Cryomodule concept design completed, will start detailed design as soon as manpower is available Preparation of test bench at Cern of QWR resonators (new test cryostat is planned to be ready by Feb/Mar 2010) Complete Cavity configuration test is planned by the end of 2010. M. Pasini SRF09 Berlin, 20-25.09 2009