ICAO 2012 Network Operations Update

Slides:



Advertisements
Similar presentations
ICAO FPL 2012 Implementation Workshop Lisbon 16 th February 2012 Kim Breivik Chairman EUR 2012 Task Force Operational Requirements, Network Management.
Advertisements

ICAO FPL 2012 Implementation Workshop Lisbon 16 th February 2012 Kim Breivik Chairman EUR 2012 Task Force Operational Requirements, Network Management.
ICAO FPL 2012 Implementation Workshop Lisbon 16 th February 2012 Transition & Roll-Over Period Kim Breivik Chairman EUR 2012 Task Force Operational Requirements,
Auto Quick-Buy. Overview: Based upon the use of system flags, a complete ordering process will be automated as follows: sales order lines automatically.
PC Encryption installation progress/password screen Includes comments from: Encryption team Sarah Deane Tony Stieber Selected people who took part in the.
PBN ICAO HQ Activities Overview
European Organisation for the Safety of Air Navigation Presentation to ICAO Workshop Kiev 28 July – 1 July 2010 EUR Regional Implementation of Flight Plan.
European Organisation for the Safety of Air Navigation 2012 FPL Task Force Revised Specifications for 2012 FPL in EUR Region Andrew Hill, Eurocontrol.
European Organisation for the Safety of Air Navigation Presentation to ICAO Workshop Kiev 28 July – 1 July 2010 EUR Regional Implementation of Flight Plan.
European Organisation for the Safety of Air Navigation Presentation to ICAO Workshop Kiev 28 July – 1 July 2010 EUR Regional Implementation of Flight Plan.
TCP - Part I Relates to Lab 5. First module on TCP which covers packet format, data transfer, and connection management.
1 TCP - Part I Relates to Lab 5. First module on TCP which covers packet format, data transfer, and connection management.
1 CS 4396 Computer Networks Lab Transmission Control Protocol (TCP) Part I.
International Civil Aviation Organization European and North Atlantic Office Outcome of the ICAO EUR FPL2012 Workshop Kiev, Ukraine 29 June – 1 July 2010.
How to Get The Most Out of Outlook 2003 Michele Schwartzman Division of Customer Support Summer 2006.
Objective FCM03 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
International Civil Aviation Organization European and North Atlantic Office CLARIFICATIONS FROM ICAO - ICAO EUR FPL2012 Workshop Kiev, Ukraine 29 June.
FPL2012 TF#7Brussels 10 October 2012 Kim Breivik Operational Requirements Network Management EUROCONTROL Testing Report.
© FREQUENTIS 2010 Datum: Rev.1 Autor: ODOSeite: 1 FPL 2012 Kym Shenton Senior Technical Engineer/Safety Engineer Frequentis California, Inc.
Navy Supply Information Systems Activity 1 Ready. Resourceful. Responsive! Navy Supply Information Systems Activity 29 April 2010 NAVSISA WAWF/STARS_FL.
Module 7: Data Entry (REDCap)
© 2004 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice SISP Training Documentation Template.
ICAO Flight Plan 2012 Workshop ARE YOU READY? Durban 24 August 2012.
Department of Electronic Engineering City University of Hong Kong EE3900 Computer Networks Introduction Slide 1 A Communications Model Source: generates.
ITEC 370 Lecture 16 Implementation. Review Questions? Design document on F, feedback tomorrow Midterm on F Implementation –Management (MMM) –Team roles.
ICAO Changes to the Present Flight Plan Form Amendment 1 to the PANS-ATM Fifteenth Edition (PANS-ATM, Doc 4444) Tom Brady ICAO HQ.
Simplified Subs Update A&D Meeting April 18, 2001 Rick Oiesen, Volpe Center.
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
FPL2012 TF#7Brussels 10 October 2012 Kim Breivik Operational Requirements Network Management EUROCONTROL Deployment.
Voting with SOSA/OVRD SOSA/OVRD. Login and Information Screens After login, the SOSA Voting Information screen displays The Database drop-down allows.
Vendors Conference Prestwick 2011 Customer Picture Implementation of Changes to ICAO FPL 2012 Christoph Kunze Lufthansa Systems 7th December 2011.
Data Link and Flow Control Networks and Protocols Prepared by: TGK First Prepared on: Last Modified on: Quality checked by: Copyright 2009 Asia Pacific.
Remote Data Entry Updates Lori Wangsness Kim Gallimore Lori Wangsness Kim Gallimore.
NIMAC for Publishers & Vendors: Using the Excel to OPF Feature & Manually Uploading Files December 2015.
EUR Flight Planning Guidance
1 eCoRepair New Release Slide Expanded view of Circuit Details Change to Circuit Looping text4 View of closed faults up to 30 days old5 - 7 Minor.
20 Copyright © 2008, Oracle. All rights reserved. Cache Management.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: AOC WG From: Data Comm Production Sub-Team Date: 08/22/12.
1 Work Orders. 2 Generating a Work Order There are two methods to generating a Work Order in the WYNNE STSTEM. First method: Option 11 – 12 – 13 * Open.
KY Employee Benefits Module
Presentation to ICAO Workshop Kiev 28 July – 1 July 2010 EUR Regional Implementation of Flight Plan Amendment 1 for 2012 Issues with Certain Fields.
CLARIFICATIONS FROM ICAO - ICAO EUR FPL2012 Workshop
FILING OF VFR FLIGHT PLANS
FAA Implementation of Amendment 1
5. End-to-end protocols (part 1)
Texas Assessment Management System Student Directory and Send Files
TCP.
GOLD GOLD Amendment Program Presented to: SOCM/2 Seminar
Data Communications Program
FPL 2012 FPL Vendor Conference Mona Annaddaf Scotland, 7-8/12/2011
Switching Techniques In large networks there might be multiple paths linking sender and receiver. Information may be switched as it travels through various.
Air Carrier Continuing Analysis and Surveillance System (CASS)
TCP - Part I Karim El Defrawy
Chapter 10 Data Link Control
IFPS Error Messages in Flight Plan Rejections
ERO/Transmitter Training
NEPSI Online Reporting System
Training & Documentation
Switching Techniques.
ICAO 2012 FPL Anthony Coult 8 Dec 2011.
Nov Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Implementation Approaches for LPWAN Extension]
Pertemuan 24 Frame Relay Concepts
Welcome to HOUSING CONNECTIONS TRAINING 04 Tenancy and Transfer
TCP - Part I Relates to Lab 5. First module on TCP which covers packet format, data transfer, and connection management.
Module 7: Data Entry (REDCap)
Agricultural Data Collection System
Navy Supply Information Systems Activity
Recommendations - where we are
Presentation to ICAO Workshop Kiev 28 July – 1 July 2010 EUR Regional Implementation of Flight Plan Amendment 1 for 2012 OLDI Issues
PBN ICAO HQ Activities Overview
Presentation transcript:

ICAO 2012 Network Operations Update Presented by Andy Woollin 10th October 2012

In April this year we entered transition mode, allowing either NEW or PRESENT flight plans.  We receive a small number of NEW flight plans, and are experiencing no operational problems.  3.3% (1000 out of 30,000) of the flight plans that we receive are flagged as “BOTH“, which are valid under NEW or PRESENT (OLD) rules. There are very few problems in IFPS with conflicting ‘OLD’ and ‘NEW’ fields in flight plan messages.

CHG message with partial Field 18 information IFPS replaces the complete stored Field 18 information with the Field 18 information contained in CHG messages. There are still some airlines that are sending partial Field 18 information in CHG messages and are potentially removing important information from the stored/distributed FPL. (FPL-ROT302-IS -A318/M-SDGHIPRWY/S -EDDF0950 -N0440F390 SULUS6S SULUS UZ650 BERVA UM748 TEGRI/N0440F330 UL605 LAMIT UL5 TUSET TUSET6E -LROP0225 -OPR/ROT DOF/120910 RVR/200 ORGN/RPL) (CHG-ROT302-EDDF0950-LROP-18/REG/YRASA) (CHG-ROT302-EDDF0950-LROP-18/REG/YRASA DOF/120910 ORGN/OTPFWRO)

AFP Messages in OLD format When an ANSP is receiving a translation service from IFPS after the 15th November, it is possible that their systems will automatically create ATC Flight Plan (AFP) messages in OLD format. If the ANSP system copies the field 10 information from the FPL and transmits that to IFPS, the AFP may raise an error in the IFPS system. Where possible, ANSPs need to provide basic field 10 (in AFTN format messages) to IFPS.

Switch Contingency/Mitigation To reduce the number of ‘OLD’ format flight plans with a DOF after the switch date, the acceptable DOF for filing to IFPS will decrease from 120 hours to 24 hours, and then back to 120 hours after the switch. 96h 15 Nov 120h 14 Nov 13 Nov 72h 48h 24h 11 Nov 12 Nov 10 Nov New Only During the period around the date of the switch, IFPS Staffing will be increased. On the night of the default ready date switch, there will be cover provided for urgent environment data updates.

Switch Contingency/Mitigation The IFPS has a systematic rejection feature that will be used if certain types of repetitive error risk overloading the IFPS manual processing function. Examples: Reject all FPLs received from address XXXXXXX when EFPM166 error raised. Reject all FPLs received when SYN94 error raised. This option needs to be used with caution as it may result in an increase of telephone queries.

Switch Contingency/Mitigation Standard management of IFPS invalid message queue. Maximise the number of active positions Establish working positions dedicated to detect urgent messages Establish working positions dedicated to take incoming telephone calls Remote log-in from other IFPS Unit. Load Shedding

Switch Contingency/Mitigation As a last resort… A modification of the invalid FPLs to include only the basic equipment necessary in Field 10 (SRGWY/C) and PBN (B2) to comply with EUR 833, RVSM and RNAV requirements. This may result in other data being removed, if it is the source of the error. If this procedure is to be implemented a priority order of FPLs to be targeted should be established e.g. starting with internal European FPLs before long haul FPLs. An AIM would be issued if this measure was needed.

Warning in IFPS ACKnowledgment Message -TITLE ACK -MSGTYP IFPL -FILTIM 091021 -ORIGINDT 1210091021 -BEGIN ADDR -FAC LHRWUBA -FAC EGLLBAWH -END ADDR -COMMENT MESSAGE IS IN OLD ICAO FORMAT AND WILL NOT BE ACCEPTED BY IFPS AFTER 2012/11/15 0000 UTC -EXTADDR -NUM 006 -IFPLID AA90020230 -MSGTXT (FPL-BAW297-IS -B744/H-SGIPRWXYZ/SD -EGLL1435 -N0488F320 CPT UL9 KENET U

AIM and NOP Headline News During November, AIMs and the Network Operations Portal (NOP) Headline News will be heavily utilised to get the FPL 2012 message out.

QUESTIONS