Apparel management & quality control

Slides:



Advertisements
Similar presentations
Lean Manufacturing.
Advertisements

WAREHOUSING MANAGEMENT
WAREHOUSING MANAGEMENT
Computer Integrated Manufacturing CIM
8–1. 8–2 Chapter Eight Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
THE WORLD OF FASHION MERCHANDISING
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
Understanding the Global Apparel Manufacturing Process 2.02
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
Engineering Manufacturing Facilities
Manufacturing Engineering Department Lecture 1 - Introduction
PHYSICAL DISTRIBUTION. Logistics & Supply Chain Logistics Component parts & Raw material In-process inventory Finished goods Supply Chain.
Alissa Brink Gabriela Iasevoli Jason Oesterle Joey Tamburo
SchedulingProducingControllingSchedulingProducingControlling.
Dr. Osama Al-Habahbah Automation Chapter 1 Introduction.
Layout Strategy.
Lean Production - Objectives
Chapter 3 Storage Systems
IM MATERIAL HANDLING. Material Handling Material handling is the function of moving the right material to the right place in the right time, in the right.
Chapter 11: Strategic Leadership Chapter 8 Production and operations management.
Chapter 4 Process Design.
How is a manufacturing facility planned?
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Costing and the Value Chain Chapter 18.
Level 2 Unit 6 Application of Manufacturing Techniques in Engineering Engineering Diploma Level 2 Unit 6 Application of Manufacturing Techniques in Engineering.
Ch. 20: Operation systems Learning Objectives Distinguish among various types of production and manufacturing processes. Describe product innovation.
Technical Analysis. Technical analysis of a project idea includes an in depth study of all technical aspects related to Technical analysis of a project.
C Learning Objectives Power Notes 1.Just-in-Time Principles 2.Applying a Just-in-Time Approach 3.Accounting for Just-in-Time Operations 4.Accounting.
BASICS OF PRODUCTION SYSTEMS
1 Slides used in class may be different from slides in student pack Technical Note 6 Facility Layout  Facility Layout and Basic Formats  Process Layout.
Chapter 1 Introduction EIN 3390 Manufacturing Processes Summer A, 2011.
SchedulingProducingControllingSchedulingProducingControlling.
Chapter 12 THE FUTURE OF BUSINESS Gitman & McDaniel 5 th Edition THE FUTURE OF BUSINESS Gitman & McDaniel 5 th Edition Chapter Achieving World-Class Operations.
UNIT-IV Shop Floor Control and Flexible Manufacturing Systems
IENG 301 FUNDAMENTALS OF WORK STUDY AND ERGONOMICS
Manufacturing and Service Processes
Lesson objective – to understand what is meant by one-off, batch and mass production Textiles – Production Processes.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
Understanding the Global Apparel Manufacturing Process: PRODUCT ASSEMBLY.
Chapter 1 Introduction EIN 3390 Manufacturing Processes Summer A, 2012.
Industrial Machinery.  The machine opposite is a lock stitch machine.  It only does a basic straight stitch.  Different specialist machines do other.
Automated flow line Meghana.
Definition: The physical positioning of processes, departments, equipment and work areas to optimize an organization’s effectiveness in achieving its operating.
Insulating Glass Manufacturing Quality Procedure Manual TM (07)
Apparel Industry Careers Apparel Manufacturing/Production
Interactive Factors in Manufacturing
UNIT-III Operations Management PREPARED BY CH. AVINASH.
Computer Integrated Manufacturing CIM
KESEIMBANGAN LINI PRODUKSI (PRODUCTION LINE BALANCING) (Bagian 1)
Basics of Garment Manufacturing
Common Learning Blocks
AS/RS (Automated Storage/Retrieval System)
The University of Jordan Mechatronics Engineering Department
Total Productive Maintenance and Maintenance Management
“GARMENT PRODUCTION SYSTEM”
PRODUCTION TYPES.
Facility Layout McGraw-Hill/Irwin.
Computer Integrated Manufacturing ( CIM). Chapter One 1.1 Introduction 1.2 Types of Manufacturing 1.3 CIM Hardware and CIM Software 1.4 Nature and Role.
Material Requirements Planning (MRP)
World-Views of Simulation
Product Assembly Apparel assembly usually involves one of four basic methods: Whole Garment/Tailoring Progressive Bundle/Piecework Unit Production Modular.
1 Operations Management Layout Strategy. 2 What is Facility Layout Location or arrangement of everything within & around buildings Determines long-run.
Facilities and Layout Planning
Chapter 6A Facility Layout 2.
QE 107: Workshop Technology Section 5: Manufacturing Organisation
COMMERCIAL MANUFACTURING PRACTICES
Manufacturing Production Planning
Manufacturing Operations
Understanding the Global Apparel Manufacturing Process 2.02
WHY SEWBOTS? Automation Cost Reduction Technology.
“Cellular Manufacturing”
Presentation transcript:

Apparel management & quality control

Types of production processes Progressive Bundle System Modular Production System Unit Production System

Progressive Bundle System (PBS) The Progressive Bundle System the bundles of garment parts are moved in a sequence from one operation to another. The operators specialize in one major component and sew it from beginning to end. The garments are gradually assembled as they move through successive sub-assembly and main assembly operations in bundle form. This system, often referred to as the traditional production system.

