Operations Management

Slides:



Advertisements
Similar presentations
EMBA-2, BUP Major Asad EO Chapter 5: Process Analysis.
Advertisements

Managing Processes and Capabilities CHAPTER THREE McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Process Analysis Operations.
Process Flow Thinking 1. Overview Process flow is about how the product or service is made. Some measures we will want to study include: Throughput time,
Process Analysis If you cannot describe what you are doing as a process, you do not know what you are doing. W.E. Deming.
Process Capacity.
Flow Rate and Capacity Analysis
1 Alain Prioul Flexibility / Adaptability. 2 Definitions Flexibility Ability to follow customer demand at different Takt Time Ability to quickly change.
1 Slide Process Analysis Fundamentals MGT Slide Process Definition  A process is a collection of operations connected by a flow of transactions.
Slide 1 Matching Supply with Demand: An Introduction to Operations Management Gérard Cachon ChristianTerwiesch All slides in this file are copyrighted.
Process Design and Analysis
PROCESS DESIGN AND ANALYSIS Chapter Eleven Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
11–1. 11–2 Chapter Eleven Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
7 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Constraint Management (Short-term Capacity Planning) 7.
Wash, mix, spoon BakeCoolPackAccept Payment min per dozen. 7.5 dozen per hour 10 min per dozen 6 dozen per hour 5 min per dozen 12 dozen per hour.
MBA 8452 Systems and Operations Management
OMG Operations Management Spring 1997
CONWIP Systems CONWIP – Constant work-in-process
Operations Management
III. Operational Measures
OM&PM/Class 2b1 1Operations Strategy –Class 1a: Introduction to OM –Class 1b: Strategic Operational Audits 2 Process Analysis –Class 2a + 2b: Process Flow.
IV. Little’s Law and Labor Costs
Process Analysis and Applications Module
Kristen’s Cookies.
Ch 3 Manufacturing Models and Metrics
Little´s law Skorkovský ,KPH,ESF.MU
Irwin/McGraw-Hill 1 Process Analysis Terms Process: Is any part of an organization that takes inputs and transforms them into outputs. Cycle Time: Is the.
OPSM 301: Operations Management Session 7: Process analysis Koç University Zeynep Aksin
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Chapter 6 Process Analysis.
1 © The McGraw-Hill Companies, Inc., 2004 Introduction (from Chase) Process Analysis.
1-1 1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved.
OPSM 301: Operations Management
Managerial Accounting: Overview Chapter One  FINANCIALMANAGERIAL  OutsideInside  Follow GAAP/IFRSTimely and Relevant  Standard Report FormatReports.
Managing Processes and Capabilities CHAPTER THREE.
A case on Flowtime, Batching and Costs
1 Slides used in class may be different from slides in student pack Chapter 5 Process Analysis  Process Analysis  Process Flowcharting  Categories of.
OPSM 405 Service Operations Management
Process Analysis CHAPTER 5. Learning Objectives 1. Recognize three basic types of processes: a serial flow process, parallel processes (such as what happens.
Operations Management For Competitive Advantage 1 Process Analysis Operations Management For Competitive Advantage Chapter 4.
Flow Rate and Capacity Analysis
IE450 Models Relating Cycle-time, Throughput, WIP and Batch Sizes
MINGZHE HAN (CMP TUTOR) COMM 204 Review Session. Outline T ABLE OF C ONTENT (Basic Information) (Process Analysis) (Multiple Types and the Product Process.
Take order wash mix spoonload & set coolbake 6/1-2 doz219 unlo- ad pack 25 get pay 1/order TFT = = 26 Problem 4.2: Part (a)
Penny Fab WIP=1.
1 Basic Factory Dynamics 2 HAL Case Large Panel Line: produces unpopulated printed circuit boards Line runs 24 hr/day (but 19.5 hrs of productive time)
Performance Measurement Financial
Solved Problem An inspection station for assembling printers receives 40 printers/hour and has two inspectors, each of whom can inspect 30 printers per.
Operations Fall 2015 Bruce Duggan Providence University College.
Assignment Capacity. 2 Ardavan Asef-Vaziri March, 2015Capacity- Basics MamossaAssaf Inc. fabricates garage doors. Roofs are punched in a roof punching.
Take order wash mix spoonload & set coolbake 6/1-2 doz219 unlo- ad pack 25 get pay 1/order Problem 5.2: Flow unit = 1 order of 1 dozen. The unit loads.
Supply Chain Customer Order Decoupling Point
Key Learnings: Little’s Law
Theoretical Capacity Theoretical capacity: The capacity (throughput rate) of a process under ideal conditions (units / time) Effective capacity: The capacity.
Chapter 5 Process Analysis. Chapter 5 Process Analysis.
Analytical Tools for Process Analysis and Improvement
Process Design and Analysis
Process Analysis.
Process Analysis Guanyi Lu September 18, 2018.
Chapter 5 Process Analysis.
IV-2 Manufacturing Systems modeling
Machine Requirements 8/24/04 Paul A. Jensen
Variability 8/24/04 Paul A. Jensen
Process Analysis “If you cannot describe what you are doing as a process, you do not know what you are doing.” W.E. Deming.
Assignment Capacity The recorded solution to the first problem is available at
Basic Factory Dynamics
Problem 4.2: Part (a) TFT = = 26 Take order wash mix
Chapter 5 Process Analysis.
Presentation transcript:

Operations Management Feedback for control Transformation Network of activities Inputs Outputs Raw Materials Requests for Service Goods Services Flow Units Resources Labor & Capital

Process Flow Diagrams Activities: Material flows: Inventory / buffers: Mix Activities: Material flows: Inventory / buffers: Information: Work in Process Term 2, 2015 Joseph Milner, RSM 1340

Cook Custard Cool Freeze Work in Process Finished Goods Raw Material Pack Freeze Cool Cook Custard

Raw Material Cook Custard Pack Cool Freeze Work in Process Finished Goods

BREAK

Flow Unit: Batches are 100 liters ice cream packed 3/4 hr/b 1 hr/b Raw Material Cook Custard Pack Cool Freeze Work in Process Finished Goods 24 sec./l 2/3 hr/b 24 s l × 100 l batch × 1min 60s × 1hr 60min. = 2 3 hr/batch

Capacity of a single resource: Cook Custard Process Time: 3/4 hour per batch of 100 l-ice cream Capacity = 4/3 batch/hr

Process Time (for each freezer): Capacity of resources in parallel: 1 b/hr Freeze (Machine 1) Freeze (Machine 2) Process Time (for each freezer): 1 hour/ batch 1 b/hr Capacity = 1 b/hr + 1b/hr = 2 batches/hr

Capacity of resources in series: Cook Custard Cool Freeze Process Time: 3/4 hour/ 100 l Process Time: 3/4 hour/ 100 l Process Time: 1 hour/ 100 l 4/3 b/hr 4/3 b/hr 1 b/hr Capacity = Minimum(4/3, 4/3, 1) = 1 batch/hr

p = average service or process time per flow unit m = average service or process rate (flow units per hour) Observe p = 1/m

If service takes 15 minutes or p=1/4 hour, then you can serve m =4 customers per hour.

Flow Unit: Batches are 100 liters ice cream packed 3/4 hr/b 1 hr/b 4/3 b/hr 4/3 b/hr 1 b/hr Raw Material Cook Custard Pack Cool Freeze Work in Process Finished Goods 2/3 hr/b 3/2 b/hr 4/3 b/hr 4/3 b/hr 1 b/hr

2 b/hr 1 b/hr 4/3 b/h 4/3 b/hr 1 b/hr 3/2 b/hr 4/3 b/hr 4/3 b/hr Raw Material Cook Custard Pack Cool Freeze Work in Process Finished Goods 3/2 b/hr 4/3 b/hr 4/3 b/hr 1 b/hr 1 b/hr Minimum(2 b/hr, 3/2 b/hr) 3/2 b/hr

BREAK

3/4 liter-cream 1 liter ice cream 4/3 b/hr 150 l−cream hr 2 b/hr Cook Custard 4/3 b/hr 150 l−cream hr 2 b/hr Raw Material Prepare Cream 3/4 liter-cream 1 liter ice cream 150 l−cream hr × 1 l−ice cream 3 4 l−cream = 200 l−ice cream hr × 1 batch 100 l−ice cream = 2 batches hr

100 l- 95 l-packed ice cream × 100 l−ice cream batch = 150 l−ice cream hr 3/2 b/hr 100 l-ice cream /hr 95 l-packed/hr 1 b/hr Pack Freeze Work in Process Finished Goods 142.5 l-packed /hr 150 l-ice cream /hr 3/2 b/hr 100 l- ice cream 95 l-packed 100 l-ice cream /hr 95 l-packed/hr 1 b/hr 100 l−ice cream hr 150 l−ice cream hr × 95 l−packed 100 l−ice cream × 95 l−packed 100 l−ice cream = 142.5 l−packed hr = 95 l−packed hr

BREAK

m = number of resources available at a workstation Cook Custard Cool Freeze 2/3 hr/b 3/4 hr/b 1 hr/b 4/3 b/hr 1 b/hr 3/2 b/hr Work in Process Finished Goods Raw Material Pack Cook Custard Cool Freeze Freeze Cool Cook Custard x 2 cookers 2 coolers 2 freezers 1 packer 8/3 b/hr 2 b/hr 3/2 b/hr m = number of resources available at a workstation Capacity of a workstation = # of resources x service rate = m m

