Bubble Chamber Planning Meeting

Slides:



Advertisements
Similar presentations
EAR2 simulation update Collaboration board meeting Christina Weiss & Vasilis Vlachoudis.
Advertisements

Joanne Beebe-Wang 7/27/11 1 SR in eRHIC IR Synchrotron Radiation in eRHIC IR and Detector Background Joanne Beebe-Wang Brookhaven National Laboratory 10/
Simulations with ‘Realistic’ Photon Spectra Mike Jenkins Lancaster University and The Cockcroft Institute.
M. Sullivan Mini-workshop on the MEIC design Nov 2, 2012.
Titel des Kapitels: ITC Franklin Gothic LT, Bold, 11 Punkt, weiß MLS (Metrology Light Source) and the Willy-Wien-Laboratory – Status Report Ralph Lange.
Pair Spectrometer Design Optimization Pair Spectrometer Design Optimization A. Somov, Jefferson Lab GlueX Collaboration Meeting September
Hall D Photon Beam Simulation and Rates Part 1: photon beam line Part 2: tagger Richard Jones, University of Connecticut Hall D Beam Line and Tagger Review.
Status of the Tagger Hall Background Simulation Simulation A. Somov, Jefferson Lab Hall-D Collaboration Meeting, University of Regina September
James Welch October 30, FEL Commissioning Plans J. Welch, et. al. FEL Commissioning Plans J. Welch, et. al. Accelerator.
PROBLEM: Radiation Dose Rate in IR2 When IR1 is Operating (and Vice Versa) Muon Dose Rate > 1 mRem/hr for 0.1% Collimated Halo.
G2p Safety Readiness Review January 17, 2012 Expected Radiation Exposure Levels from Activated Local Dump George Kharashvili, Radiation Control.
 *(1520) CrossSection Zhiwen Zhao Physics 745. Λ BARYONS (S = − 1, I = 0) Λ 0 = u d s Λ(1520) D 03 I( J P ) = 0( 3/2 − ) Mass m = ± 1.0 MeV [a]
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
Bubble Chamber Planning Meeting 04 September
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
Bubble Chamber Experimental Readiness Review September.
Design of the Photon Collimators for the ILC Positron Helical Undulator Adriana Bungau The University of Manchester Positron Source Meeting, July 2008.
05/30/08J. Dunne -- SANE Collaboration Meeting 1 Beamline Status Upstream beamline –Chicane –SEM –Rasters –Girder Downstream beamline –Helium bag –Extension.
Bubble Chamber Installation Kick-Off Meeting May 28, 2014, Grames Let’s discuss two jobs between the cryounit and injector gate. Bubble chamber (5D) New.
Status of the Beamline Simulation A.Somov Jefferson Lab Collaboration Meeting, May 11, 2010.
NEW COMMENTS TO ILC BEAM ENERGY MEASUREMENTS BASED ON SYNCHROTRON RADIATION FROM MAGNETIC SPECTROMETER E.Syresin, B. Zalikhanov-DLNP, JINR R. Makarov-MSU.
Question and Answer 1) A weighted Monte-Carlo ray trace of particles exiting the target/magnet assembly for all primary beam energies showing: a) Where.
AWAKE Electron Spectrometer Simon Jolly, Lawrence Deacon, Matthew Wing 28 th January 2015.
Radiation Monitoring at the Undulator System Heinz-Dieter Nuhn – LCLS Undulator Group Leader Presented at Wednesday, March 7, 2012.
Introduction to Bubble Chamber: Ops Training September.
Bubble Chamber: Experimental Overview August 18, 2015.
Synchrotron radiation at eRHIC Yichao Jing, Oleg Chubar, Vladimir N. Litvinenko.
Dec 2004 Simulation of Low Energy backgrounds in the ILC IR Impact on feedback BPMs FONT collaboration  QMUL: P Burrows, G Christian, C Clarke, G White,
Energy determination at BEPC-II  Satellite Meeting «On the Need for a super-tau-charm factory» September 26 – 27, 2008, BINP, Novosibirsk, Russia M.N.
BES-III Workshop Oct.2001,Beijing The BESIII Luminosity Monitor High Energy Physics Group Dept. of Modern Physics,USTC P.O.Box 4 Hefei,
EIC Compton detector update October 24 th 2014 Alexandre Camsonne.
SLAC, September 25, 2009 Searching for a U -boson with a positron beam Bogdan Wojtsekhowski Thomas Jefferson National Accelerator Facility  The light.
Dec 2004 Low Energy backgrounds in the TESLA IR Impact on feedback BPMs FONT collaboration  QMUL: P Burrows, G Christian, C Clarke, G White, S Molloy.
Dec 2004 Simulation of Low Energy backgrounds in the TESLA IR Impact on feedback BPMs FONT collaboration  QMUL: P Burrows, G Christian, C Clarke, G White,
Jan. 18, 2008 Hall C Meeting L. Yuan/Hampton U.. Outline HKS experimental goals HKS experimental setup Issues on spectrometer system calibration Calibration.
CERF Benchmark Study of Radionuclide Production with FLUKA M. Brugger on behalf of the CERN-SLAC RP Collaboration.
Bubble Chamber Planning Meeting 07 August
Error Analysis 04 September Penfold-Leiss Cross Section Unfolding Measure Yields at: where, The solution can be written in two forms: 2.
Electron Spectrometer: Status July 14 Simon Jolly, Lawrence Deacon 1 st July 2014.
Shielding review for temporary spectrometer for RUBICON experiment, ATF beamline #2 K. Kusche, M. Fedurin RSC meeting, Jan 20, 2015.
Estimates of required MPS reaction time In the merger (at the centers of respective 20deg dipoles and in between 2 lenses) rms R=250 um In the
Ma zhongjian Ding yadong Wang qingbin Wu qingbiao Radiation Protection Group/IHEP.
E.B. Holzer BLM Meeting: Q & A March 20, Questions and Answers.
Bubble Chamber: Status and Test September 1, 2015.
Heating and radiological
Bubble Chamber Schedule – 2017
Status of the MAX IV Short Pulse Facility
Test of Optical Stochastic Cooling in CESR
Electron Beamlines Safety Workshop at ELI Beamlines April 2016
Polarized WACS Experiment (E ) Using Compact Photon Source (CPS)
How to detect protons from exclusive processes
Estimation and Protection on Synchrotron Radiation in CEPC Main Ring
Revised Commissioning Strategy
Free Electron Lasers (FEL’s)
Upgraded Injector Test Facility
Bubble Chamber Summer 2015 Installation and Beam Test Schedule
Introduction to Bubble Chamber: Ops Training
Bubble Chamber – Beam Requirements
MLS (Metrology Light Source) and the Willy-Wien-Laboratory – Status Report Ralph Lange (BESSY) Titel des Kapitels: ITC Franklin Gothic LT, Bold, 11 Punkt,
Upgraded Injector Test Facility
Bubble Chamber Readiness Review
CMS Masterclass 2017.
Riad Suleiman February 2, 2017
Higgs Factory Backgrounds
GEANT Simulations and Track Reconstruction
Bubble Chamber Experiments at UITF
Installation and Beam Test Schedule
Upgraded Injector Test Facility
Maximum Credible Beam Event Paul Emma et al
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Presentation transcript:

