CLIC Detector studies status + plans

Slides:



Advertisements
Similar presentations
CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Valencia May
Advertisements

CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
Compact Linear Collider. Overview The aim of the CLIC study is to investigate the feasibility of a high luminosity linear e-/e+ collider with a centre.
Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
CARE07, 29 Oct Alexej Grudiev, New CLIC parameters. The new CLIC parameters Alexej Grudiev.
A. Bay Beijing October Accelerators We want to study submicroscopic structure of particles. Spatial resolution of a probe ~de Broglie wavelength.
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
Luminosity Prospects of LHeC, a Lepton Proton Collider in the LHC Tunnel DESY Colloquium May F. Willeke, DESY.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
NLC - The Next Linear Collider Project NLC Backgrounds What’s New? Tom Markiewicz LC’99, Frascati, Italy October 1999.
Photon Collider at CLIC Valery Telnov Budker INP, Novosibirsk LCWS 2001, Granada, Spain, September 25-30,2011.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
F. Richard LAL/Orsay CLIC-ILC connections on Detectors PAC Paris meeting October 20, 2008.
CLIC Workshop 07 CERN, October 2007 Instrumentation Working Group In conference room Bldg Grahame Blair & Thibaut Lefevre.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 Tunnel implementations (laser straight) Central Injector complex.
Current CLIC Energy Stages D. Schulte1. Main Beam Generation Complex Drive Beam Generation Complex Layout at 3 TeV D. Schulte2.
High gradient acceleration Kyrre N. Sjøbæk * FYS 4550 / FYS 9550 – Experimental high energy physics University of Oslo, 26/9/2013 *k.n.sjobak(at)fys.uio.no.
Status of the Rebaselining D. Schulte for the Rebaselining Team D. Schulte, CLIC Rebaselining, October 2013.
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
CLICdp achievements in 2014 and goals for 2015 Lucie Linssen, CERN on behalf of the CLICdp collaboration CLIC workshop, January 30 th
常伝導技術での LC の可能性 LC feasibility consideration with normal conducting technology 第5回「機構の研究推進について」の意見交 換会 (ILC の推進について ) 平成 24 年 2 月 13 日 加速器・肥後寿泰.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
CLIC – ILC R&D, LCUK Meeting / Birmingham Michael Hauschild – CERN, 18-Apr-2008, page 1 CLIC – ILC R&D CLIC – ILC R&D New CLIC parameters revised in 2007.
CLIC Energy Stages Meeting D. Schulte1 D. Schulte for the CLIC team.
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
CLIC Machine-Detector Interface Working Group (MDI) Emmanuel Tsesmelis CERN TS/LEA CLIC-ACE of 3 September 2008.
Global Design Effort CLIC-ILC BDS & MDI work Materials for discussion Daniel Schulte, Rogelio Tomas and Emmanuel Tsesmelis for CLIC team Andrei Seryi for.
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
1 CLIC Detector Studies A. De Roeck CERN. CLIC Detector CERN History, Status + plans 2004 CLIC Study group report: "Physics at the CLIC Multi-TeV.
16 February 2009CLIC Physics & Detectors Konrad Elsener 1... some issues regarding the forward region... (“picking up” from Lucie Linssen, 29 Sept 2008)
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
Already time to think of upgrading the machine Two options presently discussed/studied Higher luminosity ~10 35 cm -2 s -1 (SLHC) –Needs changes in.
8/12/2010Dominik Dannheim, Lucie Linssen1 Conceptual layout drawings of the CLIC vertex detector and First engineering studies of a pixel access/insertion.
Interface between TAC SR and SASE FEL Possibility for testing CLIC structure Avni AKSOY Ankara University.
G.R.White: F.O.N. T. From Ground Motion studies by A.Seryi et al. (SLAC) ‘Fast’ motion (> few Hz) dominated by cultural noise Concern for structures.
Feasibility and R&D Needed For A TeV Class HEP e+e- Collider Based on AWA Technology Chunguang Jing for Accelerator R&D Group, HEP Division, ANL Aug
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
J.P.DelahayeTILC08: 06/ 03/ 081 CLIC-ILC Collaboration? Following visit of CERN (Nov 07)
FCC-ee Interaction Region design
Linear Collider Detector (LCD) project overview
ILC - Upgrades Nick Walker – 100th meeting
Input to Strategy currently planned
Dielectric accelerators in Microwave regime and a short pulse collider concept Chunguang jing AWA & Euclid Techlabs AWLC2017 June, 2017.
CLIC detector, difference with the ILC case
Beam-beam effects in eRHIC and MeRHIC
CLIC Rebaselining at 380 GeV and Staging Considerations
CLIC Klystron-based Design
Have a chance to operate your own beam at CERN
Brief Review of Microwave Dielectric Accelerators
CLIC detector at SiD meeting 28/3/2010
CLIC Study Aim Conceptual design report in 2010
CLIC: from 380 GeV up to 3 TeV Will also study klystron based machine for initial stage.
CLIC-ILC BDS & MDI work.
LCWS 2017 – 26th October C. Rossi
CLIC Drive Beam Stabilisation
Measurements, ideas, curiosities
Linear Colliders Linear Colliders 4 lectures
Report from the CLIC07 Workshop
XFEL Project (accelerator) Overview and recent developments
CLIC source update CLIC main beam injectors reminder
CLIC Detector CERN Status + plans
Status of the CLIC Injector studies
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Status of CTC activities for the Damping rings
Explanation of the Basic Principles and Goals
Barry Barish Paris ICHEP 24-July-10
CLIC Feasibility Demonstration at CTF3
Presentation transcript:

