SunZia Project Description

Slides:



Advertisements
Similar presentations
Regulatory Process and Other Models Arizona Corporation Commission Fifth Biennial Transmission Assessment Commission Decision Workshop on Transmission.
Advertisements

Reliability in British Columbia
2007 Goals. Introduction Western Electricity Coordinating Council (WECC) will be primarily defined throughout the 2007 year by Electric Reliability.
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
New England’s Regional Renewable Resource Development Efforts New England States Committee on Electricity November 3, 2011.
Public Service Company of New Mexico
 Jeremy Turner, Executive Director Phoenix, Arizona May 21, 2010.
Arizona Transmission System Overview November 18, 2014 Tribal Solar Working Group 1.
An Overview of Arizona’s Renewable Transmission Planning Process Southwest Renewable Energy Transmission Conference Amanda Ormond – Ormond Group LLC Brian.
Federal Energy Regulatory Commission Proposed Rule on Small Generator Interconnection RM July 23, 2003.
Arizona Corporation Commission 2010 Biennial Transmission Assessment Workshop June 3 & 4, 2010 Brian K. Keel Manager, Transmission System Planning Salt.
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
Clean, Reliable, and Low Cost Energy for the for theCaribbean December, 2006 Confidential.
TIM CHARTERS STAFF DIRECTOR U.S. HOUSE COMMITTEE ON NATURAL RESOURCES SUBCOMMITTEE ON ENERGY AND MINERAL RESOURCES “ WHY BUILDING A SOLAR PROJECT ON FEDERAL.
North American Strategic Infrastructure Leadership Forum October 12, 2011.
Small Farm Profitability: Is Wind Energy the Answer? 1
May 22-23, 2008 ACC BTA Workshop May 22-23, 2008 Regional Renewable Energy Transmission Initiatives Laurie Woodall K.R. Saline and Associates, PLC Arizona.
Etowah County Alabama. Etowah County has been selected to be the first site in Alabama for a wind energy farm. Pioneer Green Energy is the developer The.
1 Western Wind and Solar Integration Study Site Selection Analysis 5/14/2008.
. Juan de Fuca Cable. Safe Harbor Statement Included in this document is certain information which is “forward looking information” as defined by the.
Despite Order No Planning Gaps for (Certain) Merchants OPSI Annual Meeting 2013.
Montana Ambassadors Helena, Montana February 25, 2011.
ISO New England Regional Update Wholesale Electricity Markets & State Energy Policy Seminar Connecticut Business & Industry Association December 14, 2010.
Charles Hosken, General Manager Imperial Irrigation District
Western Wind Integration Study Kevin Porter – Exeter Associates, Inc. Brian Parsons, Michael Milligan, Debbie Lew – NREL DOE Wind Program Peer Review July.
Challenges in Transmission. 2 Environmental and Public Affairs Consulting for the Energy Industry Energy Sectors  Oil & Gas  Pipeline  Storage  LNG.
PJM© PJM Confidential PJM Generation Interconnection Overview Virginia Offshore Wind Conference Virginia Beach June 22, 2011 Paul McGlynn General.
Northern California to Pacific Northwest/Canada Transmission Line Steve Metague, PG&E February 29, 2008.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
1 Arizona Corporation Commission BTA Workshop Presenter: Steven Cobb May 23, 2008.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
Successful Transmission Planning & Development in the West Kelly Barr Manager, Regulatory Affairs & Contracts Salt River Project Phoenix, Arizona June.
Arizona ACC Biennial Transmission Assessment Navajo Transmission Project Update May 22, 2008 Presentation by Ben Hoisington Project Administrator, DPA.
2009 SOUTHEAST ARIZONA TRANSMISSION SYSTEM STUDY REPORT 6 th BTA Workshop Carnegie Library, Phoenix, AZ By TEP on behalf of SATS Participants June 3-4,
WestConnect Activities Charles Reinhold WestConnect Project Manager 2008 ACC BTA Workshop Phoenix, AZ May 22, 2008.
Energy Gateway Update for Wyoming Infrastructure Authority January 27, 2009 Darrell Gerrard Vice President Transmission System Planning.
High Plains Express Initiative Jerry Vaninetti, Vice President Trans-Elect Development Company, LLC Arizona Corporation Commission Fifth Biennial Transmission.
Overview of WECC and Regulatory Structure
WECC Response to DOE Funding Opportunity on Regional Planning Northwest Wind Integration Forum Steering Committee January 6, 2010 Tom Schneider Managing.
APS Overview Richard Nicosia. APS Snapshot Largest and longest serving electric utility Operations dating back to th largest employer headquartered.
Entrega Project Update Wyoming Natural Gas Pipeline Authority – August 30, 2005 Entrega Gas Pipeline Inc.
Riga 4th December 2008 Renewable energy: is there a Latvian masterplan? Ieva Indriksone Riga Graduate School of Law.
Western Renewable Energy Zone Project October 29, 2009 John Savage Oregon Public Utility Commission.
Updated 1/28/2011.
March 30, 2012 Wholesale Generation Interconnection Process Photovoltaic Program Power Purchase Agreements Request for Offers.
Western Renewable Energy Zone (WREZ) Concept (as of 11/27/07)
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
1 Sunrise Powerlink Project Update Orange County Business Council March 10, 2009.
Reliable Power Reliable Markets Reliable People Hanna Region Transmission Development Ramaiah Divi, P.Eng Manager, Central System Planning.
Bob Cupit Manager, Energy Facility Permitting Minnesota Public Utilities Commission.
Overview of the Grid Randy Manion, Western Area Power Admin. EPA Clean Power Plan Workshops Farmington, NM, December 7 and 8, 2015 Tuba City, AZ, December.
1.
Craig Williams Market Interface Manager August 21, 2014 ISAS, Portland, OR.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
APS Top Renewable Transmission Projects Arizona Public Service Company November 23, 2009 Brian Cole John Lucas.
Lessons Learned from Existing RTOs John Moore January WCEA Meeting January 7 th, 2016.
Arizona Corporation Commission Biennial Transmission Assessment Workshop May 22 & 23, 2008 Phoenix, AZ.
Renewable & Alternative Power Implementation of the California Renewables Portfolio Standard February 6, 2007 Senate Energy, Utilities, and Communications.
Flynn & Associates1 SF LAFCO Energy Consultant(s) RFQ Overview of Critical Issues and Flynn & Associates’ Expertise April 19, 2002.
Nebraska Wind Conference Wednesday, November 16, 2011
Akuo Energy USA NM EnergyPlex Conference
Four Corners Wind Resource Center Webinar
Natural Gas Infrastructure Assessment
Presentation to the Enron Corp. Finance Committee
Phase 3 Solar Renewable Energy Initiative - Site Improvements
Transmission Planning at PJM Interconnection LLC
Dominion Investments in Virginia
Renewable Energy Project Investments
The GridSolar Project Presentation – NRCM January 21, 2010
SWAC – Agenda 10/23/18 Chapter 6 – Alternative Technology – Draft Findings 2. Chapter 7 – Draft Landfill Disposal Existing Disposal System Disposal Options.
Presentation transcript:

SunZia Project Description Proposed 500kV transmission line with strategic interconnections for export to Western markets The SunZia transmission route will connect New Mexico with Arizona: ~ 350 miles Right-of-way applied for will permit up to two, 500kV (AC) lines Ultimate transfer capacity: 3,000 megawatts (MW)

Project Overview

SunZia Participants Project owner is SunZia Southwest, LLC (a Delaware LLC) Entities negotiating the SunZia Memorandum of Agreement (MOA) include: Utility companies Private development companies (like SWPG) Financial investors Target date to execute MOA: January 1, 2008

SWPG and MMR SWPG is… SWPG’s owner, MMR, is… a privately owned project development firm, based in Phoenix, active in the Southwest since 1999 a developer of generation facilities, including 2,360 MW Panda Gila River Project; 1,000 MW Bowie Power Station a WECC member SWPG’s owner, MMR, is… a privately owned construction services firm, based in Baton Rouge, LA, with annual sales of $300 million experienced in the development and construction of power generation facilities of over 20,000 MW in 31 states and 4 continents

Interstate Transmission RETA coordinates with Regional Transmission Initiatives to “…plan…and negotiate with entities within and outside the state for the establishment of interstate transmission corridors.” Arizona Renewable Energy Standard of 2006: Regulated electric utilities must provide 15% of total megawatts sold from renewable resources by 2025 (RES Rules: A.A.C. R14-2-1801) SunZia will deliver power generated by renewable resources to Western markets

Project Activities Conducted feasibility studies Studied power-flow interconnections/potential impacts Product of past Southwest Area Transmission (SWAT) planning Performed preliminary route screening Developed regulatory support Conducted Open Season for participation Initiated WECC project rating process

Project Activities Continued meetings with… Governor Richardson’s staff, Public Regulation Commission, EMNRD, and NM Congressional delegation Governor Napolitano’s staff, Corporation Commission, Chair of Transmission Line Siting Committee, and AZ Congressional delegation SWAT and Federal Energy Regulatory Commission Bureau of Land Management – NM and AZ

Preliminary Route Screening Identified potential collector points for wind and solar energy resources Identified study area/corridor primarily in southwestern NM and southeastern AZ Inventoried regional environmental resources Identified potential transmission line routes

Access to Renewables

Project Schedule Estimated Project Completion Dates: Phase 0 – Development Agreement Initiate 06/2006 Complete 12/2007 Phase 1 – Siting and Permitting Initiate 01/2008 Complete 12/2011 Phase 2 – Design and Construction Initiate 07/2009 Complete 12/2012

Milestones Initiated Development Agreement – March 2007 Established project company: SunZia Southwest, LLC and project management roles Developed budget and schedule Drafted Memorandum of Agreement (MOA) Execute Development Agreement – January 2008 Initiate NEPA/Scoping Process – January 2008 Obtain Record of Decision, Right-of-Way Permits, and other permits – December 2011 In-service – December 2012

Opportunities for New Mexico Provides access to Western markets for renewables Provides points of connection for future RETA-supported collector transmission systems Improves reliability and power transfer throughout the Western Interconnect

Website www.SunZia.net

5

Potential SunZia Corridors

Electric Load Areas in Arizona 8