Bubble Chamber Planning Meeting 24 July 2013

Agenda Schedule Design of beamline, radiator and dump Bubble Chamber work at Argonne Simulation and Background Absolute beam energy Safety

12C(α, γ)16O S-Factor Statistical Error: dominated by background subtraction from 18O(γ,α)14C (depletion = 5,000) Systematic Error: dominated by absolute beam energy (= 0.2%) SE1(300 keV) = 74±21 keV b

Schedule 12GeV CEBAF Commissioning: Bubble Chamber Activities: Install beamline, radiator and dump Commission beamline, radiator and dump Install Bubble Chamber Commission Bubble Chamber Physics run Start End Period I 2013-11-04 2013-12-20 SAD I 2014-01-02 2014-02-05 Period II 2014-05-07 SAD II 2014-09-22 Period III 2014-12-19 SAD III 2015-01-02 2015-02-13 Period IV 2015-06-12

Design of beamline, Radiator & Dump Need to design new beamline to replace PEPPo beamline and increase the distance between the two BPMs Radiator: 0.02 mm and 0.1 mm Copper Electron Dump: 2kW dump (10 MeV, 200 µA) Photon Dump

Electron Beam 3.0 – 8.5 MeV (K.E.) 0.01 – 100 µA Al Photon Dump 10 cm long 20 cm diameter Sweep Magnet Cu Vacuum Window 10 mil Cu Radiator 0.02 mm Cu Photon Collimator 50 cm 50 cm Cu Inner Pipe Al Beam Pipe Bubble Chamber Superheated N2O 3 cm long 15°C, 60 atm Cu Electron Dump

BCM 5 MeV Spectrometer 5 MeV Dipole 27’’ PEPPo/Bubble Chamber Beamline Bubble Chamber location

Simulation Two programs: GEANT4 FLUKA Both use models that calculate wrong cross sections. Both do not allow for user’s cross sections. Suggestion: Use GEANT4 and FLUKA to produce the photon spectrum impinging on the super heated liquid. Fold the above photon spectrum with our cross sections in stand-alone codes. Both GEANT4 and FLUKA are good in neutron tracking. Still need to check the neutron cross sections.

Background Must measure: Rates: Natural Abundance: 17O: 0.038% 17O(γ,α)13C , enrichment=10% 18O(γ,α)14C , enrichment=10% Rates: 17O(γ,α)13C, depletion=5,000 18O(γ,α)14C, depletion=5,000 14N(γ,p)13C, detection eff.= 10-8 Natural Abundance: 17O: 0.038% 18O: 0.205% Still need to study 17O(γ,n)16O, …

Safety High pressure system Super heated liquid: N2O or CO2 Buffer liquid: Mercury

Running in FEL? Absolute Beam Energy: FEL can measure the energy with a precision of 0.4%. However, it could be very hard to improve (?) Required Systems: Personnel Safety System (PSS) Liquid helium and RF Gun Laser Staff

Planning Meeting Do we want to meet every two weeks? Wednesday 3:00 – 5:00 pm?