Parity Quality Beam (PQB)

Slides:



Advertisements
Similar presentations
Source Outlook High polarization strained-layer photocathodes were activated in both electron guns during the summer shutdown, with usual QE (0.2% at 850.
Advertisements

Beam-based Measurements of HOMs in the HTC Adam Bartnik for ERL Team, Daniel Hall, John Dobbins, Mike Billing, Matthias Liepe, Ivan Bazarov.
CEBAF Photoinjector: What’s new, what’s the same since HAPPEx 2004? What needs to be done? M. Poelker, HAPPEx collaboration meeting, Feb. 18, 2005.
Parity Quality Beam (PQB) April 07, Notes: 1.For each BPM, the wires are: +X+, +X-, +Y+, +Y- 2.There are only two injector BPMs we are not reading:
Compton polarimetry for EIC Jefferson Lab Compton Polarimeters.
Commissioning August & September. 2 Agenda 11:20 Coffee 11:30 Introduction Sue S 11:35 Controls (an overview) Brian M 10:55 Controls & Data Acquisition.
G 0 PC Installation and Beam Studies June & July 2006 Stephanie Bailey Riad Suleiman.
Hall A Gmp / DVCS Fall preparation September 16 th 2014 Hall A meeting Alexandre Camsonne 1.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
Electronic Cross-talk & Ground Loop Elimination in Injector Riad Suleiman Center for Injectors and Sources.
PQB Photocathode Analyzing Power Study May 19, 2009.
JLab Polarized Source Happex Collaboration Meeting May 18, 2007 P. Adderley, J. Brittian, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
PAVI ’06 Milos May 20, 2006 Kent Paschke – University of Massachusetts Controlling Helicity-Correlated Asymmetries in a Polarized Electron Beam Kent Paschke.
Polarized Source Development Run Results Riad Suleiman Injector Group November 18, 2008.
Real-time Parity Feedback John Hansknecht & Riad Suleiman April 28, 2009.
Parity Quality Beam (PQB) Study Injector Group November 10, 2008.
Hall A Parity Workshop (May 10, 2002), 1 Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson.
Thomas Jefferson National Accelerator Facility Page 1 23 rd Annual HUGS Program June 2-20, 2008 CEBAF Overview HUGS08 June 3 CEBAF Overview HUGS08 June.
#3205 Summary Studying beam instabilities along bunch train 3 observables – INJ-BPM-01 fast bunch electronics – INJ FCUP-01 – Laser pulse power. Laser.
Short Tutorial on Causes of Position Differences… …and what we can do about them (most slides stolen from Cates PAVI ’04 talk)
G 0 Coordinator Update & “To-Do List” Joe Grames William & Mary, June 5-6, 2006  Hall C Beam Line Tasks  Accelerator Preparation Tasks  Beam Halo 
PQB Meeting Intermediate Frequency (IF) Cards Study & BPMs Summary March 24, 2009.
Fast Helicity Reversal Riad Suleiman Injector Group June 2, 2009.
FLASH II. The results from FLASH II tests Sven Ackermann FEL seminar Hamburg, April 23 th, 2013.
Parity Quality Beam (PQB) Study Injector Group September 2008.
Thomas Jefferson National Accelerator Facility G0 Collaboration Meeting, June 18-19, 2003 Updates G0 Tiger Laser High Polarization Photocathodes Mott polarimeter.
Beam Loading experiment at KEK ATF ( Multi-train acceleration at KEK-ATF Injector ) KEK Masafumi Fukuda and Junji Urakawa LCWS /10/052 train acceleration.
Helicity Magnets Commissioning February 7, 2007 Hari Areti, Chao, Brad Cumbia, Jeff Dale, Richard Dickson, Joe Grames, Roger Flood, Scott Higgins, Matt.
G 0 PC Installation and Beam Studies Stephanie Bailey Riad Suleiman.
Re-designing the Helicity Board Riad Suleiman Injector Group March 19, 2009.
Beam Optics for Parity Experiments Mark Pitt Virginia Tech (DHB) Electron beam optics in the injector, accelerator, and transport lines to the experimental.
Injector Status & Commissioning QWeak Collaboration Meeting May 24, 2010 P. Adderley, J. Clark, S. Covert, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
#3205 Summary Studying beam instabilities along bunch train 3 observables – INJ-BPM-01 fast bunch electronics – INJ FCUP-01 – Laser pulse power. Laser.
Parity Experiments and JLab Injector Riad Suleiman February 5, 2016.
CEBAF Source and Injector Status PREx-II Collaboration Mtg Feb. 26, 2016 Matt Poelker and Joe Grames Center for Injectors and Sources.
G 0 Project Coordinator Report Joe Grames “Big Picture” Schedule Preparations Polarized Source Injector Accelerator Hall C Accelerator Plans for 687 MeV.
Parity Quality Beam (PQB) B-Team Meeting September 10, 2008.
Polarized Injector & Upgrade Schedule QWeak Collaboration Meeting November 06, 2009 P. Adderley, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
Polarized Injector Update
Multi-bunch Operation for LCLS, LCLS_II, LCLS_2025
Parity Violation Experiments & Beam Requirements
with help from Riad Sulieman, Arne Freyberger, and Joe Grames
Timing and synchronization at SPARC
A Mini-Primer for Parity Quality Beam (as seen from the Accelerator)
DC Injector and Space Charge Simulation Status
G0 Backward Angle Accelerator Preparations
Parity Violation Experiments at JLEIC
Accelerator Issues Raised in Hall A Parity Collaboration Meeting, April B-Team Meeting April 29, 2009.
Thoughts on why G0 needed position feedback and HAPPEX didn't
Thoughts on why G0 needed position feedback and HAPPEX didn't
QWeak Collaboration Meeting
UITF MPS system requirements
G0 PC Installation and Beam Studies
Qweak Coordination Meeting
Polarized Source Development Run Results
Feedback Systems Joe Grames Hall A Parity Meeting Jefferson Lab
Riad Suleiman February 2, 2017
Helicity Magnets for PQB Feedback Helicity Magnets for PZT Booster
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Polarized Source: Recent Activities
PQB Meeting March 05, 2009.
Beam Position Noise from 500 keV MBO0I06 Dipole Sensor
G0 PC Installation and Beam Studies
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
LCLS Injector Commissioning P
MEIC Polarized Electron Source
Spot-Size Reduction 4/5/2017.
Injector Commissioning & Optimization
Comparison between 4K and 2K operation performance of CEBAF injector cryomodules Grigory Eremeev Monday, August 19, 2019.
Presentation transcript:

Parity Quality Beam (PQB) B-Team Meeting December 03, 2008

PQB ATLis Tasks Task: Commissioning of the Fast Helicity Reversal 30 Hz: The standard PQB at 30 Hz was achieved. 250 Hz: The PQB is very similar to 30 Hz otherwise for the 60 Hz noise. 1 kHz: The PQB is very similar to 30 Hz, again issues with 60 Hz noise (less sensitive than at 250 Hz). Issues: DAQ did work at 1 kHz and 100 µs but did not with: 500, 60, and 10 µs. Just fixed 1 kHz with 500 and 60 µs, still DAQ is not working with 10 µs. BPMs Electronics are affecting short T-Settle studies (see backup slides). Find the right T-Settle. Action: New charge feedback scheme need be implemented: No slow controls (EPICS), zeroed the asymmetry for each of the 4 helicity sequences → use “Injector Net”. New Helicity Board design: Easy to program, more outputs.

Task: Halls Crosstalk and the Effect on Parity Quality Beam Did Hall C current and laser phase scans and measured Hall A PQB (no crosstalk observed), To do (30 Hz): repeat once QE is bad. To do (30 Hz): Check with IA scans (change charge asymmetry of one beam, measure effect on the other). To do (30 Hz): Measure crosstalk in the Hall to look for RF beam loading (new ATLis Task). Task: Eliminate the Vacuum Window Birefringence by Rotating the LLGun2 Photocathode Tried once, but PQB was bad to start with. To do (30 Hz): Repeat again when we get a chance (before re-activation). Task: Check Helicity Magnets, Mott Polarimeters at 1 kHz Checked fine at 250 Hz last year. To do (1kHz): Check at 1 kHz.

Task: Commissioning of the New Pockels Cell HV Switch Switch is fine. No electrical pickup from the switch. Task: Searching for EM Noise from the 500 keV PSS Dipole Current Sensor Found and will be fixed To do (1 kHz): More noise still there; Ion Pumps VIP0L02/3 local power supplies (new ATLis Task).

Backup Slides

Note the big change in the first block due to BPMs electronics readout.

BPMs Electronics Notes: Chan 1: X+, Chan 2: X-, Chan 3: MPS (Trigger) Pockels Cell ON Pockels Cell OFF Pockels Cell ON Pockels Cell OFF

Injector iocse11, iocse12, and iocse19 have “TRANSPORT” style IF cards Notes: Injector iocse11, iocse12, and iocse19 have “TRANSPORT” style IF cards To study Pockels Cell Settling Time, should we: Change to LINAC? Use Hall BPMs? Use laser Quad Photodiode (QPD)? Change to 12 GeV IF style cards? Hall C: Hall C iocse18 and iocse14 have “TRANSPORT” style IF cards Hall C iocse17 has “LINAC” style IF cards Hall A? TRANSPORT LINAC Sample Time 140 µs 8.6 µs Fixed Delay 70 µs 4.3 µs Dynamic Range 70 nA – 200 µA 700 nA – 2,000 µs

Hall C Current Scan No obvious dependence

Hall C Laser Phase Scan No obvious dependence. Try again once the photo cathode QE worsen.