SUPPLIER PARTNERSHIP 2.

Slides:



Advertisements
Similar presentations
Module N° 4 – ICAO SSP framework
Advertisements

SUPPLIER PARTNERSHIP An efficient SCM , built on strong partnerships will create high levels of people satisfaction and customer satisfaction. Ensuring.
ISO 9001 : 2000.
EPSON STAMPING ISO REV 1 2/10/2000.
©2006 OLC 1 Process Management: The Foundation for Achieving Organizational Excellence Process Management Implementation Worldwide.
Besterfield: Quality Control, 8 th ed..© 2009 Pearson Education, Upper Saddle River, NJ All rights reserved Supplier Partnership By Engr Mian Khurram.
The ISO 9002 Quality Assurance Management System
Quality Management Systems ISO 9000
Supplier Partnership Presented by Dr. Joan Burtner Certified Quality Engineer Associate Professor of Industrial Engineering and Industrial Management Mercer.
Management 11e John Schermerhorn
IE673Session 9 - Supply Management1 Supply Management.
The ISO 9000 family of standards
THE PRINCIPLES OF QUALITY MANAGEMENT. DEFINING QUALITY Good Appearance? High Price? The Best? Particular Specification? Not necessarily, but always: Fitness.
Guiding principles for the Federal acquisition system
SUPPLIER PARTNERSHIP An organization (or customer) purchases its requirements, raw materials, components, and services, from supplier.   Better supplier’s.
Eng R. L. Nkumbwa-2010 Copperbelt University 1 ISO Quality Management Systems.
Good Pharmacy Practice- GPP Part 7. Quality Management
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
ISO 9000 and Public Awareness and Information Session 22 February 2006 Owen Glave, MBA-TQM.
Operations Management Class 20 Tuesday 11/8/11. Operations Management (OM) The development and administration of the activities involved in transforming.
CHAPTER 3 CREATING & MANAGING SUPPLIER RELATIONSHIPS
Logistics and supply chain strategy planning
Quality Management.  Quality management is becoming increasingly important to the leadership and management of all organisations. I  t is necessary.
Introduction to Management
Supply Chain Doctors SCM Fundamentals Introduction Planning Sourcing Making Warehousing Transporting Sharpening the Saw.
IRIS - International Railway Industry Standard The Quality Standard for the Railway Industry ACRI Prague, 2nd April 2008 Angela de Heymer Manager Quality.
CHAPTER 4: Procurement.
1 Implementing a Business Management System compliant to ISO 9001:2000.
AET0012PPT by Dr. Anwar El-Tawil Dr. Anwar El-Tawil Director ISO Programme for Developing Countries QUALITY MANAGEMENT SYSTEM ACCORDING TO.
Chapter 2 The Character of Business Marketing.
Unit-5 Introduction to IS/ISO 9004:2000 – quality management systems – guidelines for performance improvements. Presented by N.Vigneshwari.
ISO 9001:2000 THE BASICS By The Business Management Systems Department ISO 9000 Essentials.
Supplier Partnership Presented by Dr. Joan Burtner Certified Quality Engineer Associate Professor of Industrial Engineering and Industrial Management Mercer.
Chapter 3: Purchasing Research and Planning Strategic Planning for Purchasing Strategic planning for purchasing involves the identification of critical.
Improving performance, reducing risk Dr Apostolos Noulis, Lead Assessor, Business Development Mgr Thessaloniki, 02 June 2014 ISO Energy Management.
Ndungu Muchemi Cynthia Wacera Benson Maina Faith Wakahia Sarah Masila Ruth Munyinyi Michelle Achieng O71037 Yvonne.
CEM515QUALITYASSURANCECEM515QUALITYASSURANCE SUPPLIER PARTNERSHIP.
ISO 9001: 2015 BUSINESS PROCESS IMPLEMENTATION GENERAL AWARENESS
A LOOK AT AMENDMENTS TO ISO/IEC (1999) Presented at NCSLI Conference Washington DC August 11, 2005 by Roxanne Robinson.
Basic Principles of Good Management
WRTVC INTERNATIONAL GUIDELINES Requirements for
Chapter 1 Introduction to Cost Management
Core Competencies Training for Supervisors
Core Competencies Training for Supervisors
SUPPLIER PARTNERSHIP An organization (or customer) purchases its requirements, raw materials, components, and services, from supplier.   Better supplier’s.
Integrated Management System and Certification
PURCHASING AND SUPPLY MANAGEMENT
Quality Management Systems
Eight principles of quality management.
Supplier Partnership Supplier Partnership is the discipline the strategically planning for, and managing, all interactions with third party organization.
INTRODUCTION TO ISO 9001:2015 FOR IMPLEMENTATION Varinder Kumar CISA, ISO27001 LA, ISO 9001 LA, ITIL, CEH, MEPGP IT, Certificate course in PII & Privacy.
GEOP 4355 Supply Networks: Supplier management
QUALITY MANAGEMENT Chapter 7 INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (iso 9000) Dr. Rosmaini Tasmin Faculty of Technology Management and Business.
Internet Interconnection
Managing Supplier Quality
CREATING AND MANAGING SUPPLIER RELATIONSHIPS
Agenda Who are we? 1 Introductions Journey so far 2
QUALITY MANAGEMENT SYSTEM
The Organizational Context
MARKETING, PURCHASING AND PRODUCTION (7 - 9%)
Outsourcing: Managing Interorganizational Relations
TS Training Presented by: Internal Auditor Training.
PRE-QUALIFIED AND PREFERRED SUPPLIER PROGRAM
TS
Chapter 7 Process Management.
Quality Management MNGT 420
TS
TS
SADC PPP Network PPPs in SADC
Presentation transcript:

