AWMA Georgia Chapter Regulatory Conference

Slides:



Advertisements
Similar presentations
DRAFT IRON & STEEL FOUNDRY MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART EEEEE.
Advertisements

Part 63 Boiler Rule for Area Sources AWMA Conference September 11-14, 2012 Biloxi, MS Lee Page Air Toxics Assessment and Implementation Section U.S. Environmental.
Adjustments to the Air Toxics Standards for Major and Area Source Boilers 40 CFR Part 63, Subparts DDDDD and JJJJJJ Summary of Final Changes, Key Highlights.
Boiler GACT Update Georgia AWMA Conference
Managing Air Quality Data 101 Presented by: Chris Bellusci (GeoEngineers) & Claire Lund, PE (Sanborn Head) International Conference for Environmental Data.
RICE MACT and Oil Analysis
The Reciprocating Internal Combustion Engine (RICE) MACT Summary
Air Permitting in Colorado Martha Hyder Wind River Environmental Group LLC September 2013.
Florida Department of Environmental Protection Air Resource Management Orange County Environmental Streamlining Task Force May 4, 2011 Air Resource Management,
Emergency Engine Emissions Standards
Regulatory Update. January Meeting Recap/Update Enforcement News -Wal-Mart -MSHA Advanced Notice -EPA – Clean Water Act (CWA) & EPD -OSHA – Stone, Clay,
New Emission Rules for IC Engines Presented by Scott Wallace Devon Gas Services, L.P.
New Federal Regulations for Internal Combustion Engines Doug Parce.
Boiler MACT and Other Air Developments 2011 Southern Section AWMA Conference Callaway Gardens, GA Boiler MACT and Other Air Developments 2011 Southern.
Compliance and Enforcement: Investigation Overview.
Air Protection Branch 1. 2 Air Quality Activities Support the Mission of the Air Protection Branch Monitor and Report Air Quality Data Analysis and Planning.
How to Implement the CalARP Program
NCMA Workshop March 24, 2015 Booker Pullen Supervisor, Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919) Permitting.
Compliance Update NCMA 2015.
Air Quality Regulations and Academic Institutions Steve Hall Environmental Engineer II NC DENR – Division of Air Quality Raleigh Regional Office.
Environmental Protection Division 1 AWMA Georgia Air Update August 10, 2007 Heather Abrams, Branch Chief.
Managing Air Quality Data 101 Presented by: Chris Bellusci & Claire Lund, PE (Sanborn Head) International Conference for Environmental.
A&WMA Georgia Regulatory Update Conference Current State of the Air in GA Jac Capp, GA EPD, Branch Chief, Air Protection Branch April 16, 2013.
Mustang Watchdog April 22, 2014
Air Toxics in Region 4 A&WMA Annual Conference August 6, 2008 Lee Page Air Toxics Assessment and Implementation Section EPA, Region 4 Atlanta, Georgia.
1 Improving Environmental Protection and Reducing Administrative Burden North Carolina Division of Air Quality Improving Environmental Protection and Reducing.
Hot Topics in CAA – 112(r) Federal Program Update GA AWMA REGULATORY UPDATE CONFERENCE Adam G. Sowatzka April 16, 2013.
Compliance Assistance and Ambient Air Monitoring Brian Hutchins Supervisor, Air Quality Bureau July 2014.
Where to find Information About Facilities. Overview of Title V Permits.
Our Vision – Healthy Kansans living in safe and sustainable environments.
GA EPD Air Protection Branch AWMA Southern Section August 2015.
Environmental Protection Division Air Quality Update Georgia EPD Jimmy Johnston Georgia Environmental Protection Division August 5, 2010.
| Philadelphia | Atlanta | Houston | Washington DC Boiler MACT Compliance Plans: Failure to Develop Plans Is Planning to Fail Susie Bowden|
Title V Operating Permit Program 1 Section 1: Intro to Title V Laura McKelvey U.S. EPA.
Title V: The Big Picture
Joe Foutz November 15, 2012 NC DAQ Charlotte, NC Mooresville Regional Office.
1 Air Enforcement Matt Haber Senior Advisor Office of Enforcement and Compliance Assurance.
Georgia’s 112(g) Experiences Eric Cornwell Acting Manager Permitting Program.
Nez Perce Tribe Experience with Enforcement and Tribal Credentials Mary Fauci Nez Perce Tribe.
COMPLIANCE MONITORING and INSPECTIONS Or, how to run an effective program through an adequate field presence.
New Air Quality General Permit G-70A Oil and Natural Gas Industry Workshop October 24, 2012 Laura Jennings Engineer DEP – Division of Air Quality 10/24/2012.
EBC New Hampshire Chapter EBC New Hampshire Chapter Report from the NH DES Division Directors.
Hot Topics in Air Quality NAAQS, Regulations, and Other Developments Jeff Slayback A&WMA Southwest Ohio Chapter August 19, 2010.
Joe Foutz March 27, 2012 – Hickory, NC Division of Air Quality March 29, 2012 – Raleigh, NC Mooresville Regional Office.
AWMA – Georgia Chapter Air Permitting Update May 1, 2014 Eric Cornwell Stationary Source Permitting Program.
Field Services and Compliance Bureau Joe Sanfilippo Supervisor Field Office 1 Air Quality Enforcement Coordinator.
NAAQS Status in GA & PSD Inventory Update James W. Boylan Georgia EPD – Air Protection Branch Manager, Planning & Support Program AWMA Regulatory Update.
AGENCY ROLES Level 1B: Advanced Fundamentals July 2016 LOCAL, STATE, FEDERAL 1.
Complying with Periodic Emissions Monitoring Requirements
Preparing for Permit Review
What we’ll cover: How EPA enforces the Clean Air Act, including permits Roles for tribal governments in enforcing NSR permits.
Introduction to the Compliance Spreadsheets
Our Vision – Healthy Kansans living in safe and sustainable environments.
Rules for Existing Municipal Solid Waste Landfills
What is the Boiler NESHAP?
Simple but Complicated Air Quality Permitting for Generators
Environmental Management Information System (EMIS2)
What we’ll cover: How EPA enforces the Clean Air Act, including permits Roles for tribal governments in enforcing NSR permits.
Georgia Air Regulatory Update
Air Quality Permitting Guidelines for Industrial Sources
What to Report How to Comply
Level 1B: Advanced Fundamentals Effective August 2018
What we’ll cover: How EPA enforces the Clean Air Act, including permits Roles for tribal governments in enforcing NSR permits.
The Air Emission Landscape for Engines Coalbed Methane Association of Alabama 29th Annual Meeting May 28, 2015.
Air and Water Management Association Regulatory Conference Symposium
Air Update, Georgia EPD Karen Hays Chief, Air Protection Branch
Air Permit Application Fees
START Stationary Reciprocating Internal Combustion Engines (RICE)
Air Quality Committee May 13, 2015
Air Quality Permitting Guidelines for Industrial Sources
Presentation transcript:

AWMA Georgia Chapter Regulatory Conference Compliance Update April 2013

Stationary Source Compliance Program Air Toxics Unit Risk Management MACT/GACT Implementation VOC/Combustion Unit Chemicals/Minerals Unit Small Business Environmental Assistance Program

GA EPD District Offices Districts and Locations: District CAA Responsibilities: Mountain (Cartersville and Atlanta) Northeast (Athens and Augusta) West Central (Macon) Southwest (Albany) Coastal (Brunswick) Some synthetic minor (SM) sources Permit-by-rule sources, most true minor or “B” sources Some Title V sources for Cartersville and Coastal Complaint investigations Open burning

Inspection Breakdown for FFY 2012

Upcoming Deadlines (existing sources) Rules Description Requirement Date RICE MACT – 40 CFR Part 63 Subpart ZZZZ CI engines at area sources of HAP Compliance Deadline 5/3/2013 CI engines at major sources of HAP Non-emergency CI > 500 CI engines ≤ 500 HP SI engines at area sources of HAP 10/19/13 SI engines ≤ 500 HP at major sources of HAP Area Source Boiler Rule – 40 CFR Part 63 Subpart JJJJJJ Boilers at area sources of HAP, EXCEPT gas-fired Initial Notification 1/20/2014 3/21/2014 Boiler MACT – 40 CFR Part 63 Subpart DDDDD Boilers at major sources of HAP 5/31/2013 Boilers at major source of HAP 1/31/2016

What’s “new” in SSCP? Collection of permit fees Compliance assurance with fewer onsite inspections Streamlining inspection reports Minimum data requirements submitted to EPA http://www.epa-echo.gov/echo/ 2010 EPA Audit State Review Framework http://www.epa.gov/compliance/state/srf/index.html

enforcement statistics

Determination of Alleged Violations

Tips and Reminders… Title V renewal applications Monitoring and recordkeeping… Most inspections are unannounced… so, do you have a plan if the environmental contact is not at the plant when the inspector arrives? Synthetic minor and Title V permit fees are due even if the Facility did not operate that year Questions about permit requirements? Ask EPD investigates all complaints

Manager, Stationary Source Compliance Program Karen Hays Manager, Stationary Source Compliance Program 404-363-7115 Karen.Hays@gaepd.org