CLIC Detector studies status + plans Contents: Introduction to CLIC accelerator 2004 CLIC Study group report: "Physics at the CLIC Multi-TeV Linear Collider“ CERN participation in Linear Collider R&D (EUDET, DevDet) ILC-CLIC collaboration Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 1

Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 2 CLIC basic features CLIC TUNNEL CROSS-SECTION High acceleration gradient: > 100 MV/m “Compact” collider – total length < 50 km at 3 TeV Normal conducting acceleration structures at high frequency Two-Beam Acceleration Scheme Cost effective, efficient Simple tunnel, no active elements Modular, easy energy upgrade in stages QUAD POWER EXTRACTION STRUCTURE BPM ACCELERATING STRUCTURES 4.5 m diameter Drive beam - 95 A, 240 ns from 2.4 GeV to 240 MeV Main beam – 1 A, 156 ns from 9 GeV to 1.5 TeV 100 MV/m 12 GHz – 64 MW Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 2

Drive Beam Generation Complex Main Beam Generation Complex CLIC layout e+ injector, 2.4 GeV e- injector 2.4 GeV CLIC overall layout 3 TeV e+ main linac e- main linac , 12 GHz, 100 MV/m, 21 km BC2 BC1 e+ DR 365m e- DR booster linac, 9 GeV, 2 GHz decelerator, 24 sectors of 868 m IP1 BDS 2.75 km 48 km drive beam accelerator 2.37 GeV, 1.0 GHz combiner rings Circumferences delay loop 80.3 m CR1 160.6 m CR2 481.8 m CR1 CR2 delay loop 326 klystrons 33 MW, 139 ms 1 km TA R=120m 245m Drive Beam Generation Complex Main Beam Generation Complex Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 3

Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 4 CLIC main parameters http://clic-meeting.web.cern.ch/clic-meeting/clictable2007.html Center-of-mass energy 3 TeV Peak Luminosity 7·1034 cm-2 s-1 Peak luminosity (in 1% of energy) 2·1034 cm-2 s-1 Repetition rate 50 Hz Loaded accelerating gradient 100 MV/m Main linac RF frequency 12 GHz Overall two-linac length 42 km Bunch charge 3.72·109 Bunch separation 0.5 ns Beam pulse duration 156 ns Beam power/beam 14 MWatts Hor./vert. normalized emittance 660 / 20 nm rad Hor./vert. IP beam size bef. pinch 40 / ~1 nm Total site length 48 km Total power consumption 322 MW Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 4

Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 5 3x more energy loss due to beamstrahlung at CLIC w.r.t. ILC e+  e- unavoidable at Linear Colliders in general: small beam sizes -> large beamstrahlung Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 5 CLIcC luminosity spectrum

Time structure of the beam Train repetition rate 50 (100) Hz CLIC 1 train = 312 bunches 0.5 nsec apart ILC  5 Hz 1 train ~2820 bunches ~337 ns apart Experimenting at CLIC similar to the “NLC” Time stamping! Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 6

CLIC links, workshops and time-line CLIC website: http://clic-study.web.cern.ch/CLIC-Study/ CLIC07 workshop, October 2007 http://cern.ch/CLIC07Workshop CLIC08 workshop, October 14-17 2008 CLIC CDR foreseen for 2010 CLIC TDR foreseen for 2014 Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 7

Detector Specifications hep-ph/0412251 ; CERN-2004-005 CLIC Report 2004: Starting point: the TESLA TDR detector adapted to CLIC environment - Detailed studies performed for previous CLIC parameters Update with new CLIC parameters is underway Greater need for time-stamping of events No significant physics difference found previously between NLC and TESLA at sub-TeV energies None expected between old and new multi-TeV parameters Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 8

CERN participation in LC: EUDET 2006-2009 MICELEC: microelectronics user support VALSIM: optimisation of hadronization process in GEANT4 Magnet: magnetic field map of PCMAG magnet at DESY test beam Timepix: development of pixel chip for TPC pixelised readout TPC electronics: development of TPC pad readout (aiming for combined analog/digital readout fitting behind 14 mm2 pads) Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 9

Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 10 PCMAG field map campaign at DESY 2007 OUTPUTS INPUTS 7 standard channels 5 versions TPC pad readout, programmable amplifier 130 nm technology Timepix chip Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 10