Fundamental Parameters of a System rB = Bottleneck and Process Capacity Tmin = Minimum Flow or System Process Time

What is the bottleneck rate? (batches per hour) Bottleneck = Packing rB = 3/2 batch per hour

What is the system process time? (hours)

3/4 hr/b 1 hr/b 2/3 hr/b Raw Material Cook Custard Pack Cool Freeze Work in Process Finished Goods 2/3 hr/b

What is the system process time? (hours) TMin = 3/4 + 3/4 + 1 + 2/3 = 3.167 hrs = 3:10 hrs

Process Utilization and Capacity Utilization Throughput Rate Process Capacity Process Utilization = (Resource) Throughput Rate Process Capacity Utilization of Resource = Capacity Requested by Demand Available Capacity Implied Utilization =

Ice cream making process utilization at TH=1.5 batches/hr 1.5/1.5 = 100% Cooking process utilization = Cooling process utilization = Freezing process utilization = Packing process utilization = 1.5 / (2 x 4/3) = 57% 1.5 / (2 x 1) = 75% 1.5 / (1 x 3/2) = 100% If the demand is 2 batches per hour, Implied Utilization of Freezing = Implied Utilization of Packing = 2 / 2 = 100% 2 / (3/2) = 133%

Define a “job” (flow unit) = Batch of 100 liters – ice cream (3/2) / (8/3) Cooker 3/4 hr 4/3 b/hr 2 8/3 57% Cooler 3/4 hr 4/3 b/hr 2 8/3 57% 3/2 b/hr Freezer 1 hr 1 b/hr 2 75% Packer 2/3 hr 3/2 b/hr 1 3/2 100% *assuming system is processing at full capacity

BREAK

Flow Unit = 1 batch of 50 croissants RM: Dough Mix Pack WIP: Finished Goods Bake Proof Roll & Cut Fill & Fold Filling 5 min/b 15min/b 10 min/b 5min/b 20min/b 10min/b 5 min/50 Croissants 15min/50 10 min/50 5min/50 20min/50 10min/50

∞ RM: Dough Mix Pack WIP: Finished Goods Bake Proof Roll & Cut Fill & Fold Filling 5 min/b 15min/b 10 min/b 5min/b 20min/b 10min/b ∞

∞ ∞ Define a “job” (flow unit) = 1 batch of 50 croissants 1 1/6 hr Mix Filling 1 1/6 hr 10 min. 6 b/hr 6 b/hr 100% Mix and Roll Dough 1 5 + 5 min. 1/6 hr 6 b/hr 6 b/hr 100% 6 b/hr 1/4 hr ∞ ∞ Proof 4 b/hr Fill and Fold 1/12 hr 12 b/hr 1 12 b/hr 50% 1/3 hr 3 b/hr 2 6 b/hr 100% Oven 1/6 hr 6 b/hr 1 6 b/hr 100% Pack *assuming system is processing at full capacity

What is the bottleneck rate? (batches per hour) What is the system process time? (hours) Bottleneck = All but Fill and Fold rB = 6 batches per hour

Flow Unit = 1 batch of 50 croissants RM: Dough Mix Pack WIP: Finished Goods Bake Proof Roll & Cut Fill & Fold Filling 5 min/b 15min/b 10 min/b 5min/b 20min/b 10min/b

What is the bottleneck rate? (batches per hour) What is the system process time? (hours) Bottleneck = All but Fill and Fold rB = 6 batches per hour TMin = 5 min + 15 min + 5 min + 5 min + 20 min +10 min = 60 min = 1 hr

5 min. / batch 60% 20 min. / batch 40% Average unit Fill & Fold 20 min. / batch 40% Average unit p = 5 min. x 60% + 20 min. 40% = 11 min. = 0.1833 hr.

∞ ∞ Define a “job” (flow unit) = 1 batch of 50 croissants 60/40 mix Mix Filling 1/6 hr 6 b/hr 1 6 b/hr 90.9% 100% Mix and Roll Dough 1/6 hr 6 b/hr 90.9% 100% 6 b/hr 1 6 b/hr 5.45 b/hr 1/4 hr ∞ ∞ Proof 4 b/hr 5.45 b/hr Fill and Fold 0.1833 hr 5.45b/hr 1 50% 100% 1/3 hr 2 90.9% 3 b/hr 6 b/hr 100% Oven 1/6 hr 6 b/hr 1 6 b/hr 90.9% 100% Pack *assuming system is processing at full capacity

BREAK