Gas-Electric Coordination Update JGC Meeting August 23-24, 2012.

Slides:



Advertisements
Similar presentations
Electricity and Natural Gas Supply, Reserves, and Resource Adequacy CMTA Energy Conference Energy: Growing Californias Economy William J. Keese California.
Advertisements

© 2004 Dominion Dominion Proposal January 24, 2005.
©2005 PJM 1 Development of Wholesale Electricity Scheduling and OASIS Determining the Future Needs of the Open Access Same-time Information System Andy.
NAESB Strawman January 24-25, Problem Statement Enough generators must have fuel to meet peak load New England Cold Snap crisis heightened interest.
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
Definition of Firm Energy and Interruptible Transmission Two Issues Causing Problems for Business in the Western Interconnection.
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
WECC - Addressing Commercial Practices Ed Beck Chair, Market Interface Committee.
2007 Goals. Introduction Western Electricity Coordinating Council (WECC) will be primarily defined throughout the 2007 year by Electric Reliability.
© 2009 The Williams Companies, Inc. All rights reserved. ______________ WECC November 12, 2012.
Craig L. Williams UFAS Liaison Market Interface Manager ECC Cost Benefit Analysis Review July 17-19, 2013 Standing Committees Joint Session.
WECC Response to BAL-002-WECC-1 Remand Order December 10, 2010 WECC Board of Directors Meeting Steve Rueckert Director of Standards.
Western Electricity Coordinating Council Market Interface Committee Report to the WECC Board of Directors December 6-7, 2007 Robert D. Schwermann MIC Chair.
CAISO Gas-Electric Operations Coordination Overview Greg Van Pelt Brad Bouillon November 13, 2012.
Unscheduled Flow Administrative Subcommittee Report David Lemmons March 27, 2013 Salt Lake City, UT.
Presented to the WECC MIC June 15, 2007
Market Interface Committee Recent Regulatory Activities Philip Tice October 14, 2011.
1 NERC Update WECC OC Meeting June 19, Two Items Variable Generation Reliability Reports.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
NECPUC SYMPOSIUM Concurrent B Natural Gas Conditions Facing New England Mark R. Babula ISO New England Inc. Supervisor - Power Supply & Reliability June.
FPSC Ten Year Plan Workshop Nuclear Panel Steven Scroggs Senior Director, Project Development Florida Power & Light Company August 15, 2007.
1 Bradley Nickell Director of Transmission Planning 10-Year Regional Transmission Plan WECC Overview September 2011.
EMS Checklist (ISO model)
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
© 2012 Day Pitney LLP FERC Gas/Electric Coordination Proceeding presented to NEPOOL Reliability Committee March 13, 2012 Joseph H. Fagan (202)
Probabilistic Volatility in the Western Interconnection Matthew Elkins.
Enhanced Curtailment Calculator (ECC) Task Force Joint Guidance Committee Presentation and Motion to the OC & MIC Standing Committee Meetings March 27-29,
CUG Meeting June 3 – 5 Salt Lake City, UT
Total Utility Management Services, LLC is committed to helping your organization make the best informed energy decisions with decades of cost-proven results.
Internal Control–Integrated Framework
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
California Energy Commission 1 Energy Workshops for W&WW Agencies UTILITY STRATEGIES FOR SHIFTING PEAK DEMAND PERIOD WATER & ENERGY USE REGIONAL STRATEGIES:
Al McBride MANAGER, AREA TRANSMISSION PLANNING Existing Import Interfaces: Transmission Transfer Capabilities and The Calculation of Tie Benefits DECEMBER.
ACC Workshop Regarding Notice of Inquiry on Natural Gas Infrastructure September 10, 2003.
California Energy Commission Retail Electric Rate Scenarios: Key Drivers and Structure 2015 Integrated Energy Policy Report California Energy Commission.
 2005 Pinnacle West Capital Corporation Palo Verde Hub Participant Meeting May 27, 2005 Arizona Public Service Company Tom Glock – Manager Power Operations.
1 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS Session 4 Discussion of Alternatives and Implementation Activities for Real- Time.
1 R : LTPP Track II Workshop – Operating Flexibility Modeling Results Patrick Young Analyst, Generation & Transmission Planning California Public.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
Pat Wood III, Chairman Federal Energy Regulatory Commission Bringing Power to California Customers Silicon Valley Manufacturing Group May 27, 2004.
Peak RCCo Performance Metrics Draft –November 2013.
FERC’s Role in Demand Response David Kathan ABA Teleconference December 14, 2005.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
The Western Interconnection The West has only one RTO/ISO, the California Independent System Operator, the most costly RTO in the US at $229.2 million.
Andy Meyers Bonneville Power Administration Market Interface Committee Update ISAS April 2015 Salt Lake City, UT.
Grid Reliability -- Needs of Nuclear Power Plants Joe McClelland, Director Division of Reliability Joint NRC/FERC Meeting April 24, 2006.
1 Is there LNG in California’s Future? “LNG: When East Meets West” Zeus Development Conference Long Beach, CA by David Maul Manager, Natural Gas Office.
Monterey Plaza Hotel October 8-10, 2007
Craig Williams Market Interface Manager August 21, 2014 ISAS, Portland, OR.
Aliso Canyon Reliability Briefing to the Porter Ranch Community Advisory Committee Edward Randolph, Energy Division Director, California Public Utilities.
RETI 2.0 Objectives The Clean Energy and Pollution Reduction Act of 2015 (Chapter 547, Statutes of 2015) increases the RPS to at least 50 percent of retail.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
JJ Jamieson MIC Chair MIC 2015 GOALS March 24, 2015 SLC.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
RTO WEST Summary of RTO West 9/18/02 Declaratory Order Presentation to The Committee on Regional Electrical Power Cooperation (CREPC) by John Carr 10/1/02.
California Senate Energy, Utilities and Communications Committee Oversight Hearing May 10, 2016 Southern California Edison Colin Cushnie Vice President,
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Natural Gas Infrastructure Assessment
Briefing on 2017 CAISO Policy Initiatives Roadmap
MIC Committee Discussion
Reliability Assessment Committee Reliability Workshop Priorities
WECC Staff Risk Prioritization
Byron Woertz, Manager—System Adequacy Planning
Reliability Assessment Committee Reliability Workshop Priorities
Byron Woertz, Manager—System Adequacy Planning
WECC Staff Risk Prioritization
MAC Report Gas-Electric Interface Study
MIC Committee Discussion
California Transportation Electrification Activities
Presentation transcript:

Gas-Electric Coordination Update JGC Meeting August 23-24, 2012

2 Natural Gas Export Trend

3 Power Plants Turn to Natural Gas

4 Renewables Cant Compete

5 West region: Tuesday August 28 th, 2012 at the DoubleTree by Hilton Hotel in Portland, OR. Conference is free and open to the public. Commission members may participate. Will not be transcribed, but there will be a free audiocast of the conference that allows persons to listen, but not participate. FERC Technical Conference

6 Regional Energy Infrastructure Presentation by FERC staff. First Roundtable Discussion: Gas-Electric Coordination and Market Structures in the West. Describe the policies and practices in your region that impact the procurement of gas transportation and storage capacity purchases by gas-fired generators. FERC Conference Agenda

7 How does your region approach the question of gas infrastructure adequacy? What types of services offered by natural gas pipelines and storage providers throughout the West would best meet the needs of gas-fired generators in the region? How diverse (or consistent) are nomination, scheduling and commitment practices across the region? FERC Conference Agenda

8 Second Roundtable Discussion: Communications/Coordination/Information- Sharing. How are coordination and information-sharing regarding both emergency and planned outages handled by affected gas and electric entities in the different regions? FERC Conference Agenda

9 The gas pipelines in California and the CAISO have worked to improve their coordination of planned outages. What is the impact of electric system outages upon the gas system, and visa versa? Are further changes needed? Is there additional information that needs to be shared between gas and electric entities that currently is not being shared, and are all the relevant and necessary parties included? FERC Conference Agenda

10 With increased reliance on gas-fired generation, what changes in communications and real-time data sharing protocols will be needed to accommodate the expected increase in fluctuations and variations in gas usage? Based on experience in your region, what aspects of FERC Standards of Conduct need to be clarified or potentially revised to improve gas- electric communications and coordination? FERC Conference Agenda

11 Third Roundtable Discussion: Reliability. Is there a need for a minimum level of dependability in the fuel supply for gas-fired generators? What tools are available to regions to manage gas-fired generation swings and preserve reliability, in areas without gas storage? FERC Conference Agenda

12 What happens when there are events that impact pipeline deliverability in those regions? To what extent do the regions in the West coordinate studies of the natural gas and electric systems to analyze forecasted resource mix and/or interdependency risks from curtailments or contingencies? Can this be addressed through existing transmission planning processes or are different processes needed? FERC Conference Agenda

13 Are sufficient emergency coordination procedures in place in the West? Are these procedures routinely tested through functional exercises or simulations? Should all regions within the West routinely conduct joint functional exercises? FERC Conference Agenda

14 General Discussion of Other Region-Specific Issues Affecting Gas-Electric Coordination. Electric markets in the West function differently in California, the Pacific Northwest and in the rest of the Western Interconnect. Are there any specific issues of concern that have not been addressed? FERC Conference Agenda

Craig L. Williams Market Interface Manager c Questions?