FACILITY LAYOUT Facility layout means:

Slides:



Advertisements
Similar presentations
Agenda of Week X. Layout Capacity planning Process selection Linebalancing Review of week 9 13 Approaches Purposes : Finishing the capacity planning Understanding.
Advertisements

TOPIC :CAPACITY AND FACILITIES
Process Selection and Facility Layout
Operations Management
9 Layout Strategies PowerPoint presentation to accompany
DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie Cook F O U R T H E D I T I O N Facility Decisions: Layouts © The McGraw-Hill Companies, Inc., 2003.
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
1 IRWIN  a Times Mirror Higher Education Group, Inc. company, 1996 Facilities Layout.
Process Selection and Facility Layout
Facility Layout Facility Layout Facility Layout decisions translate the broader decisions about a firm’s strategy such as competitive priorities, process,
1 Facility Layout. 2 What Is Layout Planning Layout planning is determining the best physical arrangement of resources within a facility Two broad categories.
Facility Layout 1. General Observations Facility Planning includes planning for: (1) the number of facilities and general facility type, (2) facility.
Operations Management
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Layout Strategy. Introduction What – Layout Decisions Where – For efficiency or customer appeal Why – Improve Profitability.
Process Selection and Facility Layout
Process Selection and Facility Layout
Process Selection and Facility Layout
Operations Management Layout Strategy
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Operations Management
Chapter 10 – Facility Layout
Process (Job Shop) Layouts
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection Facilities Layout Line Balancing.
Facility Layout Technical Note 6.
Chapter 10 – Facility Layout
Facility Layout Chapter 10 pages , ,
6-1Process Selection and Facility Layout William J. Stevenson Operations Management 8 th edition.
© Wiley 2007 Chapter 10 Facility Layout. © Wiley 2007 OUTLINE What Is Layout Planning? Types of Layouts Designing Process Layouts Special Cases of Process.
Line Balancing Problem
Mba Facility Layout u Basic layouts u Some layout techniques u Assembly line balancing u Service Layout.
© The McGraw-Hill Companies, Inc., Technical Note 5 Facility Layout.
McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved. 6 Process Selection and Facility Layout.
1 Facility Layout: Manufacturing and Services Manufacturing and Services Chapter 5, Part B.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Reid & Sanders, Operations Management © Wiley 2002 Facility Layout 10 C H A P T E R.
MTSU Facility Layout Arrangement of Manufacturing and Services Processes Arrangement of Manufacturing and Services Processes.
Operations Fall 2015 Bruce Duggan Providence University College.
© The McGraw-Hill Companies, Inc., Technical Note 5 Facility Layout.
Slide 0 of 96 Manufacturing Facility Layout. Slide 1 of 96 Basic Layout Forms Process Product Cellular Fixed position Hybrid.
Chapter 6 Facilities Layout.
Chap 4 - Facility Layout: Manufacturing and Services.
Slide 0 of 96 Chapter 8 Facility Layout: Manufacturing and Services Manufacturing and Services Honey Arora MBA – III.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 6 Process Selection and Facility Layout.
6 Process Selection and Facility Layout. 6-2 Learning Objectives  Explain the strategic importance of process selection.  Describe the basic processing.
Basic Layout Types Product layouts Process layouts
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 8 Facility Layout.
Part 3.
FACILITY LAYOUT & LOCATION PROF. DR. ORHAN TORKUL M. RAŞİT CESUR.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Manufacturing Processes
Facility Layout Chapter 10 pages , ,
Chapter 7: Manufacturing Processes
Chapter 3 MANAGING THE TRANSFORMATION PROCESS
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Cellular Layouts Cellular Production Group Technology
Process Selection and Facility Layout
Facility Layout Chapter 6A.
Process Selection and Facility Layout
Facility Layout Configuration of departments, work centres and equipment, with particular emphasis on movement of work through the system Why Important?
1 Operations Management Layout Strategy. 2 What is Facility Layout Location or arrangement of everything within & around buildings Determines long-run.
Chapter 6A Facility Layout 2.
Facilities Planning and Design Course code:
Process Selection and Facility Layout Lecture 5. Forecasting Product and Service Design Technological Change Capacity Planning Process Selection Facilities.
Operations Management
Process Selection and Facility Layout
Copyright ©2016 Cengage Learning. All Rights Reserved
Presentation transcript:

