KEK injector cryomodule

Slides:



Advertisements
Similar presentations
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Operational Results from STF-VTS and Cryomodule Tests at KEK Eiji Kako (KEK, Japan)
Advertisements

Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting.
E. Kako (KEK) Webex Meeting in May 24th, Status and Disassembly Plan of S1-G Cryomodule.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
E. KAKO (KEK) 2009' Sept. 30 Albuquerque Global Design Effort 1 Cavity Test Items in S1-G Cryomodule Eiji Kako (KEK, Japan)
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Lorentz Force Detuning Eiji Kako (KEK, Japan)
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Heat load study of cryomodule in STF
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
KEKB Crab Development K. Hosoyama (KEK) Crab Cavity for HER Crab Cavity for LER Crab Cavity for KEKB History of Crab Cavity R&D Characteristics of Crab.
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
FNAL Cavities for S1 Global Jim Kerby ALCPG 09. FNAL Deliverables Discussed in meetings 15/16 July and 10/11 Sept, and Webex and s 9/30/20092FNAL.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 1 Preparation Status at KEK for S1-Global Eiji Kako (KEK, Japan)
1 E. KAKO (KEK) 2012' May 28 Clermont 1 A_RD_03 R/D for the High Power Couplers for ILC Walid KAABI (LAL-Orsay, France) Eiji KAKO (KEK, Japan)
E. KAKO (KEK) 2010' April 20 meeting Global Design Effort 1 Eiji Kako (KEK, Japan) Cavity Test Plan in S1-Global Cryomodule.
LCWS13 at Tokyo, 2013 Nov. 121Eiji Kako (KEK, Japan) Status of STF2 Input Couplers Eiji KAKO (KEK, Japan)
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION KEKB Review Committee/ NAKAI Hirotaka KEK Crab Cavity - Cryogenics - KEKB Crab Cavity Group - presented.
5 K Shield Study of STF Cryomodule Norihito Ohuchi, Norio Higashi KEK Xu QingJin IHEP 2008/3/3-61Sendai-GDE-Meeting.
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
1 K.Jensch, D.Kostin, DESY - Cryomodule components List S1 – DESY parts DESY parts for the S1 Cavity-String.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
E. KAKO (KEK) 2010' Feb. 23 Webex meeting S1-G Global Design Effort 1 Status of Cryomodule-A for S1-Global at KEK Eiji Kako (KEK, Japan)
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Ralf Eichhorn CLASSE, Cornell University. I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see.
Gradient Degradation Experience at Fermilab (NML/CM-1) Elvin Harms TTC Meeting, Beijing 5-8 December 2011.
Integration and Cold Testing of the CW ERL Cryomodule at Daresbury Shrikant Pattalwar ASTeC, STFC, Daresbury Laboratory (UK) On behalf of ERL Cryomodule.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
5K shield removal experiment in STF cryomodule Norihito Ohuchi 2008/11/181ILC08-GDE-Meeting (CHICAGO)
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
DESY 2011 CMTB Experiment Summary PXFEL2-1 cryomodule used to investigate LP and CW operation in the summer of 2011: CW operation up to 7.5 MV/m.
Eiji Kako (KEK, Japan)TTC at Cornell, 2013 June 13 1 HOM absorbers; KEK HOM couplers in injector Eiji Kako (KEK, Japan)
Recent Result for the STF-2 Cryomodule Operation
CERN – Zanon discussions
CW couplers; KEK injector couplers Eiji Kako (KEK, Japan)
WP5 Elliptical cavities
Degradation and Recovery of Cavity Performance
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
S1-G for TTC meeting Global Design Effort
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
Measurement results of cavity gradient degradiation of cERL Main Linac cryomodule under beam operation Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji.
S1-G cryomodule assembly status
S1-G Webex meeting Global Design Effort
Magnetic shields inside and outside LHe tank in S1-Global cryomodule assembly at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
BriXS – MariX WG 8,9 LASA December 13, 2017.
High Q Cavity Operation in the Cornell Horizontal Test Cryomodule
V. Veshcherevich Cornell University
CW Operation of XFEL Modules
5K Shield Study & HL Measurements
Performance Degradation cERL Injector Cryomodule
IHEP Cryomodule Status
Construction and First Coo-down Test of cERL Injector Cryomodule
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
FRIB summary of performance degradation - VTA to cryomodule
Cryomodule Assembly Plan
Cryomodules Challenges for PERLE
CEPC-650MHz Cavity Cryomodule
TTC meeting, Milano Global Design Effort
Cavity Degradation Experience at S1-Global
V. Veshcherevich Cornell University
Tom Peterson, Fermilab 6 December 2011
CRYOMODULE FINAL ASSEMBLY
Presentation transcript:

