Architecture Selection Logic

Slides:



Advertisements
Similar presentations
AAE450 Spring 2009 Reliability Analysis Solomon Westerman, PM Week 5, 2/12/09 [Solomon Westerman] [PM] 1.
Advertisements

1 of 27 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall · Economics · R. Glenn Hubbard, Anthony Patrick O’Brien, 3e. Chapter 12: Monopolistic.
THE FOUR STEPS of Effective Energy Management Donald R. Wulfinghoff, P.E. Wulfinghoff Energy Services, Inc. Wheaton, Maryland USA 301 – 946 – 1196
AAE450 Spring 2009 Time to Complete 50m/s ΔV & 100g Payload System Overview Brittany Waletzko 100g Payload Integration Manager Translunar/OTV Phase Week.
AAE450 Spring 2009 Cost Analysis, Redux Solomon Westerman Week9: 3/12/09 [Solomon Westerman][PM]Page 1/3.
AAE450 Spring 2009 Week 4 Project Timeline [Solomon Westerman] [PM]
Spacecraft Design and Sizing Dr Andrew Ketsdever MAE 5595 Lesson 14.
New Product Development In general, 80-94% of new products fail. Even in a large cereal company that invests a great deal in R&D, 40% of their products.
Presenter: Joseph Reid Paper: The Market for Health Care Date : 6/04/07.
McGraw-Hill© 2000 The McGraw-Hill Companies 1 S M S M McGraw-Hill © 2000 The McGraw-Hill Companies Chapter 17 THE FINANCIAL AND ECONOMIC IMPACT OF SERVICE.
Product Lifecycle (PLC) By the end of today you should understand: The underlying basis for the PLC The nature of customers and competitors at various.
Game of Life. Making the right choice  Before you begin decide how much you can afford to spend  Decide which car models and options interest you 
Why Bad Things Happen to Good Marketers Ken Wong Queen’s School of Business.
WF Sports & Entertainment Marketing II 3.03B
Definition of Concurrent Engineering "Concurrent engineering is a systematic approach to the integrated, concurrent design of products and their related.
Current Need Aging space shuttle fleet’s retirement is imminent If the ISS is going to continue operation there needs to be a replacement to get humans.
100% of B-TOS architectures have cost increase under restrictive launch policy for a minimum cost decision maker Space Systems, Policy, and Architecture.
Space Engineering 2 © Dr. X Wu, Space Engineering 2 Lecture 1.
IGCSE®/O Level Economics
Unit 4 Accounting and Finance GCE A2 Business Studies.
M Global Software Group 1 Motorola Internal Use Only Better Software Quality at a Lower Cost: Testing to Eliminate Software Black Holes Isaac (Haim) Levendel,
Structural & Multidisciplinary Optimization Group Deciding How Conservative A Designer Should Be: Simulating Future Tests and Redesign Nathaniel Price.
SmallSat Ground Systems, a C2 to RF Integrated Approach.
The Multiplier Effect When firms put more money into investment spending, income levels rise. When income levels rise, consumer spending increases which.
BASICACCOUNTINGBASICACCOUNTING. DEFINITION OF ACCOUNTING.
Asset Integrity & Reliability Management A Strategic Perspective Andreas de Vries Doha, 15 – 18 May 2016.
What Is Cost Control? 1 Controlling Foodservice Costs OH 1-1.
Spending, Saving, and Investing
The impact on a business of higher interest rates
Support Vector Machine
APRIA 2014 Annual Conference
Unit 4 Accounting and Finance
The horizontal boundaries of a firm
What is Supply? Economics Ch. 5 Section 1.
Possible Accomodation in Existing Regulations and Uncovered Areas
Business Economics (ECO 341) Fall Semester, 2012
Intermodal Transport And The Trucking Industry: Getting Goods Across Land And Water
Introduction to Saving
Choose to Save Advanced Level.
Choose to Save Advanced Level.
The Fundamentals of Investing
TEMPO’s Commercially Hosted Payload Concept
VENDORS, CONSULTANTS AND USERS
Price strategy: Pricing Methods
Utility Maximization Ch7
Choose to Save Advanced Level.
PF 8.01 (Savings & Investing)
السيولة والربحية أدوات الرقابة المالية الوظيفة المالية
Implement expense-control strategies
Utility Functions, Budget Lines and Consumer Demand
How effectively are we managing our energy costs today
Solomon Westerman, PM “Polished” Final Slide Layout Week 13.
Chapter 9 – Software Evolution and Maintenance
[Solomon Westerman] [PM]
[Solomon Westerman] [PM]
Choose to Save Advanced Level.
Solomon Westerman Week3 1/29/09
Politics and “Wiggle Words”
Choose to Save Advanced Level.
Knowing When to Stop: An Examination of Methods to Minimize the False Negative Risk of Automated Abort Triggers RAM XI Training Summit October 2018 Patrick.
Why are we here? Why are we here together? Why did our companies invest the time and money to have us go through this process? (Take responses and put.
[Solomon Westerman] [PM]
Decision Criteria Used In Assessing Alternatives
Choose to Save Advanced Level.
Choose to Save Advanced Level.
Economic Analysis, A Primer
Choose to Save Advanced Level.
Integrated Risk Management
How to Create a Budget.
Probability Grade 12 Essential Math
Presentation transcript:

Architecture Selection Logic Solomon Westerman, PM Week 7, 2/26/09 [Solomon Westerman] [PM] 1

[Solomon Westerman] [PM] 2 Complexity Complexity drives cost and reliability! Cost Reliability Launch Mass in LEO Purchase Licenses Components Salary Integration R&D Construction Launch Same model TLI, LD, LOCO Moving Parts Failure Modes Purchased or Built Components $ Spent on R&D Improve our reliability! Balance total cost and system reliability to meet requirements for each payload mass [Solomon Westerman] [PM] 2

Architecture Logic for GLXP size Payloads Want to minimize mission cost (maximize profit) Cost currently driving selection Unless significant $ spend on R&D, mission reliability is unlikely to be > 90% R&D cost + mission cost will likely be more than purse money for > 90% reliability Even the most reliable GEO satellite buses have ~11% of fleet with insurance claims, most have ~25% Therefore, we could plan for two launches Allows us to invest less in R&D 90% reliability for two missions is equal to 69% reliability for one mission Cross our fingers and hope the first mission works If first mission works: we make good profit If first mission fails: fix, build, and launch again to minimize loss Second launch may not win full GLXP prize money due to time constraint Locomotion reliability a HUGE driver Working with slim margin if we don’t pour too much money into LD R&D Combination of phase vehicles is very promising, even for small payloads Need to look at model to see if we can get > 90% with one launch Reduced complexity not only leads to lower cost, but increased reliability! [Solomon Westerman] [PM] 3

Architecture Logic for Arbitrary (large) Payload Want to minimize mission cost with acceptable reliability Payload likely to be expensive, desire higher reliability than GLXP Reliability requirement currently driving selection Require 90% reliability for ONE mission! R&D cost will be needed to satisfy reliability Significant R&D cost must be put into TLI, LD, and LOCO R&D cost can be reduced by launching with Soyuz FG (excellent reliability at ~1.7x higher launch cost) Combination of phase vehicles increases reliability SIGNIFICANTLY Integrated hopper/lander is almost required to maintain reliability requirement Less costly mission [Solomon Westerman] [PM] 4

Demo Excel Model