Teleconference ACS – FREIA 20th February 2018

Slides:



Advertisements
Similar presentations
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
Advertisements

Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
128 April 2008 Spectrometer Solenoid Fabrication Update MICO Meeting 19 May 2008 S. Virostek, M. Zisman LBNL.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #145 December 15, 2011.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
S. Barbanotti - DESY Requirements Conformance for SRF Cryomodules Workshop 16/10/2014 – ESS, Lund XFEL cryostat main components: Quality Assurance and.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
S A Griffiths CM42 June 2015 Electrical & Control.
Final Design Cryogenic and mechanical configurations
Teleconf ACS – FREIA 28th March 2017
Teleconference ACS – FREIA 31th May 2017
Status of the M-ECCTD F. Peauger - P. Bosland
Teleconf ACS – FREIA 13th March 2017
Mechanical and cryogenic configurations
Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973
UPPSALA UNIVERSITY GERSEMI
Medium beta cryomodule demonstrator M-ECCTD
HFM Test Station Main Cryostat
Complementary ISTC Projects #3888, 3889p
Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973/7200
Teleconference ACS – FREIA 18th April 2017
BINP, Sergey Pivovarov, Panda magnet meeting at GSl, June 07, 2016
Teleconference ACS – FREIA 10th May 2017
Cryostat design Mechanical design: Thermal screens: Specifications:
Teleconference ACS – FREIA 17th October 2017
Functional interfaces
Teleconference ACS – FREIA 31st October 2017
Niklas Templeton – STFC – UK Collaboration
Far Detector Activities Late 2017 – Early 2018
(vertical cryostat, Gersemi)
Status of the cryogenic system for B180
The 11T cryo-assembly: summary of design and integration aspects
Cryostat design Mechanical design: Thermal screens: Specifications:
Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973/7200
SNS PPU Cryomodule Instrumentation
Cryomodule Assembly Plan
Prototype cryomodule development
PANDA The conceptual design of the control Dewar
Double-Spoke Cavities
CRYOMODULE FINAL ASSEMBLY
as a prototype for Super c-tau factory
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
Teleconference ACS – FREIA 19th June 2017
ESS Spoke cryomodule testing: cryogenic experience
UPPSALA UNIVERSITY_GERSEMI PROJECT
(vertical cryostat, Gersemi)
SNS PPU Cryomodule Instrumentation
SC1R Cold Box PDR Assembly Sequence
Cryogenic upgrade of B165 CRG Status Meeting 16th may 2019
CRYOMODULE FINAL ASSEMBLY
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Presentation transcript:

Teleconference ACS – FREIA 20th February 2018 Agenda: Manufacturing follow-up Control and command status Planning Commissioning tests Installation at Uppsala

Manufacturing follow-up Magnet insert: Welding of the top plate Welding of the thermal screens Support assembly Internal components HX683 Issues: Copper tube supply delayed to March New flanges required for the vacuum box 20/02/2018 Teleconf ACS - FREIA 20th FEBRUARY 2018

Control and Command status ISII-tech was present during the tests providing: Formation Technical support Technergie still have few work to complete on the vertical cryostat Due to the delay of the magnet insert manufacturing, ACS asked CD to send the electrical cabinet with the cryostat, Electrical tests on the magnet insert will be done with electrical test boxes Mechanical tests (leak test, thermal shock, vacuum) doesn’t require the electrical cabinet 20/02/2018 Teleconf ACS - FREIA 20th FEBRUARY 2018

Teleconf ACS - FREIA 20th FEBRUARY 2018 Planning: GERSEMI   2018 January February March April May June 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 magnet insert manufacturing magnet insert mechanical testing final electrical wiring of control cabinet & test vertical cryostat electrical wiring repair control cabinet & automaton test factory acceptance test with simulator control cabinet & automaton test with magnet insert packing & delivery - vertical cryostat - valve box & simulator - control cabinet - magnet insert onsite installation of project onsite cryogenic tests with simulator onsite final installation of project with liquid insert onsite acceptance tests with liquid insert onsite acceptance tests with magnet insert 20/02/2018 Teleconf ACS - FREIA 20th FEBRUARY 2018

Teleconf ACS - FREIA 20th FEBRUARY 2018 Planning: GERSEMI Week 08 Monday: MLI final check Wednesday-Thursday: carting VB + VC + simulator Shipping : end of W08 – beginning W09 Delivery at Uppsala: early March Ongoing tasks Disassembly Packaging Listing, documentation Additional: VC thermal shield modification (baffle, paint) CD preparation List of repair (to be done after shipping) 20/02/2018 Teleconf ACS - FREIA 20th FEBRUARY 2018

Teleconf ACS - FREIA 20th FEBRUARY 2018 Commissioning test Final mechanical tests: He leak tests vessels, circuits and valves Assembly of the multiline L012 (VC side) 20/02/2018 Teleconf ACS - FREIA 20th FEBRUARY 2018

Teleconf ACS - FREIA 20th FEBRUARY 2018 Commissioning test Simulator allows the control of the following sequences (liquid mode): 1 VB, conditioning LHe circuit 3 VB, conditioning She circuit 5 VB thermal shield cooling 8 LHe level measurement 9 VB cooling +4K tank control level 10 cavity cooldown 12 cavity in operation @4K 14 cavity in standby @40K 21 VB warm-up 22 VC warm-up 24 VC isolated or connected to He recovery circuit 25 VB isolated or connected to He recovery circuit Some sequences couldn’t be tested in CD workshop due to the absence of external components: LHe production Double reheater + recovery system 20/02/2018 Teleconf ACS - FREIA 20th FEBRUARY 2018

Installation at Uppsala Time planned for installation? Mechanical Electrical connections Transfer lines ACS presence for: Assembly validation Commissioning tests 20/02/2018 Teleconf ACS - FREIA 20th FEBRUARY 2018

Thank you for your attention Q&A Thank you for your attention 20/02/2018 Teleconf ACS - FREIA 20th FEBRUARY 2018