GIVEN GEOMORPHIC REGIME AND IMPACTS, WHAT IS REQUIRED?

Slides:



Advertisements
Similar presentations
Risk Assessment Refinement BARRIERS TO MIGRATION Aerial Imagery Capture and Processing Derive Channel TypologiesDevelop Remote Sensing Methods Fieldwork.
Advertisements

Out Year Operations and Maintenance Costs Required to Implement/Carry out MVID Rehabilitation Project.
Washington Department
Lawyer Creek Steelhead Trout Habitat Improvement Project presented by: Lewis Soil Conservation District.
Protect and Restore Little Salmon River Project # Nez Perce Tribe Fisheries/Watershed Program By Chad Fealko.
Ecosystem Flows Hydrology and Connectivity Joe Trungale October 2, 2006.
River Pathways An Introduction to Riparian Areas.
Aquatic Habitat Guidelines - Stream Restoration Guidelines
© Mark Godfrey Brian Richter, Director Global Freshwater Program © Insert Image Credit Environmental Flows for People and Nature.
Reclamation Plan Project Purpose: To Satisfy Syar’s Reclamation Obligation under SMARA for the Healdsburg Terraces (Basalt, Phase I, Phase II and No Name.
Mordecai Lincoln Dam & Hunters Pond, Scituate, MA
Changes in River - Land Uses and Management: Implications for Salmonid Habitat Restoration in the Cedar River, Washington Changes in River - Land Uses.
Influence of Geomorphic Complexity on Hyporheic Flow and Nutrient Processing Prepared by Dan Baker for CE 413.
Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research Program Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research.
Biological Objectives Tied to Physical Processes Dr. William Trush Scott McBain Arcata, CA.
Large Wood Treatment on Habitats and Fish Populations of Green River and Crab Creek Bio-Surveys, LLC 2007 Presented by Esteban Quiles.
A Review of Stream Restoration Techniques and a Hierarchical Strategy for Prioritizing Restoration in Pacific Northwest Watersheds North American Journal.
Dylan Castle Earth and Physical Science Department Western Oregon University Monmouth, Oregon
Environmental flows in Europe Mike Acreman. Green and pleasant land? Thames basin 10,000 km mm rainfall 15 million people significant water stress.
Watershed Assessment and River Restoration Strategies
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
King County Normative Flow Project Parametrix, King County, Herrera, & Foster Wheeler Normative Flow Studies King County Department of Natural Resources.
Thomas R. Payne & Associates Update on Flood Storage Fish Study Presented by Paul Schlenger, Bob Montgomery, Jim Shannon June 15, 2011.
Suggested Guidelines for Geomorphic aspects of Anadromous Salmonid Habitat Restoration proposals G. Mathias Kondolf.
Interim Headwater Drainage Feature Guideline: Protecting HDFs through Urbanization Laura C.R. Del Giudice, B.Sc., M.F.C., Senior Planning Ecologist.
Standards for Ecologically Successful River Restoration Palmer et al., 2005, Standards for Ecologically Successful River Restoration Palmer et al., 2005,
Channel Modification Washington Dept. Forestry, 2004, Channel Modification Techniques Katie Halvorson.
Chumstick Creek Salmon Habitat Conditions* Land development, road construction, and other human activities have affected channel migration and sediment.
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
Teaching where science and policy intersect by developing a river restoration plan on a local stream Gabrielle David Department of Earth and Environmental.
Managing the Environmental Impacts of Hydropower Scottish R&D Programme IWRM Stockholm November 2008.
Mission, Brender, and Yaksum Creeks Habitat Conditions Low flows and associated high temperatures affect distribution and abundance of native species.
Understanding Creeks, Rivers, and Riparian Areas.
Dry Creek Fish Habitat Enhancement Feasibility Study Current Conditions Summary.
Importance of the Lower Wenatchee River in Salmon Recovery* The Lower Wenatchee is a critical migration corridor for all ESA listed species Of the total.
Coos Watershed Association Watershed Restoration Projects.
Reach 1. Reach 2 Reach 3 Reach 4 Benchmark levels: Undesireable Desireable More Than Less Than Goals/Benchmarks: 30% Pools Riffles present.
03Nov2006 Revision11 Priority Questions of TID/MID/CCSF Regarding Tuolumne River Salmonids & Macroinvertebrates.
Riparian Areas: Functions and Conditions Authors: Gene Surber, MSU Extension Natural Resources Specialist Bob Ehrhart, Research Specialist, RWRP, Univ.
Aquatic Resources Work Group Meeting December 18, 2008.
Watershed Restoration Overview for the Klamath Basin.
Expected Long Term Site Evolution of Alameda Creek and former Salt Ponds following Tidal Marsh Restoration Matt Wickland Philip.
U N I T E D S T A T E S D E P A R T M E N T O F C O M M E R C E N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N The.
Natural and artificial hydromorphological changes in Norway Agnès Moquet-Stenback – Section for erosion and sediment transport – Hydrology.
Fish Community Structuring in the Restored Hobble Creek Delta : Chad Landress, Utah Division of Wildlife Resources The Importance of Intrinsic Physical.
Obion Creek Stream Restoration Restoration of a Channelized Straight-line Ditch to a Naturalized Meandering Stream Presented by Robert B. Johnson Jackson.
Chelan County Lead Entity Presentation SRFB 2005 Salmon Habitat Grant Cycle.
SONOMA CREEK AND SEDIMENT: KNOWING WHAT WE DON’T KNOW MAY 2011.
Dams Helpful or Hurtful?.
Defining Good Ecological Potential : Method used in the UK Niall Jones Hydro-morphology senior advisor Environment Agency.
Side Channel and Off Channel Habitat Restoration Washington Dept. Forestry, 2004, Side Channel Restoration Dylan Castle.
Snohomish County Surface Water Management R2 Resource Consultants
Department of Forestry 2004 Stream Habitat Restoration Guidelines
A Review of Stream Restoration Techniques and a Hierarchical Strategy for Prioritizing Restoration in Pacific Northwest Watersheds North American Journal.
Translating restoration priorities
Fish Passage Restoration at Roy’s Pools
Cowichan Chinook Workshop March 2013
Watersheds as Integrators of Climate: The Hydrogeomorphic Template as
Restoration Considerations
Flow Regulation on the River Awe
Glen Canyon Dam Determining Best Management Practices.
Healthy Rivers & River Restoration
Winter Water: A hot topic for cold fish.
Turloughs (1) Definition:
Presentation by Graham Kissack
Common Stream Habitat Problems
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY.
Salmon Spawning Habitat and Sediments
Tucannon River Programmatic Habitat Program (a 30 mile long project)
Presentation transcript:

GIVEN GEOMORPHIC REGIME AND IMPACTS, WHAT IS REQUIRED? Potential for geomorphic work Degree of impact to natural physical process GIVEN GEOMORPHIC REGIME AND IMPACTS, WHAT IS REQUIRED? ‘FUNCTIONAL DESIGN’ ‘INITIAL CONDITIONS DESIGN’ ACTIVE RESTORATION ‘ASSISTED RECOVERY’ ‘DO NOTHING’ HYTECH Symposium, Aug. 2016

Project Example (UK) – River Nairn at Aberarder IFM ‘The Big Fish’, Oct. 2017

Project Example (UK) – River Nairn at Aberarder 20th September 2017 flow IFM ‘The Big Fish’, Oct. 2017

Project Example (UK) – River Nairn at Aberarder IFM ‘The Big Fish’, Oct. 2017

Project Example (UK) – River Nairn at Aberarder 9th Oct. 20th Sept. 20th Sept. POT TAIL 9th Oct. flow IFM ‘The Big Fish’, Oct. 2017

ECOLOGICAL BENEFITS OF WETLANDS Refugia from high flows and cover from predators – access back to main channel important Potentially important in controlling water temperatures Maintaining river baseflows in the summer Management/ storage of fine sediment Rearing habitat? (high food supply/ low energy expenditure) 2. Potentially overwintering habitat? IFM ‘The Big Fish’, Oct. 2017

Project Example (UK) – River Nairn at Aberarder ~28,200m2 of online wetland habitat created flow flow Approximate extents of wetland/ pond areas areas. IFM ‘The Big Fish’, Oct. 2017

Project Example (UK) – River Nairn at Aberarder flow IFM ‘The Big Fish’, Oct. 2017

Project Example (UK) – River Nairn at Aberarder flow IFM ‘The Big Fish’, Oct. 2017

Project Example (UK) – River Nairn at Aberarder flow Baseline data available for fish populations and post-implementation monitoring planned. Monitoring underway – post-construction physical resurveys already begun and plan to be conducted periodically. IFM ‘The Big Fish’, Oct. 2017

Allt Lorgy: Restoration Plan Main tool: large wood and rootwad placements. Removal of boulder armour Removal of embankments Gravel augmentation

Comparison of old and new channels (4 years apart) Aerial image mosaic of post-restoration channel Pre-restoration channel

Allt Lorgy 2D hydraulic model Focus in on an area where the restoration (with large wood) has increased hydraulic complexity Detailed topographic survey and 2D hydraulic models pre and post-restoration. Redd surveys.

Project Example (UK) – Allt Lorgy 2012 2014 IFM ‘The Big Fish’, Oct. 2017

Project Example (UK) – Allt Lorgy 2011 (pre-design) 2014 MODELLED SPAWNING HABITAT Pre-design to post-flood REDDS REDD 14 redds in 2016! IFM ‘The Big Fish’, Oct. 2017

Acknowledgements HYTECH Symposium, Aug. 2016