Www.hoarelea.com Wind Farm Noise Impact Assessment PLANNING POLICY & ETSU-R-97.

Slides:



Advertisements
Similar presentations
ENTITIES FOR A UN SYSTEM EVALUATION FRAMEWORK 17th MEETING OF SENIOR FELLOWSHIP OFFICERS OF THE UNITED NATIONS SYSTEM AND HOST COUNTRY AGENCIES BY DAVIDE.
Advertisements

DRAFT GUIDANCE NOTE FOR MEMBER STATES ON FRAUD RISK ASSESSMENT
ITU WORKSHOP ON STANDARDS AND INTELLECTUAL PROPERTY RIGHTS (IPR) ISSUES Session 5: Software copyright issues Dirk Weiler, Chairman of ETSI General Assembly.
Access to UKCS Infrastructure Infrastructure access important for continuing development of UKCS Access is by commercial negotiation within a legal and.
Health and Safety Executive Health and Safety Executive Update on Löfstedt Review and Red Tape Challenge Anthony Lees HSE Construction Policy Unit.
Regulation of Low Level Waste Management
Designing House Extensions - draft Supplementary Planning Document (SPD) for consultation Eleanor Parker, Development Management.
Wind Farm Noise Impact Assessment SMALL WIND TURBINE DEVELOPMENTS.
UK enabling Legislation Renewable Energy Strategy.
Wind Farm Noise Impact Assessment NOISE CONDITIONS.
Noise and other EH issues for wind turbines The presentation will look at the following:- The planning policy background to assessing wind turbines currently-
Energy National Policy Statements Anne Stuart DECC Energy Development Unit 22 October 2009.
Wind Farm Noise Impact Assessment NOISE PREDICTIONS – SOURCE DATA AND PROPAGATION.
Wind Farm Noise Impact Assessment INTRODUCTION AND OVERVIEW OF THE DAY.
ACOUSTICS 9 MW. ACOUSTICS 144 MW.
Brian A. Harris-Kojetin, Ph.D. Statistical and Science Policy
Towards Action Planning Linda Story Air Noise and Nuisance Team.
Picking up where we left off….. Development Plan Priorities To develop clear and relevant policies that protect, conserve and enhance the natural.
WOLVEY AGAINST SUBSIDISED TURBINE ENERGY THE PLANNING PROCEDURE HOW IT WORKS HOW YOU CAN GET INVOLVED!
ENVIRONMENTAL ASSESSMENT SEA Jamie Byfield SEA Technical Officer HRA & EIA Cara Davidson Policy Manager.
© Grant Thornton UK LLP. All rights reserved. Review of Sickness Absence Vale of Glamorgan Council Final Report- November 2009.
New Standards for Training Organisations and VET Regulators Stephanie Trestrail Executive Officer TAC.
Air Quality and Land Use Planning Land Use Consultants 11 th March 2008 Susanne Underwood.
ACOUSTICS Wind Farm Noise Impact Assessment CUMULATIVE EFFECTS.
Codex Guidelines for the Application of HACCP
Internal Auditing and Outsourcing
SNH PERSPECTIVE ON PLANNING AND THE ENVIRONMENT Derek Manson Planning Adviser.
Energy Issues in Peru and the Andes: Environmental and Social Aspects George Washington University January 28, 2005 Dr. Robert H. Montgomery Head, Environmental.
HE carbon reduction strategy Climate Solidarity Conference 25 November 2009 Andrew Smith Head of Estates and Sustainable Development.
Renewable Energy Policy: A Local Government Perspective Alison Johnson for PEC624: Dissertation.
Guidance for AONB Partnership Members Welsh Member Training January 26/
FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003.
Embedding Travel Planning in the Development Process Sarah Cummings Behaviour Change Transport for London.
UK Wide Core Skills & Training Framework Findings of 2 nd Stage Consultation and Implications for Development of the Framework.
DG ECHO GENDER POLICY and GENDER-AGE MARKER
ESRC WIND POWER SEMINAR, BELFAST ROSEMARY THOMAS HEAD OF PLANNING DIVISION WELSH ASSEMBLY GOVERNMENT 4th November 2008.
Slide 1 An Alfred McAlpine plc company. Thursday, 04 October 2007 Land Management Guidance (v2) Philippa Towler.
Review of the implementation in England of the Habitats and Wild Birds Directives Nature Directors 23 May 2012 Robin Mortimer, Defra.
7 March /24/  MassDEP convened WNTAG to advise the Department on how to craft an effective regulatory & policy response to Wind Turbine.
SECTION IV: GENERAL DESCRIPTION OF STEPS TAKEN OR ENVISAGED BY NON-ANNEX I PARTY TO IMPLEMENT THE CONVENTION Workshop on the Use of the Guidelines for.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
FLOOD RISK MANAGEMENT The next steps. The National Technical Advisory Group On Flooding Issues An Overview and the Future.
Windfarms Implementing SPP6 Nick Evans 6 th December 2007.
RTPI Conferences is managed by Kaplan Hawksmere on behalf of the Royal Town Planning Institute Strategic Planning for Renewable Energy Sarah Young MRTPI.
Carbon Emissions and the Need for Improved Energy Efficiency.
Slide 1 Customer Satisfaction Monitoring Rolling data 2014/15 –Waves 1-12 (April 14-March 15)
Project management Topic 7 Controls. What is a control? Decision making activities – Planning – Monitor progress – Compare achievement with plan – Detect.
International Security Management Standards. BS ISO/IEC 17799:2005 BS ISO/IEC 27001:2005 First edition – ISO/IEC 17799:2000 Second edition ISO/IEC 17799:2005.
Responding to Wind Farm Applications Ian Aikman Major Applications, Review & Enforcement Manager Scottish Borders Council.
Prepared By: Razif Razali 1 TMK 264: COMPUTER SECURITY CHAPTER SIX : ADMINISTERING SECURITY.
Resource Analysis. Objectives of Resource Assessment Discussion The subject of the second part of the analysis is to dig more deeply into some of the.
Overview of the Final Report and Findings from the Review of Sampling Methods in Extrapolated New Base-Year Generation Studies May 11-12, 2004.
Australia's 2030 climate change emissions reduction target – abatement potential May 2016.
Why do we need more housing? The East Midlands Regional Plan is still in force, which requires 510 houses to be built per annum between 2006 and 2026 Although.
ISO 9001:2015 Subject: Quality Management System Clause 8 - Operation
Incorporating Road Safety Audit into Development Control Kevin Nicholson Principal Consultant.
Presentation of Nominations to the World Heritage Committee by the Advisory Bodies Presentation by ICOMOS Paris, January 2013.
Narratives management for UK onshore Wind energy projects Peter Linnell M.Sc. AEES CAT/GSE Conference 3/9/11.
Raising standards improving lives The revised Learning and Skills Common Inspection Framework: AELP 2011.
IPPC A general overview Nigel Barraclough Policy Adviser Industrial Pollution Control Branch Air and Environment Quality Division. Taiwanese Environmental.
APPRAISAL OF THE HEADTEACHER GOVERNORS’ BRIEFING.
An agency of the European Union Guidance on the anonymisation of clinical reports for the purpose of publication in accordance with policy 0070 Industry.
Kenya’s INDC: Actions in the Energy Sector
The Risks of Environmental Noise Assessments
Clerks’ Briefing Spring 2016.
EIA approval process, Management plan and Monitoring
How to use this document
UK Marine Planning and the Ecosystem Based Approach
9th Noise Expert Group Centre Borschette, Brussels, Belgium.
Strategic Environmental Assessment (SEA)
Presentation transcript:

