40-200 ¾”-2”.

Slides:



Advertisements
Similar presentations
RP-500 ½- 1. Modification Overview Production of the RP500 began in 2007 and is current. Production of the RP500 began in 2007 and is current.
Advertisements

RP4A 2½ – 6. Modification Overview Production of the RP4A series began in Production of the RP4A series began in A Lead free version (4ALF)
RP4AN 21/2 – 6. Modification Overview Production of the RP4AN series began in Production of the RP4AN series began in The 4AN indicates an.
¾”-2”. Modification Overview  Production of the series began in 1989 and is current.  Early models of ¾”-2” series did not always.
RPDA 4A 2½” – 6”. Modification Overview  Production of the RPDA 4A series began in  The RPDA 4A can utilize either a Type I or Type II bypass.
860 (LF), 880 ½”- 2” 860 (LF), 880 ½”- 2”. Modification Overview  Production of the ½ - 2” 860 series began in 1997 and is current.  The 880 is an “N”
860 21/2”-10”. Modification Overview  Production of the 2½” – 10 sizes began in  Lead free version (LF860) was introduced in Parts do not.
825, 825Y, 825YD 21/2”-10”. Modification Overview  825- ( ) Cast iron body- Threaded in seats- Internal check parts are epoxy coated iron. Old.
975, 975XL ¾”-2” 975, 975XL ¾”-2”. Modification Overview  Production of the original 975 began in This version had buna-n check discs and did not.
975DA 2½”-10”. Modification Overview  Production of the 975DA began in 1993 and was discontinued in  The 975DA uses a ¾” 975XL for the bypass.
200B ½”-2”. Modification Overview  Production of the 200B (Watts 719) began in 2003 and is current.
825Y(YA) 3/4”-2”. Modification Overview  Production of the 825Y began in 1978 and is current.  The 825YR ( ) had replaceable check seats. **
800 (M2,M3,M4) ½”-2”. Modification Overview  The original model 800 was produced from  The 800M2 was produced from  The 800M3.
375AST 21/2”-10”. Modification Overview  The stainless steel (ST) series was introduced in  This version has a stainless steel body. ***(Parts.
375, 375XL ¾”-1”. Modification Overview  Production of the ¾”-1” 375 began in 2004 and is current.  The lead free version 375XL was introduced in 2010.
475, 475V 2½”-3”. Modification Overview  Production of the 2½ - 3” sizes began in  The lead free version (XL) was introduced in 2011.
806, 806YD 3”-10”. Modification Overview  806- ( ) Cast Iron body- Threaded in seats- Internal check parts are epoxy coated iron.  806YD- (1988-present)
LF866 2½”-10”. Product Overview  Production of the 2½” – 10” sizes began in  The LF866 utilizes a Type 2 bypass (Model LF619 single check).
4V-500 ½”-2”. Modification Overview  Production of the 4V-500 PVB began in  The 4V utilizes a float assembly that contains a relief valve that.
4D-200, 4D-700 2½”- 10”. Modification Overview  Production began in 2003 and was discontinued in  The 4D-700 (RPDA) uses a Type-II bypass (single.
½”-10”. Modification Overview  Production of the series began in 1989 and is current.
RPZ 2½”- 10” RPZ 2½”- 10”. Modification Overview  Production of the RPZ in sizes 2½ - 10” began in 1993 and is current.
375, 375XL 1¼” -2”. Modification Overview  Production of the 1¼” -2” 375 began in 2004 and is current.  The lead free version 375XL was introduced in.
RPZ, RPZE ½”-2”. Modification Overview  Production of the model RPZ began in  The lead free version ( RPZE ) was introduced in 2002 and is current.
450 4”-10”. Modification Overview  Production of the 4” - 10” sizes began in  The lead free version (XL) was introduced in 2011.
PVB ¾”- 2”. Modification Overview  Production for the ¾” – 1” PVB began in 1995 and is current.  The body of the ¾” – 1” PVB was modified in July of.
”-10”.
½”-10”.
475, 475V, 475XL 4”-10”.
826YD 21/2”-10”.
009 2½”-3”.
RP4A (LF) ½”-2”.
PVB-4A ½”- 2”.
720A ½”-2”.
420, 420XL ¾”-1”.
RPDA 4AN 21/2” – 6”.
2000SS 2½”-12”.
800 (M2,M3,M4) ½”-2”.
830, 831 4”- 6”.
805Y, 805YD 21/2”-10”.
DCV, DCVE ½”-2”.
½”- 2”.
½”-10”.
007DCDA 2”.
806, 806YD 3”-10”.
¾”-2”.
450 2½”- 3”.
DC4A (LF) ½”-2”.
RPZ-II, RPZE-II ½” , ¾” , 1½”.
774 DCDA 21/2”-12”.
909 3/4”-2”.
4000B (M3) ½”-2”.
4D-100, 4D-600 2½”- 10”.
DC-500 ½”- 1”.
LF856 2½”-10”.
850 (LF) ½”- 2”.
719 ½”-2”.
950, 950XL, 950XLT ¾”-2”.
2000SS 2½”-12”.
880V 21/2”-10”.
975 2½”-10”.
774 2½”-12”.
4000CIV 21/2”-10”.
375DA 2½”-10”.
919 ¾”-2”.
950DA 21/2”-10”.
007DCDA 2”.
DC4AN 2½” – 6”.
450DA 4”-10”.
709 3/4”-2”.
Presentation transcript:

40-200 ¾”-2”

Modification Overview Production of the 40-200 series began in 1989 and is current. Early models of ¾”-2” 40-200 series did not always have replaceable check seats. In 1994 replaceable seats became standard.

Check Cover Removal Cover is threaded into body and o-ring sealed. Cover is spring loaded. Loosen cover with wrench, then remove by hand while holding firmly against spring pressure.

Check Valve Removal Poppet style check valve. The poppet and spring are free once the cover is removed.

Check Seat Removal Seats are threaded and o-ring sealed. A “special tool” is needed for removal.

Check Disc Replacement Remove the screw and disc washer from poppet.

Check Valve Reassembly Notes Inspect and clean the guide bore on the cover. The stem must move freely in the guide bore. Reassemble in reverse order.

RV Cover Removal RV Cover is sealed by the diaphragm. Spring load is contained.

RV Module Removal Remove outer diaphragm. Module is o-ring sealed. Pull module straight out of body.

RV Seat Removal RV seat is threaded and o-ring sealed. A “special tool” is needed for removal. * Be careful not to over tighten plastic seat.

RV Disc Replacement Holding the module in one hand, remove the screw and retaining washer. Remove the seat disc.

Disassemble RV Module Module is spring loaded. Holding the diaphragm plate firmly, remove the retaining screw.

Disassemble RV Module Remove the bushing from the stem. Remove the stem o-ring.

RV Reassembly Notes Replace and lubricate o-rings. Reassemble in reverse order. Push module straight into body. Make sure diaphragm does not cover hole for sensing line.