SUPPLIER PARTNERSHIP 2

TOPICS OF TODAYS DISCUSSION INTRODUCTION PARTNERING Long-term commitment Trust Shared Vision SOURCING SUPPLIER SELECTION PRINCIPLES OF CUSTOMER/SUPPLIER RELATIONS SUPPLIER CERTIFICATION SUPPLIER RATING RELATIONSHIP DEVELOPMENT Inspection Training Team Approach Recognition and Award 2

INTRODUCTION Organization and suppliers have the same goal – to satisfy the end user. Working with supplier in a partnering atmosphere will yield high quality product and services. In the 1980s procurement decisions were based on price, awarding contracts to the lowest bidder, sacrificing the quality and timely delivery Deming suggested that long term relationship of loyalty and trust should be developed with the supplier to ensure improved products & services. Just-in-Time (JIT) concept calls for raw materials and components to be delivered in small quantities only when they are required and not before. 2

PARTNERING Partnering is a long-term commitment between two or more organizations for the purpose of achieving specific business goals & objectives. The relationship is based upon trust, dedication to common goals and objectives. Benefits include: Improved Quality, Increased efficiency, Lower cost, Increased opportunity for innovation, & Continuous improvement of products and services The three key elements of partnering are: Long-term commitment. Trust. Shared vision. 3

Long-term commitment Long-term commitment provides the needed environment for both parties to work toward continuous improvement. Total organization involvement is necessary, CEO to the workers. Each party contributes its unique strengths to the process. A supplier may only take risks in a long-term commitment. Dependency appears as a national consequence in a long term commitment, it is not a sign of weakness, but a sign of strength of the relationship and is necessary for competitive advantage. 3

Trust The strength of Partnering is based on fairness and parity. Trust enables the resources and knowledge of each partner to be combined to eliminate an adversarial relationship. Mutual trust forms the basis for a strong working relationship. Open and frequent communication avoids misdirection, disputes and strengthens the relationship. The parties may share or integrate resources such as training activities, administrative systems and equipment. 3

Shared Vision Each of the partnering organizations must understand the need to satisfy the final customer. There should be an open and candid exchange of needs and expectations. Shared objectives and goals ensure a common direction aligned with each parties’ mission. Partners must understand each other’s business so that equitable decisions are made. These decisions must be formulated and implemented as a team. 3

