3.2.3 Coping with the Effects of Disaster: The Bulaon Resettlement Project in Pampanga, Philippines 1 UPA Package 3, Module 2 COPING WITH THE EFFECTS OF.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Delta Confidential 1 5/29 – 6/6, 2001 SAP R/3 V4.6c PP Module Order Change Management(OCM)
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advanced Piloting Cruise Plot.
Terms. 1. Globalization 2. Financing 3. Inputs.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 The Academic Profession and the Managerial University: An International Comparative Study from Japan Akira Arimoto Research Institute for Higher Education.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
ZMQS ZMQS
3.2.7 Off-Site Housing and Tenure Improvement in the Philippines: The Case of Medium Rise Housing (MRH) Project in Muntinlupa City 1 UPA Package 3, Module.
Richmond House, Liverpool (1) 26 th January 2004.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Zions Bank Public Finance DRAFT COPY October 18, 2012 Business License Fee Study Business License Fee Study.
ABC Technology Project
SCATTER workshop, Milan, 24 October 2003 Testing selected solutions to control urban sprawl The Brussels case city.
3.2.4 Displacement due to Industrial Estate Development : The Case of Greenfield Automotive Park (GAP) Special Economic Zone (ECOZONE) in Santa Rosa, Laguna,
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
A. Ivanyi, Department of Information Technology, Pollack Mihály Faculty of Engineering, University of Pécs EUI-NET Kick off Meeting/1 Bravos, February.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
“Start-to-End” Simulations Imaging of Single Molecules at the European XFEL Igor Zagorodnov S2E Meeting DESY 10. February 2014.
Southeastern Association of Educational Opportunity Program Personnel 38 th Annual Conference January 30 – February 3, 2010 Upward Bound Internal & External.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Squares and Square Root WALK. Solve each problem REVIEW:
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
25 seconds left…...
Slippery Slope
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Januar MDMDFSSMDMDFSSS
REGISTRATION OF STUDENTS Master Settings STUDENT INFORMATION PRABANDHAK DEFINE FEE STRUCTURE FEE COLLECTION Attendance Management REPORTS Architecture.
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
UPA Package 3, Module 2 SQUATTER RESETTLEMENT IN THE METROPOLITAN FRINGE: A CASE STUDY OF THE SAPANG PALAY RESETTLEMENT PROJECT IN.
Intracellular Compartments and Transport
PSSA Preparation.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
CpSc 3220 Designing a Database
1 Vulnerability of People People  age  density  gender  ethnicity and language  socio-economic status.
Traktor- og motorlære Kapitel 1 1 Kopiering forbudt.
DISTRIBUSI PROBABILITAS KONTINYU Referensi : Walpole, RonaldWalpole. R.E., Myers, R.H., Myers, S.L., and Ye, K Probability & Statistics for Engineers.
3.2.5 On-Site Land Tenure Improvement in the Philippines: The Case of Slum Upgrading Program in Quezon City, Philippines 1 UPA Package 3, Module ON-SITE.
Presentation transcript:

3.2.3 Coping with the Effects of Disaster: The Bulaon Resettlement Project in Pampanga, Philippines 1 UPA Package 3, Module 2 COPING WITH THE EFFECTS OF DISASTER: THE BULAON RESETTLEMENT PROJECT IN PAMPANGA, PHILIPPINES

3.2.3 Coping with the Effects of Disaster: The Bulaon Resettlement Project in Pampanga, Philippines 2 Gain insight into extent of destruction of natural disasters Become familiar with the nature and extent of problems met Learn possible ways of coping with large-scale problems caused by disasters Objectives

3.2.3 Coping with the Effects of Disaster: The Bulaon Resettlement Project in Pampanga, Philippines 3 Eruption of Mt Pinatubo

3.2.3 Coping with the Effects of Disaster: The Bulaon Resettlement Project in Pampanga, Philippines 4 Damages: Church

3.2.3 Coping with the Effects of Disaster: The Bulaon Resettlement Project in Pampanga, Philippines 5 Damages: Public Market

3.2.3 Coping with the Effects of Disaster: The Bulaon Resettlement Project in Pampanga, Philippines Coping with the Effects of Disaster: The Bulaon Resettlement Project in Pampanga, Philippines Damages: Affected Population

3.2.3 Coping with the Effects of Disaster: The Bulaon Resettlement Project in Pampanga, Philippines 7 Policy Response: RA 7637 Set up funds Created Mt. Pinatubo Commission

3.2.3 Coping with the Effects of Disaster: The Bulaon Resettlement Project in Pampanga, Philippines 8 Vision: resettlement centers will become venues for development and provide the region a model for re- engineering. Resettlement Strategy

3.2.3 Coping with the Effects of Disaster: The Bulaon Resettlement Project in Pampanga, Philippines 9 Two Types of Settlements: Upland settlement for Aetas Lowland settlement for lowlanders

