ABC Change Orders College of Environmental Design

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

Construction Contracting
FACTORS AFFECTING CONSTRUCTION COSTS IN SAUDI ARABIA By Yaser Abdulla Al-Juwairah Presented by Shaikh Imran Abdul Qayyum Gani.
Software Solutions for Landscape Professionals Change Orders made easy with DS|Manage360 Planning for Profitability 2012 Webinar Series June 28, 2012 Presenter:Marcus.
Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
Procurement Management
CARLIN LAW GROUP, APC Dispute Resolution Procedures Contract Claims Requirements Public Contract Code § (schools) Public Contract Code §20104 Government.
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
1 MOSS ADAMS LLP | 1 Case Studies in Contract Close Out Audits May 2014.
GENEVA GROUP INTERNATIONAL World Conference - Rome, Italy October 19, 2012 Att. Patrizia GIANNINI.
Price Undertakings Under U.S. Antidumping Duty Law Prepared by Import Administration, U.S. Department of Commerce for the June 2 nd Korea Trade Commission’s.
CONSTRUCTION ADMINISTRATION Preconstruction Operations Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
KING FAHD UNIVERSITY OF PETROLEUM & MINERALS DHAHRAN, SAUDI ARABIA Construction Engineering & Management CEM-520 CHANGE ORDERS IN CONSTRUCTION PROJECTS.
Presentation for Thesis of Master Degree Done by Ali Abdullah Al Salman CEM – 520 Term Project (Paper Presentation) Assessments of Risk Management Perception&
Project Cost Management Estimation Budget Cost Control
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
King Fahd University of Petroleum and Minerals Department of Construction Engineering and Management CEM Instructor: Dr. Soliman Al-Mohawis Important.
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
KFUPM, Department of Construction Engineering and Management CEM 520 LIABILITY ALLOCATION AMONG THE PARTIES TO FIXED-PRICE CONSTRUCTIN CONTRACTS IN SAUDI.
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
Construction Industry Development Board development through partnership Construction Procurement documents 2c.
Chapter 2 A Strategy for the Appraisal of Public Sector Investments.
Construction Engineering 221 Contracts & Contractor Procurement.
CONTRACT DOCUMENTS DISCREPANCY IN THE ROYAL COMMISSION BUILDING PROJECTS AT JUBAIL By: AHMAD SAID AE-KHAMIS CEM 520 Presented by Abdul-Mlik M Al-Saeed.
Construction Engineering 380 Contract Changes. Types of changes –Cardinal change- drastic change, either single direction or accumulated change in scope.
1 Construction Claims in Residential Houses in Saudi Arabia Presented by Adel Al Rabee.
CEM 520: Construction Contracting and Administration 03 June 2007
Construction Management: At Risk. PROJECT MANAGEMENT STRUCTURE: Contractual Relationships Owner Architect/Engineer General Contractor Sub Construction.
Standards of Practice Course
1 Pertemuan 15 Audit Performance Matakuliah:A0274/Pengelolaan Fungsi Audit Sistem Informasi Tahun: 2005 Versi: 1/1.
Field Questions. –Asked by sub or GC when discrepancy in construction docs or existing site conditions Design change verification request Field information.
CONSTRUCTION ADMINISTRATION Changes and Extra Work in Construction Management Dr. Alaattin Kanoğlu Spring, 2013 Professonal Practice Management I.B.U.
1 Outsourcing: Managing the relationship Example: Reclining chair project FIGURE 12.1.
CONTROLLING TIME. ”Remember that time is money” Benjamin Franklin 1748.
An-Najah National University Graduating project II Delay in construction projects.
Compensation events and claims Presented by Prof. Khem Dallakoti.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. A contract is a legally binding agreement between two or more parties.
Advanced Project Management Project Procurement/Contract Management Ghazala Amin.
King Fahd University of Petroleum & Minerals
CHANGE ORDER & BACKCHARGES PREPARED BY ABDULAZIZ M. AL-BESHR ID# PREPARED FOR Dr. ABDULAZIZ BUBSHAIT.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Agency Construction Management :CM NOT AT-RISK
Angelica R. Armenta FAR Study Group – Jan Only contracting officers acting within the scope of their authority are empowered to execute contract.
CONTRACT PRICING ALTERNATIVES Presented by: Fahad H. Al-Anazi CEM 520 February 27,1999.
Service Quality Innovation Trust Safety The Samet Way “Managing the Company Cash Position” Accounts Payable (AP) should always be less than Accounts Receivable.
CON 2001 CVE 4070 Construction Methods/Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
University of Calgary Continuing Education Construction Contract Law and Documents Week 12 Changes Delays Claims Contract Documentation.
1 A Seminar On Pharmaceutical Outsourcing A Seminar On Pharmaceutical Outsourcing.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
1 Chapter 8 karvaytMélKMerag nig kareFVIr)aykarN_ nig karbiTKMerag Project Evaluation, Reporting, and Termination.
CVE 4070 Construction Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
Presented by: Jane Bachynski March 1, 2016 Avoidance and Management of Construction Claims – Fact or Fiction?
By Khalil T. Hasan Construction Solutions ( Joint Operation/Administration of multiple FIDIC Forms – A Case Study.
CHANGE ORDER/CLAIMS MANAGEMENT MODULE 9. Change Order Management.
Procurement Management
Dispute Resolution Between ICT Service Providers in Saudi Arabia
Change Management V.N.Bhaskar Rao Engineering & Construction Director Amec Foster Wheeler India Operations.
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
The Project Development Process:
Certificates JCT 11 SBC allows for 10 different kinds of certificates.
An - Najah national university Civil engineering department
Directed Change Constructive Change
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

ABC Change Orders College of Environmental Design Department of Construction Engineering & Management Construction Contracting and Administration Change Orders Al-Muhammadi, Faisal H. Al-Harthi Majed H.