FACILITY LAYOUT Facility layout means: the configuration of departments, work centers, and equipment, with particular emphasis on the flow patterns of materials and people around, into, and within buildings. Layout decisions are very important because they - Require substantial investments of money and effort - Involve long-term commitments - Have significant impact on cost and efficiency of short-term operations

Characteristics of the Facility Layout Decisions Location of the work centers and departments impacts the flow through the system. The layout can affect productivity and costs generated by the system. Layout alternatives are limited by the amount and type of space required for the various areas the amount and type of space available the operations strategy . . . more

Characteristics of the Facility Layout Decision Layout decisions tend to be: Infrequent Expensive to implement Studied and evaluated extensively Long-term commitments

Basic Layout Forms Process Product Cellular Fixed position Hybrid

Process (Job Shop) Layouts Equipment that perform similar processes are grouped together Used when the operations system must handle a wide variety of products in relatively small volumes (i.e., flexibility is necessary)

Used for Intermittent processing Process Layout Process Layout (functional) Dept. A Dept. B Dept. D Dept. C Dept. F Dept. E Used for Intermittent processing Job Shop or Batch

Characteristics of Process Layouts General-purpose equipment is used Changeover is rapid Material flow is intermittent Material handling equipment is flexible Operators are highly skilled Technical supervision is required Planning, scheduling and controlling functions are challenging Production time is relatively long In-process inventory is relatively high

Product (Assembly Line) Layouts Operations are arranged in the sequence required to make the product Used when the operations system must handle a narrow variety of products in relatively high volumes Operations and personnel are dedicated to producing one or a small number of products

Product Layout Figure 6.4 Raw materials or customer Station 1 Station 2 Station 3 Station 4 Finished item Material and/or labor Material and/or labor Material and/or labor Material and/or labor Used for Repetitive or Continuous Processing

Characteristics of Product Layouts Special-purpose equipment are used Changeover is expensive and lengthy Material flow approaches continuous Material handling equipment is fixed Operators need not be as skilled Little direct supervision is required Planning, scheduling and controlling functions are relatively straight-forward Production time for a unit is relatively short In-process inventory is relatively low

Cellular Manufacturing (CM) Layouts Operations required to produce a particular family (group) of parts are arranged in the sequence required to make that family Used when the operations system must handle a moderate variety of products in moderate volumes

Characteristics of CM Relative to Process Layouts Equipment can be less general-purpose Material handling costs are reduced Training periods for operators are shortened In-process inventory is lower Parts can be made faster and shipped more quickly

Characteristics of CM Relative to a Product Layout Equipment can be less special-purpose Changeovers are simplified Production is easier to automate

Fixed-Position Layouts Product remains in a fixed position, and the personnel, material and equipment come to it Used when the product is very bulky, large, heavy or fragile

Hybrid Layouts Actually, most manufacturing facilities use a combination of layout types. An example of a hybrid layout is where departments are arranged according to the types of processes but the products flow through on a product layout.

New Trends in Manufacturing Layouts Designed for quality and flexibility Ability to quickly shift to different product models or to different production rates Cellular layout within larger process layouts Automated material handling such as automated guided vehicle systems (AGVs)and automated storage and retrieval sytems (AS/RS) U-shaped production lines have potential to improve employee morale More open work areas with fewer walls, partitions, or other obstacles Smaller and more compact factory layouts Less space provided for storage of inventories throughout the layout

A U-Shaped Production Line 1 2 3 4 5 6 7 8 9 10 In Out Workers

Designing and Analyzing a Product Layout Line Balancing Problem Characteristics Inputs Design Procedure How Good Is The Layout?

Line Balancing Problem Work stations are arranged so that the output of one is an input to the next, i.e., a series connection Layout design involves assigning one or more of the tasks required to make a product to work stations . . . more

Line Balancing Problem The objective is to assign tasks to minimize the workers’ idle time, therefore idle time costs, and meet the required production rate for the line In a perfectly balanced line, all workers would complete their assigned tasks at the same time (assuming they start their work simultaneously) This would result in no idle time . . . more

Line Balancing Problem Unfortunately there are a number of conditions that prevent the achievement of a perfectly balanced line The estimated times for tasks The precedence relationships for the tasks The combinatorial nature of the problem

Inputs The production rate required from the product layout or the cycle time. Cycle time is the maximum time allowed at each workstation to complete its set of tasks on a unit. The cycle time is the reciprocal of the production rate and visa versa. All of the tasks required to make the product It is assumed that these tasks can not be divided further . . . more

Inputs The estimated time to do each task The precedence relationships between the tasks These relationships are determined by the technical constraints imposed by the product These relationships are displayed as a network known as a precedence diagram

a b c d e Precedence Diagram Precedence diagram: Tool used in line balancing to display elemental tasks and sequence requirements A Simple Precedence Diagram a b c d e 0.1 min. 0.7 min. 1.0 min. 0.5 min. 0.2 min.