Wind Farm Noise Impact Assessment PLANNING POLICY & ETSU-R-97

Renewable Development & Noise NSNA EPA COPA Energy Act Climate Change Act BS 4142 BS 8233 ETSU-R-97 Planning system to deliver renewables … Scotland WHO EU Directives Kyoto Protocol www Onshore WTs SPP PAN1/2011

The EU and UK wind resource The UK has the best wind resource in Europe

Wind Farm Noise - the basic aims …. Demonstrate acceptable wind farm noise impact at the planning stage Achieve this acceptable noise impact in practice Balance local noise impact against wider benefits (generating capacity)

Scottish Planning Policy – PAN1/2011 Good acoustical design and siting of turbines is essential to minimise the potential to generate noise. Web based planning advice on renewable technologies for onshore wind turbines provides advice on The Assessment and Rating of Noise from Wind Farms (ETSU-R-97) published by the former Department of Trade and Industry [DTI] ….

Onshore Wind Turbines (as updated 17 July 2013) - Noise PAN on Planning and Noise provides advice on the role of the planning system in helping to prevent and limit the adverse effects of noise. The associated Technical Advice Note provides guidance which may assist in the technical evaluation of noise assessment.

Onshore Wind Turbines (as updated 17 July 2013) - Noise The report, "The Assessment and Rating of Noise from Wind Farms (ETSU-R-97) ….. should be followed by applicants and consultees, and used by planning authorities to assess and rate noise from wind energy developments, until such time as an update is available. This gives indicative noise levels thought to offer a reasonable degree of protection to wind farm neighbours, without placing unreasonable burdens on wind farm developers ….

Onshore Wind Turbines (as updated 17 July 2013) - Noise A further report produced by Hayes McKenzie for DECC … An Analysis of How Noise Impacts are Considered in the Determination of Wind Farm Planning Applications suggested that best practice guidance is required to confirm and, where necessary, clarify and add to the way ETSU-R-97 should be implemented in practice ….