SOURCING There are three types of sourcing: Sole sourcing Organization is forced to use only one supplier. Technical specifications, patents, raw material location, etc. cause this kind of sourcing. Partnering is a natural consequence, to benefit the end user. Multiple sourcing Two or more suppliers for an item are used. Competition will result in better quality, lower costs and better service. It eliminates disruption of supply due to strikes etc. 3

SOURCING cont’d... Single sourcing A planned decision by the organization to select one supplier for an item when several sources are available. Advantages for the organizations include reduced cost, complete accountability, supplier loyalty, partnering and a better end product with less variability. Advantages for the supplier include new business from the customer, reduced cost of the business and production processes. It has allowed organization to reduce their supplier base. 3

SUPPLIER SELECTION Following are the conditions for the selection and evaluation of suppliers: Supplier knows management policy of the organization. Stable management system of supplier , respected by others. Supplier has the capability of dealing with technological innovations. Supplier can supply material meeting quality specifications. Supplier has capability to meet the amount of production. Supplier can breach corporate secrets. 3

SUPPLIER SELECTION cont’d…. The supplier is easily accessible in terms of transpiration and communication. The supplier is sincere in implementing the contract provisions. The supplier has an effective quality system and improvement program. The supplier has a track record of customer satisfaction and organization credibility. These conditions go beyond evaluating a supplier on the basis of quality, price and delivery.

PRINCIPLES OF CUSTOMER/SUPPLIER RELATIONS Dr. Kaoru Ishikawa has suggested ten principles: Customer and supplier are fully responsible for Quality control. Customer and supplier should respect each others independence. Supplier is entitled to complete information from the customer. Non-adversarial contract between customer and supplier is needed for quality, quantity, price, delivery method & payments. Supplier should provide quality to meet customers satisfaction.

PRINCIPLES OF CUSTOMER/SUPPLIER RELATIONS Product quality evaluation methods should be decided by the mutual consent of both the parties. Amicable settlement of disputes between customer and supplier should be established in the contract. Continuous information exchange will improve the product or service quality. To maintain an amicable relationship, both the parties should do procurement, production, and inventory planning. Best interest of the end user should be considered while doing business transactions.

SUPPLIER CERTIFICATION ASQC has developed the following certification criteria: Customer and supplier shall have agreed on specifications which are mutually developed, justifiable, and not ambiguous. Supplier shall have no product-related lot rejection for a significant period of time. Supplier shall have no non-product related rejections for a stated period of time. Supplier shall have no negative non-product related incidents for a stated period of time. Supplier shall have a fully documented quality system. (ISO 9000)

SUPPLIER CERTIFICATION Supplier shall have successfully passed an on-site system evaluation. Supplier must make inspections and tests. (Laboratory results & SPC are used) Supplier shall have the ability to timely provide inspection and test data. Occasionally it may be necessary to decertify a supplier as a result of a major problem. Benefits of certification include customer/supplier partnership, direct shipment to stock and reduction of supplier numbers to a manageable level.

SUPPLIER RATING Supplier rating system is based on quality, delivery and other added services. The objectives of a rating system are: To obtain an overall rating of supplier performance. To ensure communication with suppliers in the areas of quality, service, delivery and other desired measures. To provide supplier with a detailed and factual record of problems for corrective action. To enhance the relationship between the customer and the supplier.

RELATIONSHIP DEVELOPMENT All the previously discussed issues contribute to the development of the relationship. It includes: Inspection The goal is to eliminate or automate the inspection process. It has four phases: 100% inspection, Sampling, Audit, and Identity check.

RELATIONSHIP DEVELOPMENT Training All personnel should receive quality awareness and problem solving, technical and safety training. Team approach Customer/supplier teams are established in areas such as product design, process design and quality system. Recognition and Award Incentives/recognition in the form of newsletters, letter of accommodation, ensures that suppliers remain committed to a quality improvement strategy.

QUESTIONS 3