Line Balancing Procedure Determine which tasks must be performed to complete one unit of a product Draw a precedence diagram which shows the sequence in which the tasks must be performed. Estimate task times 4 Calculate the cycle time for the line. Remember the cycle time is the reciprocal of the production rate. Make sure the cycle time is expressed in the same time units as the estimated task times. . . . more

Line Balancing Procedure Calculate the minimum number of workstations that can provide the required production rate. Cycle Time=Productive Time per hour / Demand per hour min # of workstations = Sum of all task times / Cycle Time 6. Use a line-balancing heuristic such as longest-task-time heuristic to assign tasks to workstations so that the production line is balanced.

Design Procedure 7. Open a new workstation with the full cycle time remaining. 8. Determine which tasks are feasible, i.e., can be assigned to this work station at this time. For a task to be feasible, two conditions must be met: All tasks that precede that task must have already been assigned The estimated task time must be less than or equal to the remaining cycle time for that work station.

Design Procedure Note that if there is only one feasible task, assign it to the work station. If there is more than one feasible task, use the heuristic (step 6) to determine which task to assign. Reduce the work station’s remaining cycle time by the selected task’s time. If there are no feasible tasks and assignments to that work station are complete, go back to step 7 (or stop, if all tasks have been assigned).

Longest-Task-Time Heuristic Heuristic methods, based on simple rules, have been used to develop very good, not optimal, solutions to line balancing problems. Longest-Task-Time Heuristic - adds tasks to a workstation one at a time in the order of task precedence, choosing - when a choice must be made - the task with the longest time.

How Good Is the Design? Balance Efficiency is

Example 1: The ALB Problem You’ve just been assigned the job a setting up an electric fan assembly line with the following tasks: 17

Example 1: The ALB Problem The Precedence Diagram Which process step defines the maximum rate of production? A C B D E F G H 2 3.25 1 1.2 .5 1.4 17

Example 1: The ALB Problem We want to assemble 100 fans per day What do these numbers represent? 19

Example 1: The ALB Problem We want to assemble 100 fans per day Why should we always round up? 19

Example 1: The ALB Problem Selected Task Selection Rules Primary: Assign tasks according to the largest number of following tasks. Secondary (tie-breaking): Assign tasks in order of the longest operating time 21

Example 1: The ALB Problem Selected Task Selection Rules Precedence Diagram A C B D E F G H 2 3.25 1 1.2 .5 1.4 21

Station 1 Station 2 Station 3 Slide 37 of 96 Task Followers Time (Min) C 4 3.25 D 3 1.2 B 1 E 0.5 F G H 1.4 A C B D E F G H 2 3.25 1 1.2 .5 1.4 Station 1 Station 2 Station 3 Slide 37 of 96 23

Station 1 Station 2 Station 3 A (4.2-2=2.2) Slide 38 of 96 Task Followers Time (Min) A 6 2 C 4 3.25 D 3 1.2 B 1 E 0.5 F G H 1.4 A C B D E F G H 2 3.25 1 1.2 .5 1.4 Station 1 Station 2 Station 3 A (4.2-2=2.2) Slide 38 of 96 23

Station 1 Station 2 Station 3 A (4.2-2=2.2) B (2.2-1=1.2) Task Followers Time (Min) A 6 2 C 4 3.25 D 3 1.2 B 1 E 0.5 F G H 1.4 A C B D E F G H 2 3.25 1 1.2 .5 1.4 Station 1 Station 2 Station 3 A (4.2-2=2.2) B (2.2-1=1.2) Slide 39 of 96 23