Onshore Wind Turbines (as updated 17 July 2013) - Noise The Institute of Acoustics (IOA) has since published Good Practice Guide to the Application of ETSU-R-97 for the Assessment and Rating of Wind Turbine Noise. The document provides significant support on technical issues to all users of the ETSU-R-97 method for rating and assessing wind turbine noise, and should be used by all IOA members and those undertaking assessments to ETSU-R-97. The Scottish Government accepts that the guide represents current industry good practice.

Onshore Wind Turbines (as updated 17 July 2013) - Noise Further research by AECOM entitled NANR Wind Farm Noise: Statutory Nuisance Complaints Methodology is aimed at helping Local Authorities deal with wind farm noise complaints, using statutory nuisance powers

Noise Policy Statement for England What does minimise increases in noise mean in the context of noise policies? … taken in isolation and to a literal extreme, noise minimisation would mean no noise at all. In reality, although it has not always been stated, the aim has tended to be to minimise noise as far as is reasonably practical the application of the NPSE should enable noise to be considered alongside other relevant issues and not to be considered in isolation. In the past, the wider benefits of a particular policy, development or other activity may not have been given adequate weight when assessing the noise implications.

Baseline 45 MW Consider effect of 2 dB(A) reduction Effect of 2dB(A) at one property 36 MW Effect of 2dB(A) at all properties 27 MW A 2dB(A) difference in noise level is generally considered to be subjectively insignificant – what is the correct planning balance?

The situation to be addressed …. Source Propagation Receiver

Wind Farm Noise – setting acceptable limits ETSU-R-97

BS4142 was used as a helpful starting point but recognised as having a number of practical limitations … Wind farms are likely to be developed in largely rural areas and not in the areas to which the BS4142 standard is principally addressed, namely mixed residential and industrial areas The scope of BS 4142 specifically precludes situations where background noise levels lie below 30 dB(A) but such low levels can be encountered in rural areas BS 4142 recommends that noise measurements should not be taken in extreme weather conditions such as high wind speeds greater than 5 metres per second average – just those conditions under which wind farms would be operating

… but it appears to have been accepted that the general principles of BS4142 should be retained … like should be compared with like specific noise assessed against background noise under the same conditions special consideration given to situations of low noise levels time of day effects for background mode and time of operation effects for specific noise wind effects (direction and speed) use of robust metrics L A90 versus L Aeq (specific to wind farm noise)

Use of the L Aeq,T index for the measurement of specific noise levels in quiet rural areas is highly susceptible to corruption by natural sources of noise

VHVH Both turbine noise and background noise are wind speed dependent VLVL

Steps for undertaking an ETSU-R-97 assessment Specify the location of wind turbines and a candidate type of turbine Identify the locations of the nearest noise sensitive properties (or groups of properties) Determine whether noise immission levels exceed 35dB(A) Measure background noise levels as a function of site wind speed at nearest neighbours, or at least a representative sample of such Determine the day-time and night-time noise limit curves from the measured background noise levels Calculate the noise immission levels at the neighbouring properties Compare calculated wind farm noise levels with derived noise limit curves to ensure ETSU noise limits will not be breached

Measure the existing (inherently variable) background noise level at selected locations as a function of site wind speed and time of day Assessment property – quiet daytime or night time

Calculate the average background level by fitting a best fit curve to the measured noise data Assessment property – quiet daytime or night time

Set the ETSU-R-97 noise limit at 5dB(A) above the background noise curve but with an absolute lower limit day night involved Assessment property – quiet daytime or night time

Calculate wind farm noise immission levels at receptors and compare with ETSU noise limits Noise Propagation Calculation Algorithm Wind Farm Noise Immission Level ETSU-R-97 Noise Limit

The Institute of Acoustics Good Practice Guide Response to request to IoA from DECC Follow up to HMP report Applies to all turbines above 50kW Formally endorsed in Scotland -consultation & engagement -background noise surveys -wind and rain measurements -data analysis and noise limit derivation -noise predictions -cumulative noise issues

Summary of current situation The majority of wind farms designed using ETSU-R-97 appear to be operating successfully without noise issues? Site-specific noise issues have occurred that need to be better understood/managed Operational noise management is possible with current technology wind turbines to mitigate noise effects Amenity of neighbours and a proactive attitude towards noise concerns remains of paramount importance but Inaudibility at all locations and at all times is not a realistic proposition Fears of adverse noise effects may be causing undue stress even before wind farms are constructed

Summary of current situation Either Noise will prevent renewables targets from being met or Noise will result in many more wind farms being built There is an urgent need for a consensus view within the industry, along with improved public engagement, as to those acoustic factors which are truly relevant.

Thank you