KEK injector cryomodule CW Cryomodules; KEK injector cryomodule Eiji Kako (KEK, Japan) Eiji Kako (KEK, Japan) TTC at Cornell, 2013 June 14

OUTLINE cERL injector cryomodule Cryomodule assembly in clean room Cryomodule assembly in clean booth Installation in beam line Low power RF tests High power RF tests Static and dynamic heat loads Beam operation Summary Eiji Kako (KEK, Japan) TTC at Cornell, 2013 June 14

cERL Injector Cryomdule e- beam 0.5  5.5 MeV 10 mA Eiji Kako (KEK, Japan) TTC at Cornell, 2013 June 14

cERL Injector Cryomdule Vacuum Vessel 5K Duct 5K Panel 5K Panel 80K Shield 2K He Jacket 2K Gas Return Pipe 5K Support Input Coupler e- Magnetic shield 80K Base-plate 2-cell Cavity 10 mA 0.5 → 5.5 MeV HOM Coupler & RF Feedthrough 4 Eiji Kako (KEK, Japan) TTC at Cornell, 2013 June 14

Cryomdule Assembly in Clean Room April 25th, 2012 Exchange of RF feedthroughs Cavity string assembly in clean room Attachment of input couplers Eiji Kako (KEK, Japan) TTC at Cornell, 2013 June 14

Alignment of three cavities Cryomdule Assembly in Clean Booth Assembly of slide-jack tuner system Alignment of three cavities Assembly of 2K-He line Installation of 5K-He panels Eiji Kako (KEK, Japan) TTC at Cornell, 2013 June 14

Cold-mass Assembly 2K-He, 5K-He, 80K-N2 Cooling Line May 23rd, 2012 2K-He Gas Return Line Liq. 2K-He Supply Line Liq. 80K-N2 Liq. 5K-He Supply Line 5K-He Gas Return Line Eiji Kako (KEK, Japan) TTC at Cornell, 2013 June 14

Assembly of Injector Cryomodule Insertion into vacuum vessel Installation in the beam line Eiji Kako (KEK, Japan) TTC at Cornell, 2013 June 14

Cool-down Tests Eiji Kako (KEK, Japan) TTC at Cornell, 2013 June 14

Static Heat Loads Static heat load ; 2K Static heat load ; 4.2K ave. 2K heat load = 12 W (including 2K cold-box = 1 W) Cryomodule = 11 W at 2K Estimation = 14 W, including 1 W/coupler (x6), 0.2 W/HOM-cable (x15) and others. ave. 4.2K heat load = 48 W (including 2K heat load = 12 W) Cryomodule = 36 W at 4.2K Estimation = 33 W, including 3 W/coupler (x6), 1 W/HOM-cable (x15). Eiji Kako (KEK, Japan) TTC at Cornell, 2013 June 14

Low Power RF Tests Eiji Kako (KEK, Japan) TTC at Cornell, 2013 June 14

High Power RF Tests Cavity-2 Cavity-3 Eiji Kako (KEK, Japan) TTC at Cornell, 2013 June 14

Dynamic Heat Loads Cavity dynamic heat load at 2K Qo vs. Eacc at 2K Po = 8 W (at 7.5 MV/m) Qo = 2 x 109 (at 7.5 MV/m) Eiji Kako (KEK, Japan) TTC at Cornell, 2013 June 14

Observation of x-ray radiation level down-stream mSv/h 50ms, 2Hz (10% duty) No.3 Cavity up-stream mSv/h No.2 Cavity no x-ray < 10 MV/m No.1 Cavity 50ms, 2Hz (10% duty) 50ms, 2Hz (10% duty) Eiji Kako (KEK, Japan) TTC at Cornell, 2013 June 14

Beam Operation of Injector Section Vc = 5 MeV operation (3 cavities) Eiji Kako (KEK, Japan) TTC at Cornell, 2013 June 14

SUMMARY Cryomodule assembly (April-June, 2012) First cool-down tests (Sept., 2012) Low and high power RF tests (Jan.-Feb., 2013) Beam operation (April, 2013) Heat loads at 2K of three 2-cell cavities were ten times larger than the expectation due to heating-up at the antenna tip of HOM feedthroughs. Stable beam operation at 5 MeV was successfully demonstrated in the cERL injector cryomodule. Eiji Kako (KEK, Japan) TTC at Cornell, 2013 June 14

END Thank you for your attentions. Eiji Kako (KEK, Japan) TTC at Cornell, 2013 June 14