Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
PROFIBUS controller problem (SEU) on cryo valve on DFBMH (600 A circuit RQ6.L7B1/2). Loss of cryo maintain ==> Beam dump. End of fill #1975 after ~2.5.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
LHC report Friday 22 nd June 2016 Coordination: Wolfgang Hofle and Mike Lamont.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Machine Coordinators: G. Arduini, J. Wenninger
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Summary of week 7 Hardware Commissioning:
Tuesday Nov 16th Fill 1492 into physics around 07.30
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
MD25 ns - 14/12/2012 G. Arduini, H. Bartosik, G. Iadarola, G. Rumolo
LHC Morning Meeting - G. Arduini
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
Monday 6th August & night
Summary of Week 11: 14 – 21 March
Coordination: Gianluigi Arduini & Jan Uythoven
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Summary of Week 16 G. Arduini, J. Wenninger
Lost at 12:05 to power converter (RTQX2.R1) problem
Scrubbing progress - 10/12/2012
LHC Morning Meeting - G. Arduini
Friday 31st August & night
Week 36 plan Todo’s: And also: 12+b injection.
LHC Morning Meeting - G. Arduini
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Friday 14th December - morning
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
Friday morning 10:30 Optics measurements and corrections.
Tuesday 9th November 10:02 Fill beams dumped
Wednesday 03/11 – The Plan Finish electron-cloud program:
LHC Morning Meeting - G. Arduini
Tuesday morning 09:30 Beam dump, SIS dump due to lost connections with FCG FECs. Coincides with starting a development SIS server to test new interlocks.
Summary Thursday h21: Stable beams fill #1303.
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Monday 24 October hours of 25ns MD
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
MD#2 News & Plan Tue – Wed (19. – 20.6.)
LHC Morning Meeting - G. Arduini
Saturday Nov Stop proton operation. Switch back to ions
Scrubbing progress - 08/12/2012
IP8 aperture measurements (07:30-10:30)
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
LHC Morning Meeting - G. Arduini
Wednesday 16th May 03:05 beam dump, RF fault crowbar problem on module M1B2 06:09 Another crowbar at injection. Access for RF; problem Beam Imminent Warning.
LHC status - Week 35 G. Arduini, M. Lamont Main aims:
Tuesday 20 September 2011.
Thursday
Coordination: Eva Barbara Holzer, Mike Lamont
Wednesday h18: 228b fill lost just before start of ramp.
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Monday 27th August & night
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Saturday 26 November 2011.
Tuesday
Preliminary Results of MD wk46 V. Baglin, G. Bregliozzi, P. Chiggiato,
Monday 152 bunch operation summary
Presentation transcript:

Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill Wednesday and Thursday Proton MD (75ns and 50ns) "in the shadow" Wednesday to FridaySaturday Monday Ion physics with 121 bunches, Fills 1492, 1493 Tuesday Ion physics with 121 bunches, Fills 1494, 1496 Wednesday Setting up for 75ns protons all day and night Thursday 75ns high intensity studies at 450 GeV Friday 50ns studies at 450 GeV and ramp Saturday Setting up for ions and physics, Fill 1504 Sunday Ion physics with 121 bunches, Fills 1505 8:30 meeting

Wednesday - 75ns setting up 06:00 Start proton MD 09:30 Pilot injection: LHC-SPS Re-synchronization problem 09:30-10:30 No beam from CPS (RF problem) 12:00 LHC-SPS Re-synchronization problem fixed. In the mean time test 75 ns beam in the SPS 14:00 Safe beam flag test done 14:30-15:00 Phase loop gain adjustment 15:00-16:30 PS Access (in the mean time first set of loss maps) 16:30-22:00 Issues with RF capture of single bunch with nominal intensity. In parallel final verification of loss maps. 22:00-23:00 Setting-up of single batch injection 23:00-06:00 Transfer line and injection setting-up with 75 ns 06:00-ongoing: Start injection of more trains of 24+24 bunches 8:30 meeting

Thursday - 75ns Filling while monitoring vacuum and cryogenics, all at 450GeV 680 bunches/beam (8+14*48) 9 1010 p/b, batch spacing 1.85 us Kept this beam for 2 hours for UFO investigations Hit problems with capture of Beam 2. Press on with Beam 1 680 bunches Beam1 (8+14*48) 11 1010 p/b, batch spacing 1.85 us 824 bunches Beam1 (8+17*48) 11 1010 p/b, batch spacing 1.05 us In all cases, vacuum effects much reduced cf 50ns Activity in the common beam pipes In all cases, negligible heat load in the arcs 8:30 meeting

8+14*48 = 680 bunches Finally got there....intensity slightly lower than nominal (~0.9x1011 p/bunch). During the ramp in intensity measurements for vacuum and cryogenics

Vacuum with 680 bunches per beam 8:30 meeting

BSRT emittances of the 14 trains Still blow-up observed in particular for B1 horizontal  investigations on feedback side  horizontal oscillations observed  can be damped by higher chromaticity 8:30 meeting