Change Orders INRODUCTION PREVIIOUS STUDIES OBJECTIVES & LIMITATIONS TYPES OF CHANGE ORDERS CAUSES OF CHANGE ORDER CONCLUSION RECOMMENDATIONS

INRODUCTION Many articles have been written on orders. A change is defined in literature as many deviation from an agreed upon well-defined scope and schedule. A change order is the formal document that is used to modify the original contractual agreement and become part of project’s documents. A change order is a written order. It means the parties have entered into a new contract. A change must be managed well in order to minimize its cost, schedule and consequential effects.

PREVIIOUS STUDIES In the United States of America an extensive analyses have been done about contract modifications whereas in Saudi Arabia a single study has been done. Different surroundings, environmental and cultural factors have taken into consideration while doing the study.

OBJECTIVES & LIMITATIONS Undertake comprehensive analysis of types of construction contract change orders. Rank the frequency of all types of contract change orders in Saudi Arabia. Identify the severity factors of causes of contract change orders in Saudi Arabia. Recommend methods oaf effectively control contract change orders in Saudi Arabia.

TYPES OF CHANGE ORDERS Most construction practitioners follow two categories of change order Informal and Formal change order. Formal Change Order Informal Change Order

Formal Change Order Unilateral Change Order. Bilateral Change Order. A change introduced by the owner or his agent under the mechanism of the change clause is called Formal or Direct Change Unilateral Change Order. Bilateral Change Order. Two-part Change Order. Notice to Proceed on Change Order “to be Negotiated”.

Unilateral Change Order A unilateral change order is issued when an agreement is reached in negotiations or when a contractor fails to submit his proposals in time. It is based on the owner’s estimate of cost and time for work

Bilateral Change Order It is a supplementary agreement whereby the owner’s directives are issued to the contractor with a bilateral agreement as to price or time. The supplemental agreements are understood as being mutual agreements for the parties to increase or decrease the work agreed upon

Two-part Change Order Under the following conditions, two-part change orders are used when it is necessary to issue a notice to proceed before agreement

Notice to Proceed on Change Order “to be Negotiated”. If the work must proceed before the pricing basis and/or schedule adjustments can be agreed, a written order will be issued

Informal Change Order A change that resulted from a failure to do or not to do on the part of the owner or owner’s agent is called a Constructive Change, and it occurs when the agent of the owner acts in a manner that has the same effects of formal written change order. This type is not initially documented as a change and hence becomes a potential source of dispute

CAUSES OF CHANGE ORDER There are many causes of change order that may impact a construction project. Change of Plans by Owner: Change of plan or scope of a project is most significant cause of changes in construction. This type of change is normally costly especially if made later in the construction process.

CAUSES OF CHANGE ORDER 2. Owner’s Financial Difficulties: This would force him to make changes in an attempt to reduce cost. Again proper planning and review of the project cash flow is enough to eliminate this problem.

CAUSES OF CHANGE ORDER 3. Substitution of Materials or Procedures: If the contract calls for the certain materials or work procedures, then a change order is required to substitute these materials or procedures.

CAUSES OF CHANGE ORDER 4. Change in the design: This happens most in project where construction starts before design is finalized.

CAUSES OF CHANGE ORDER 5. Lack of Coordination: The owner should convey his new ideas and concerns which form the basis for changes to the consultants in a timely manner. Ways to improve coordination include coordination meetings, progress reports and conference cells among others.

CONCLUSION One of the main causes of change order is the poor of early planning of the project. Before starting a project, both the owner and the contractor are responsible for this. Coordination and communication amongst various parties working on the project is of great importance to improve management and this controls problems and reduce change order.

CONCLUSION Contract documents are very important cause of change order. There are always a lot of errors and confusions in the wordings, phrases, and sentences of the contracts, which results in many problems and changes.

CONCLUSION One of the common reasons of change order is poor organization and performance of contractor.

CONCLUSION Failure during construction and shortages of materials and equipment are major problems faced in construction which causes a change to the previous planned work schedule.

RECOMMENDATIONS Clarity in Change Order Procedure Before commencement of a project, the project engineer should clarify the followings:

RECOMMENDATIONS All parties should agree the procedure to handle changes All the forms and instructions to complete them should be made available. The people who are responsible for approving, negotiating and reviewing should be identified. By applying the above procedure, a lot of time and efforts in the beginning will be saved and the clarity of these procedures will be become clear

RECOMMENDATIONS Approval in Writing No changes should be made without any approval in writing. It is difficult to prove for compensation if there is no authorization in writing from the owner. In the hectic environment of construction many verbal agreement can be forgotten leaving the contractor disarmed in the batter to get compensation for a change.

Thank You