Station 1 Station 2 Station 3 A (4.2-2=2.2) B (2.2-1=1.2) Task Followers Time (Min) A 6 2 C 4 3.25 D 3 1.2 B 1 E 0.5 F G H 1.4 A C B D E F G H 2 3.25 1 1.2 .5 1.4 Station 1 Station 2 Station 3 A (4.2-2=2.2) B (2.2-1=1.2) G (1.2-1= .2) Idle= .2 Slide 40 of 96 23

Station 1 Station 2 Station 3 A (4.2-2=2.2) B (2.2-1=1.2) Task Followers Time (Min) A 6 2 C 4 3.25 D 3 1.2 B 1 E 0.5 F G H 1.4 A C B D E F G H 2 3.25 1 1.2 .5 1.4 Station 1 Station 2 Station 3 A (4.2-2=2.2) B (2.2-1=1.2) G (1.2-1= .2) Idle= .2 Slide 41 of 96 23

Station 1 Station 2 Station 3 A (4.2-2=2.2) B (2.2-1=1.2) Task Followers Time (Min) A 6 2 C 4 3.25 D 3 1.2 B 1 E 0.5 F G H 1.4 A C B D E F G H 2 3.25 1 1.2 .5 1.4 Station 1 Station 2 Station 3 A (4.2-2=2.2) B (2.2-1=1.2) G (1.2-1= .2) Idle= .2 C (4.2-3.25)=.95 Idle = .95 Slide 42 of 96 23

Station 1 Station 2 Station 3 A (4.2-2=2.2) B (2.2-1=1.2) Task Followers Time (Min) A 6 2 C 4 3.25 D 3 1.2 B 1 E 0.5 F G H 1.4 A C B D E F G H 2 3.25 1 1.2 .5 1.4 Station 1 Station 2 Station 3 A (4.2-2=2.2) B (2.2-1=1.2) G (1.2-1= .2) Idle= .2 C (4.2-3.25)=.95 Idle = .95 D (4.2-1.2)=3 Slide 43 of 96 23

Station 1 Station 2 Station 3 A (4.2-2=2.2) B (2.2-1=1.2) Task Followers Time (Min) A 6 2 C 4 3.25 D 3 1.2 B 1 E 0.5 F G H 1.4 A C B D E F G H 2 3.25 1 1.2 .5 1.4 Station 1 Station 2 Station 3 A (4.2-2=2.2) B (2.2-1=1.2) G (1.2-1= .2) Idle= .2 C (4.2-3.25)=.95 Idle = .95 D (4.2-1.2)=3 Slide 44 of 96 23

Station 1 Station 2 Station 3 A (4.2-2=2.2) B (2.2-1=1.2) Task Followers Time (Min) A 6 2 C 4 3.25 D 3 1.2 B 1 E 0.5 F G H 1.4 A C B D E F G H 2 3.25 1 1.2 .5 1.4 Station 1 Station 2 Station 3 A (4.2-2=2.2) B (2.2-1=1.2) G (1.2-1= .2) Idle= .2 C (4.2-3.25)=.95 Idle = .95 D (4.2-1.2)=3 E (3-.5)=2.5 Slide 45 of 96 23

Station 1 Station 2 Station 3 A (4.2-2=2.2) B (2.2-1=1.2) Task Followers Time (Min) A 6 2 C 4 3.25 D 3 1.2 B 1 E 0.5 F G H 1.4 A C B D E F G H 2 3.25 1 1.2 .5 1.4 Station 1 Station 2 Station 3 A (4.2-2=2.2) B (2.2-1=1.2) G (1.2-1= .2) Idle= .2 C (4.2-3.25)=.95 Idle = .95 D (4.2-1.2)=3 E (3-.5)=2.5 F (2.5-1)=1.5 Slide 46 of 96 23

Station 1 Station 2 Station 3 D (4.2-1.2)=3 E (3-.5)=2.5 F (2.5-1)=1.5 Task Followers Time (Min) A 6 2 C 4 3.25 D 3 1.2 B 1 E 0.5 F G H 1.4 A C B D E F G H 2 3.25 1 1.2 .5 1.4 Station 1 Station 2 Station 3 D (4.2-1.2)=3 E (3-.5)=2.5 F (2.5-1)=1.5 H (1.5-1.4)=.1 C (4.2-3.25)=.95 A (4.2-2=2.2) B (2.2-1=1.2) G (1.2-1= .2) Idle=.2 Idle=.95 Idle=.1 Slide 47 of 96 23

Example 1: The ALB Problem Which station is the bottleneck? What is the effective cycle time?