Thursday - 75ns – high intensity Capture losses observed on beam 2 during Thursday are understood  Cavity 7B2 is showing some noise on the accelerating voltage. It seems to be correlated with high beam intensity  solution  conditioning if running at higher intensity 8:30 meeting

Friday – switch to 50ns Setting up of 12, 24 and 24+24 bunch injection Two trains of 24+24 bunches injected. Visible effect on vacuum  there was no visible effect for two trains of 24+24 bunches for 75 ns spacing 8:30 meeting

Friday – 50ns ramps IP6 BPM test OK with 108 bunches Test ramp with single nominal bunches OK. Full set of loss maps Set up for 'repeat' of fill 1459 (night of Oct 30/31) Fill 1500 - 1+9*12 bunches of 1.1e11 Lost at 3.5 TeV because of trip of power converter (RQTD.A12B1) 22:30 Issues with MKD Beam1 - access needed Ramp with 1+9*12 bunches of 1.1e11 (Beam 2 only) for cryo and vacuum measurements 8:30 meeting

Fill 1459 – 31st October 50ns_109b_12_90_12bpi10inj - Trains well separated Pressure up to 2e-8 mbar 8:30 meeting

Fill 1500 – 19th November Pressure increases at VGI in A4L1 But much lower than before 8:30 meeting

Fill 1500 – 19th November Only SR desorption in LSS2 in LSS3&5 8:30 meeting

Friday – 50ns – 450 GeV After the access: Injection of trains of 48 bunches spaced by 1.85 microseconds (similar to what was done with 75 ns) for comparison purposes Go with Beam 1 to speed up. Managed to inject 444 bunches with ~1.2x1011 p/bunch Clear effects on the vacuum Clear sign of heat load on the cryogenics. Not visible with 75 ns spacing. 8:30 meeting

Fill 1502 – 50ns – 450 GeV Beam1 = 444 Bunches Beam2 = 60 Bunches Highest Pressure on LSS3 and LSS6 1E-6 mbar LHC beam commissioning 20 nov 2010 8:30 meeting

Preliminary and qualitative Much less vacuum activity and heat load with 75ns spacing Comparison of 50ns before and after many hours of scrubbing clearly shows that the situation has improved significantly Comparison of similar trains of 75ns and 50ns spacing clearly shows that 50ns is significantly worse Analysis ongoing See BCWG, LMC, Evian, Chamonix 8:30 meeting

Monday - ion physics Fill 1492 into physics around 07.30 500ns_121b_113_114_0_4bpi31inj_IONS Initial luminosity 2.5 1025 cm-2 s-1 Lost at 08.45 - network instability triggered the FMCM for the D1 in P5 Refill for physics Same configuration Fill 1493 450 Z GeV emittances B1-H: 2.6 B1-V: 2.1 B2-H: 3.5 B2-V: 3.3 Beam intensities ~ equal Stable beams from 12.50 8:30 meeting

Saturday Nov 20 – back to ions 08.00 Stop proton operation. Switch back to ions Interlocks, thresholds, synchronisation etc 10.00 Both beams circulating 10.30 PS RF problem (80 MHz cavity. No beam for 1 hour) 11.30 – 13.00 RF capture optimisation 13.30 Test ramp, 2 bunches per beam Ramp, squeeze, collide Also used for qualification of luminosity scan range Fill for physics from 17.00 Bunch intensities some 30% down on those before the stop Some delays due to SPS RF and PS RF (80 MhZ cavity) 21.50 Ramp 121 and 120 bunches 23.00 Stable beams. Fill 1504. Initial lumis around 2 1025 8:30 meeting

Sunday – ion physics (well sort of) Dump at 06.00 Refill with difficulties in the injectors Uncertainties on BCT measurements, but lower than before Losses on beam 2 (10-20%) during the squeeze 11.00 Stable beams. Fill 1505. Initial lumis around 1 1025 Dump at 13.00 Damper studies through the afternoon Back to physics in the evening with interruptions from PS MPS and PS RF Filling for physics from 23.00 or so, damper ON through the flat bottom 01.30 Stable beams. Fill 1506. Intensities (and BCT) better. Lumis 2.2 1025 8:30 meeting

BCTs during filling for 1505 8:30 meeting

Intensities b4 and after source refill 8:30 meeting

Fill 1506 8:30 meeting

Fills since the restart – getting there 8:30 meeting

Fills in week 46, all with 121 bunches When Fill Peak Integrated Length Dumped by Monday 1492 2.5e25 < 0.1 ub-1 1h EL network perturbation 1493 2.8e25 0.45 ub-1 9h OP Tuesday 1494 1.7e25 0.25 ub-1 6h 1496 2.2e25 0.3 ub-1 Saturday 1504 2.0e25 7h Sunday 1505 1.0e25 2h 1506 8:30 meeting

Coming up Stabilize/optimize source and injectors Luminosity running to push over 3 ub-1 and beyond Luminosity scans ALICE polarity switch 8:30 meeting