Modular Production System (MPS) This system focuses on a team method of assembly. The members of a team are responsible for either the entire garment or a specific operation of the assembly process, depending on the overall production plant and the number of components to be put together. MPS is efficient garment assembly system as it reduces production time and improves quality. Since workers get to do different tasks, there is cut down on work monotony and job performance is enhanced.

Unit Production System (upS) It is a type of assembly line layout that uses an overhead transportation system to move garment components from one work station to another for assembling the garment. All the parts for a single garment are moved forward through the production line by means of a hanging carrier that travels along an overhead conveyor.

Material Handling Systems Used in the Garment Industry Material handling system plays an important role in improved material flow and increasing production performance in the readymade garment industry. If you ever visited a garment factory, you might have seen various kind of material handling equipment used by them. In this post I’ll be discussing different types of material handling systems found in the readymade garment industry.

Material handling system- Definition The means used for transporting work (like fabrics, cuttings, bundles, finished garments and general items) from one place to another, storing materials and protecting material from damage, are called material handling system. It may be an equipment, device or procedures. For better material handling, equipment are engineered according work place design

Material handling equipment for cutting department Cutting department is responsible for cutting garment patterns/component from the fabric rolls. Cutting department has to handle lot of fabrics and cutting bundles. So they need material handling tool and equipment like these. Trolleys: For transporting fabric from fabric store to cutting section. Forklifts are also used for this purpose. Baker's trolley: For stacking cuttings and transporting cutting bundles to stitching floor Plastic trays and trolleys: Cut pieces are placed on treys. Trays filled with garment with certain number of pieces are placed in trolley. Fabric Bags: Cuttings are bagged into fabric bags or plastic bag and carried out to production section manually. Racks: Racks used for storing cutting bundles (WIP). 

Material handling equipment for stitching department Garment stitching department does stitching of garments from fabric (cuttings). Different types of line layout for stitching line are found in the garment industry. Based on the production line layout, material handling system is designed. In stitching department material handling system is needed for transporting bundles from one workstation to next workstation, and for storing WIP.  Conventional side table (with bin): A side bench or a side table is placed for loading cuttings and disposing stitched garments. This kind of layout is normally found in group production system and make-through production system. Centre table: Centre table is the most common material handling system used in the production line (progressive bundle system and single piece production system). A bench (2-1.5 ft wide) is placed in between two rows of machines. See following images.

Material handling equipment for stitching department 

Trolleys: Cutting bundles are stacked on trolley and the trolley is moved in the line. Some factories found it difficult to assess WIP in the line by using trolley system. These trolleys are useful for trouser manufacturing. See image

Plastic crates and Bins: Bins are used for disposing stitched garments Plastic crates and Bins: Bins are used for disposing stitched garments. Plastic bins are used for transporting garments from one place to another.  Overhead production system (unit production system): Many production units use overhead rail and hanger for transporting material. Factories found it is easy to track WIP on the UPS system. Some factories experience issue in line balancing. Different types of overhead hanger system are available. Example of manual hanger system and computerized hanger systems are shown in following images. Manual hanger system:

Semiautomatic hanger system: Computerized hanger system:

Material handling equipment for finishing department: In the finishing department, garments are pressed, checked, folded and packed. In finishing section garment pieces move number of workstations before pieces are packed into the polybag. Common material handling equipment found in the finishing section includes -  Trolleys: Transporting garments from one workstation to another workstation. 

Bench: Used for stacking pressed garments Hangers and stand: Sometimes garments are not folded and shipped in full length in hangers. Pressed garments are hanged on hangers and stored in a stand.  

Quality- Definition The totality of features and characteristics of a product that bear on its ability to satisfy stated or implied needs. Quality can also mean meeting customer`s expectations, while maintaining a cost competitive market position.

Costs of Quality In context to garment industry, quality costs can be divided in to following four areas: Prevention Cost Appraisal Cost Internal Failure Cost External Failure Cost

Prevention Cost Prevention cost includes the cost of planning various quality functions, cost of evaluating prototype samples (whether testing or wear trial or both), cost of writing specification, cost of personnel performing such activities.

Appraisal Cost Appraisal cost includes inspection costs, testing costs, personnel costs associated with inspection and testing. Testing costs would include cost of the samples destroyed in testing, laboratory supplies etc.

Internal Failure Cost Internal Failure cost includes repair cost, scrap cost, cost of re inspection, personnel cost associated with these activities.

External Failure Cost External Failure cost includes cost of returned merchandise, cost of claims, cost of transportation for the defective merchandise and personnel cost associated with these activities.