CERN contribution to LC tasks in FP7 proposal DevDet http://project-fp7-detectors.web.cern.ch/project-FP7-detectors/Default.htm Test beam for combined linear collider slice tests (providing beam, large magnet, general infrastructures etc.) Continued support for TPC electronics Participation in Project office for linear collider detectors (engineering tools for project office; design support for test beam set-up) Test-case of LC project tools on CLIC forward region example (together with DESY and ILC forward study teams) Software tools (geometry and reconstruction tools) Microelectronics user support Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 11

Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 12

Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 13

Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 14 From: F. Richard, Sendai Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 14

ILC-CLIC working groups First working group meeting, 13/5/2008 Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 15

Topics for CLIC-ILC Detector R&D Summary: Detectors from meeting 8 Feb 08: 1) Define a CLIC detector concept at 3 TeV. (update of 2004 CLIC Study) based on ILC detector concepts. 2) Detector simulations - Simulation tools to be used by ILC and CLIC (WWS software panel) - Validation ILC detector options for CLIC at high energy, different time structure and different backgrounds - 1 TeV benchmark studies to provide overlap - compare performance using defined benchmark physics processes (e.g. WW/ZZ separation) Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 16

Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 17 Continue Summary CLIC/ILC detector R&D, 8/2/’08 3) EUDET /DEVDET ( infrastructure for LC detector R&D, with associated non-EU groups) - microelectronic tools - 3D interconnect technologies (for integrated solid state detectors) - simulation and reconstruction tools - combined test with magnet and LC sub-detectors 4) TPC - TPC performance at high energies (>500 GeV). - TPC read out electronics 5) Calorimetry - Dual Readout Calorimetry (feasible at LC?) 6) General - increased CLIC participation in future ECFA workshops (2008 Warsaw) on LC detectors Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 17

Machine Detector Interface (from summary 8/2/2008) General layout and integration Common meeting/review required Common engineering tools for detector design in preparation (DESY, CERN, IN2P3, FP7) Background and luminosity studies Strengthen support Masking system Constraints on vertex detector Detector field Need a field for CLIC Magnet design Common simulation tools for detector studies Need to review what is available Low angle calorimeters Beam pipe design (LHC) Vacuum etc. (LHC) Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 18

Background and Luminosity Studies (from summary 8/2/2008) Common simulation tools BDSIM () Integration into GEANT? FLUKA (CERN) Halo and tail generation (CERN) Common formats etc Study of machine induced background In particular, neutrons, muons and synchrotron radiation Mitigation strategies e.g. tunnel fillers against muons Study of beam-beam background and luminosity spectrum Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 19

Support, Stabilization and Alignment (from summary 8/2/2008) LAPP, Oxford, CERN, FP7, BNL, SLAC, … Other please join Low-noise design Noise level measurements (DESY, CERN) Among others, measurements at LHC Component design Mechanical design of quadrupole support Final quadrupole design Stabilization feedback design Sensors Actuators Interferometers Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 20

Experimental Area Integration (from summary 8/2/2008) Common definitions Infra-structure Work is quite generic No large differences expected for CLIC detector to some ILC detector Collaboration has started LHC expertise Push-pull Is an option for both projects A collaboration has started Brings ILC/CLIC/LHC expertise Crossing angle Investigate requirements Then study benefits to find a common crossing angle Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 21

Push-Pull studies for two detectors Alain Herve, CERN, et al Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 22

Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 23 Conclusions CLIC physics/detector studies are starting again Many similarities with ILC detector studies Good exchange and collaboration with ILC experts is fundamental and is underway….. thank you Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 23

Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 24 Spare slides Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 24

Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 25 DG to CERN staff Jan 08 Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 25

Two Beam Module Two Beam HW & Int. WG 20760 modules 71460 power production structures PETS (drive beam) 143010 accelerating structures (main beam) Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 26

CLIC Standard Two Beam Module Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 27

Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 28 Single CLIC tunnel with alcoves for drive beam return loops and dumps Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 28

Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 29 Major revision of CLIC parameters made 2007 (final parameter optimization still ongoing) Basic changes 30 GHz -> 12 GHz RF frequency close to old NLC frequency (11.424 GHz) easier to adapt NLC work and experience lower frequency allows more relaxed alignment tolerances 150 MV/m -> 100 MV/m reduces breakdown rate and surface damages in RF accelerating structures 50 km long LINAC allows 2 x 1.5 TeV = 3 TeV CM energy (was 5 TeV) 0.5 ns bunch spacing, 312 bunches (= 156 ns bunch trains), 50 Hz (3 TeV) optimized for maximum luminosity was subject of various changes in the past: 0.667 ns -> 0.267 ns -> 0.667 ns -> 0.5 ns Aim for feasibility and conceptual design report in 2010 Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 29

Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 30 CLIC parameters Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 30

Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 31 CLIC parameters 3x more energy loss due to beamstrahlung at CLIC w.r.t. ILC e+  e- unavoidable at Linear Colliders in general: small beam sizes -> large beamstrahlung CLIcC luminosity spectrum Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 31