3.2.3 Coping with the Effects of Disaster: The Bulaon Resettlement Project in Pampanga, Philippines 10 Features: Upland Settlements Foot trails and bridges, springs and artesian wells, school buildings, public markets, staff house main livelihood: contract reforestation and agricultural production

3.2.3 Coping with the Effects of Disaster: The Bulaon Resettlement Project in Pampanga, Philippines 11 Concepts: Lowland Settlements novel approach to resettlement focused development - limit dependency on dole- outs concept of social regeneration - a holistic approach to socio-economic progress

3.2.3 Coping with the Effects of Disaster: The Bulaon Resettlement Project in Pampanga, Philippines 12 The Actors Department of Environment and Natural Resources Department of Agrarian Reform Philippine Institute of Volcanology Technology and Livelihood Center Social Services Administration Department of Public Works and Highways Philippine Institute of Civil Engineers Association of Structural Engineers Local Government Units Non-Governmental Organizations

3.2.3 Coping with the Effects of Disaster: The Bulaon Resettlement Project in Pampanga, Philippines 13 Resettlement Sites as of February 1999 The following were the resettlement sites of the Mt. Pinatubo victims: Resettlement Sites

3.2.3 Coping with the Effects of Disaster: The Bulaon Resettlement Project in Pampanga, Philippines 14 Resettlement Sites (continued)

3.2.3 Coping with the Effects of Disaster: The Bulaon Resettlement Project in Pampanga, Philippines 15 Resettlement Sites (continued)

3.2.3 Coping with the Effects of Disaster: The Bulaon Resettlement Project in Pampanga, Philippines 16 Bulaon Resettlement Sites

3.2.3 Coping with the Effects of Disaster: The Bulaon Resettlement Project in Pampanga, Philippines hectares of flat land Opened for occupancy in 1995 Capacity: 4,053 housing units As of June 30, ,033 families resettled 20,342 individuals Bulaon Resettlement Project

3.2.3 Coping with the Effects of Disaster: The Bulaon Resettlement Project in Pampanga, Philippines 18 The Bulaon Resettlement site followed the basic design of the lowland sites. The layout of the lowland settlements was visualized as a functional community environment with each site having the following features: A new townsite developed as a model community, not squatter ghettos Paved roads with sidewalks with street lighting Power system supplied by the local electric cooperative Project Features

3.2.3 Coping with the Effects of Disaster: The Bulaon Resettlement Project in Pampanga, Philippines 19 Drainage system Level 3 water system School buildings for elementary and high schools A government or administration building (similar to a town hall) Town plaza with open playground Public market and commercial stalls

3.2.3 Coping with the Effects of Disaster: The Bulaon Resettlement Project in Pampanga, Philippines 20 A hospital or clinic A livelihood training center A site assigned for religious worship Productivity center (a cluster of four to six factory buildings) Adequate greenery Housing of lot sizes ranging from 50 to 150 square meters

3.2.3 Coping with the Effects of Disaster: The Bulaon Resettlement Project in Pampanga, Philippines 21 Resettlement Social Services Infrastructure Livelihood Estate Management Resettlement Components

3.2.3 Coping with the Effects of Disaster: The Bulaon Resettlement Project in Pampanga, Philippines 22 Site Selection Consultations Site Planning Approval of Site Plan Site Development Transfer of Settlers Assistance and Loan Package The Resettlement Prosses

3.2.3 Coping with the Effects of Disaster: The Bulaon Resettlement Project in Pampanga, Philippines 23 Families who lost houses and livelihood Families who lost houses Shares/renters of houses lost Families living in high risk areas Families less severely affected Priority Beneficiaries

3.2.3 Coping with the Effects of Disaster: The Bulaon Resettlement Project in Pampanga, Philippines 24 90% of resettlers have remained Bulaon is a bustling community Internal revenue allotment increased Bulaon is now the biggest barangay; its officials receive higher salaries because of its size Accessibility - Bulaon used to be inaccessible Growth in commercial activities Benefits from Project

3.2.3 Coping with the Effects of Disaster: The Bulaon Resettlement Project in Pampanga, Philippines 25 Resettlement Public Market

3.2.3 Coping with the Effects of Disaster: The Bulaon Resettlement Project in Pampanga, Philippines 26 Grandiose House in Resettlement Area

3.2.3 Coping with the Effects of Disaster: The Bulaon Resettlement Project in Pampanga, Philippines 27 Mismatch between settlers felt needs and governments perception of their needs Floor area of house too small for some Inadequate livelihood opportunities Resettlement Issues

3.2.3 Coping with the Effects of Disaster: The Bulaon Resettlement Project in Pampanga, Philippines 28 Program of assistance must be holistic Gainful employment must be provided Individual and collective needs, including physical and non-physical needs must be considered Lessons Learned