Maintenance Philosophy Single spares storage warehouse? – Assumed to be the case Multiple spares storage warehouses? –If so, each will need to be equally.

Slides:



Advertisements
Similar presentations
Inventory Control Models.
Advertisements

Understanding Value Stream Decision Making
1 Impact of Decisions Made to Systems Engineering: Cost vs. Reliability System David A. Ekker Stella B. Bondi and Resit Unal November 4-5, 2008 HRA INCOSE.
Prognostics-Informed Diagnostic Analysis DSI International June, 2011.
Independent Demand Inventory 1. Inventory Firms ultimately want to sell consumers output in the hopes of generating a profit. Along the way to having.
1 SMS – Spares Management Software Overview and Case Studies.
Bernard Price Certified Professional Logistician Supply Management & Model Theory.
MATERIAL STORAGE SYSTEMS Gülşah GEDİK
Reliability McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Parameter: A number describing a characteristic of the population (usually unknown) The mean gas price of regular gasoline for all gas stations in Maryland.
Healey Chapter 7 Estimation Procedures
Optimization problems using excel solver
Business Calculus Applications of Extrema.  Extrema: Applications We will emphasize applications pertaining to business. Basic formulas: Revenue = price.
Lecture 5 Decision Analysis Chapter 14.
Hypothesis Testing A hypothesis is a claim or statement about a property of a population (in our case, about the mean or a proportion of the population)
1 Non-observable failure progression. 2 Age based maintenance policies We consider a situation where we are not able to observe failure progression, or.
Islamic University of Gaza Managerial Accounting
Financial and Managerial Accounting
Replacement Problem.
Scenario  You have last week’s closing stock price for a particular company. You are trying to place a value to a European call option which expires a.
Class 22: Chapter 14: Inventory Planning Independent Demand Case Agenda for Class 22 –Hand Out and explain Diary 2 Packet –Discuss revised course schedule.
Pricing Decisions EMBA 5411 Budgeting and Pricing.
BCOR 1020 Business Statistics
1 Inventory (Chapter 16) What is Inventory? How Inventory works: two ways of ordering based on three elements Inventory models (to p2) (to p3) (to p4)
MNG221- Management Science –
CHAPTER 7 Managing Inventories
Mathematical Statistics Lecture Notes Chapter 8 – Sections
1 Psych 5500/6500 Statistics and Parameters Fall, 2008.
Hypothesis Testing II The Two-Sample Case.
Section 9.1 Introduction to Statistical Tests 9.1 / 1 Hypothesis testing is used to make decisions concerning the value of a parameter.
Determining Sample Size
Copyright © 2011 SYSPRO All rights reserved. Inventory Optimization User Group 17 th August 2011.
MTBF MADE EASY BUT FIRST - A SHORT REVIEW RELIABILITY DEFINED MTBF AND HOW IT RELATES TO LAMBDA AND FIT SOME SYSTEMS WILL HAVE HIGHER FAILURE RATES ESTIMATING.
Chapter 12 Inventory Models
Classifying optimization problems By the independent variables: –Integer optimization --- integer variables –Continuous optimization – real variables By.
Verification & Validation
Fundamentals of Data Analysis Lecture 4 Testing of statistical hypotheses.
Slide Sets to accompany Blank & Tarquin, Engineering Economy, 6 th Edition, 2005 © 2005 by McGraw-Hill, New York, N.Y All Rights Reserved 1-1 Developed.
Sullivan – Fundamentals of Statistics – 2 nd Edition – Chapter 9 Section 1 – Slide 1 of 39 Chapter 9 Section 1 The Logic in Constructing Confidence Intervals.
Fundamentals of Data Analysis Lecture 9 Management of data sets and improving the precision of measurement.
Saving Money The Why, When, and How. Pretest 1. True or False: Only those who are financially well off can save. 2. True or False: The best place to save.
Types of IP Models All-integer linear programs Mixed integer linear programs (MILP) Binary integer linear programs, mixed or all integer: some or all of.
© 2002 Eaton Corporation. All rights reserved. Designing for System Reliability Dave Loucks, P.E. Eaton Corporation.
Statistics for Managers Using Microsoft Excel, 5e © 2008 Pearson Prentice-Hall, Inc.Chap 8-1 Statistics for Managers Using Microsoft® Excel 5th Edition.
Independent Demand Inventory Planning CHAPTER FOURTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
IE241: Introduction to Hypothesis Testing. We said before that estimation of parameters was one of the two major areas of statistics. Now let’s turn to.
1 Chapter 6 Estimates and Sample Sizes 6-1 Estimating a Population Mean: Large Samples / σ Known 6-2 Estimating a Population Mean: Small Samples / σ Unknown.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Blank & Tarquin: 5 th edition. Ch.13 Authored by Dr. Don Smith,
INTEGRATING RELIABILITY, AVAILABILITY, MAINTAINABILITY (RAM) AND SUPPORTABILITY IN REQUIREMENTS Bernard Price Certified Professional Logistician ACHIEVING.
Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall 9-1 σ σ.
Equipment Replacement Four Really Great Models 1. Deterministic Age Replacement 2. Minimal Repair Model 3. Repair versus Replace 4. Block Replacement.
Downtime Reduction Ideas for a Symposium Presentation and Training
BERNARD PRICE Certified Professional Logistician Supportability Optimization to Achieve Availability Goals in Acquisitions.
Copyright © 1998, Triola, Elementary Statistics Addison Wesley Longman 1 Estimates and Sample Sizes Chapter 6 M A R I O F. T R I O L A Copyright © 1998,
Using Probability Distributions for Project 2. Class Project How can probability distributions help us price a stock option? Last time we computed the.
Understanding Basic Statistics Fourth Edition By Brase and Brase Prepared by: Lynn Smith Gloucester County College Chapter Nine Hypothesis Testing.
Example 9.13 Sample Size Selection for Estimating the Proportion Who Have Tried a New Sandwich Controlling Confidence Interval Length.
Fundamentals of Data Analysis Lecture 4 Testing of statistical hypotheses pt.1.
Sampling: Distribution of the Sample Mean (Sigma Known) o If a population follows the normal distribution o Population is represented by X 1,X 2,…,X N.
Slide 1. © 2012 Invensys. All Rights Reserved. The names, logos, and taglines identifying the products and services of Invensys are proprietary marks.
Chapter 6 Inventory Control Models 6-1
Chapter Nine Hypothesis Testing.
Inference: Conclusion with Confidence
5 INVENTORY MANAGEMENT.
Inventory Models (II) under SC environment
Inventory Optimization-Introduction
Statistical Intervals Based on a Single Sample
Module 2: Supply Chain & Logistics Management
Cost Behavior Analysis
Presentation transcript:

Maintenance Philosophy Single spares storage warehouse? – Assumed to be the case Multiple spares storage warehouses? –If so, each will need to be equally stocked to provide the necessary spare when needed. –If it was determined that only 1 spare was mathematically needed to support the system, then the quantity will need to be increased to match the number of spare storage warehouses.

Spares Calculation Parameters Annual Operating Requirement (AOR) in Hours Pipeline Time (average time to receipt of part after ordering) Target Confidence Factor value (probability of having a spare when needed): usually 95% Total system quantity for parts to be spared

Confidence Factor Formula The confidence factor value is the probability that a spare will be available in the event of a failure, expressed as a percentage. The higher the value, the greater the probability that a spare will be available. –Higher spares quantities yield higher confidence factor values. –Lower pipeline time yields higher confidence factor values. –Higher MTBF values yield higher confidence factor values. –Lower system quantities yield higher confidence factor values.

Spares Modeling Goal: Determine a recommended quantity of spare parts to achieve a desired confidence level. Tool: Applies the following logic to determine the recommended Spare Quantity value.

Spares Modeling This example shows how variable inputs impact the confidence factor Confidence Factors expressed as percentages. System Qty represents how many of the spared item are contained in a system.

Replenishment Methodology Example For module XYZ12345, expected failures for 60 months is 0.26 The condemn rate indicates the percentage of failed assemblies that cannot be repaired after failure (5% for our example) When this occurs, a Replenishment Spare is needed as a replacement. Replenishment Spares values are driven by both the part criticality and the comfort level of program management: Minimal Sparing (expected failures * condemn rate) = 0.0 to 0.99 = no spare 1.0 to 1.99 = 1 spare 2.0 to 2.99 = 2 spares Etc… Average Sparing (expected failures * condemn rate) = 0.0 to 0.49 = no spare 0.5 to 1.49 = 1 spare 1.5 to 2.49 = 2 spares Etc… Maximize Sparing (expected failures * condemn rate) = 0.01 to 1.0 = 1 spare 1.01 to 1.99 = 2 spare 2.01 to 2.99 = 3 spares Etc…

Replenishment Quantity Report

Spares Cost Report

Expensive Spares – Trade-offs Here is an example to illustrate the impact of reducing the spare quantity by 1 of the most expensive items on the list. In some cases, the Confidence Factor may still be an acceptable level considering the money saved. For example, lets say we have a radar system and we are looking to spare the most expensive part in the system. In our example, the system normally requires 3 spares to support 4 radar systems (for Annual Operating Requirement of 2000 hours) to have a Confidence Factor greater than 95%. Consider the following: 3 spares yields a 98.23% Confidence Factor 2 spares yields a 92.36% Confidence Factor Is the trade-off acceptable?

For more information contact: Rich Herman