Agenda Today: Electron cloud build-up in Wigglers – Theo Demma

Slides:



Advertisements
Similar presentations
March 22, 2011 Mauro Pivi SLAC ALCPG11 Eugene Oregon March 19-23, 2011 Working Group plans.
Advertisements

KEK Recent results of beam tests on clearing electrode and grooves 2010/1/191ILC DR WebEx Meeting Y. Suetsugu, KEK.
First approach to the SuperB Rings M. Biagini, LNF-INFN April 26th, 2006 UK SuperB Meeting, Daresbury.
2011 Damping Rings Lattice Evaluation Mark Palmer Cornell University March 8, 2011.
45 th ICFA Beam Dynamic Workshop June 8–12, 2009, Cornell University, Ithaca New York Jim Crittenden Cornell Laboratory for Accelerator-Based Sciences.
Single-bunch Instability Simulation in CesrTA Mauro Pivi SLAC and Kiran Sonnad Cornell U. IWLC October 2010 CERN.
Electron Clouds at SLAC Johnny Ng ILC Damping Rings Collaboration Meeting March 4, 2009.
Webex Electron Cloud Evaluations for ILC DR Mauro Pivi on behalf of the ILC Electron Cloud Working Group - by Webex - KILC12 – Daegu Korea April 25, 2012.
MAINTENANCE STRATEGY SELECTION BASED ON HYBRID AHP-GP MODEL SUZANA SAVIĆ GORAN JANAĆKOVIĆ MIOMIR STANKOVIĆ University of Niš, Faculty of Occupational Safety.
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
March 23, 2010 CMAD a tracking and e-cloud beam instability parallel code (M.Pivi SLAC) Taking MAD(X) optics file at input, thus tracking the beam in a.
Electron cloud in the wigglers of ILC Damping Rings L. Wang SLAC ILC Damping Rings R&D Workshop - ILCDR06 September 26-28, 2006 Cornell University.
CesrTA EC Build-Up and Mitigation Program - Introduction Mark Palmer June 25, 2009.
CesrTA Status Report & R&D Planning Mark Palmer Cornell University April 21, 2010.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
October 13,2010 WG Meeting Cornell U. Recommendation for Electron Cloud Mitigations in the ILC Damping Ring ILC DR Working Group October 13, 2010 Cornell.
Electron Cloud Mitigation Studies at CesrTA Joseph Calvey 10/1/2009.
Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.
Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.
ILC DR Workshop - KEK December, A new resonance in wiggler simulations: Christine Celata Use POSINST code.
June 16, 2009 Today: Updates on Mitigations KEK – Y. Suetsugu Updates on photoe- estimates by Synrad3D – K. Harkay CesrTA last run and updates on mitigations.
GDE, 26 Oct 2007, FNAL Global Design Effort 1 Damping Rings Area System Summary Andy Wolski.
Motivation and Overview David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
ILC Damping Rings Electron Cloud Working Group Meeting Introduction S. Guiducci (LNF) ECLOUD10, Cornell 13 October
C ESR TA Status Report July 22, 2010 Mark Palmer for the C ESR TA Collaboration.
Nov 17, 2009 Webex Assessing the 3.2 km Ring feasibility: Simulation parameters for electron cloud Build-up and Instability estimation LC DR Electron Cloud.
Damping Rings Lattice Evaluation Mark Palmer Cornell University January 19, 2011.
CesrTA Vacuum System Conversion and Operational Experiences Yulin Li for the CesrTA Team Cornell Laboratory for Accelerator-based ScienceS and Education.
CesrTA Status Report Mark Palmer Cornell University September 2, 2009.
Electron cloud in Final Doublet IRENG07) ILC Interaction Region Engineering Design Workshop (IRENG07) September 17-21, 2007, SLAC Lanfa Wang.
Electron cloud measurement in Cu/Al chambers with/without TiN coating at KEKB positron ring ILC DR Working Group Meeting Kyo Shibata (KEK)
Vacuum System S. Guiducci BTR, LNF 8 July RDR - electron damping ring:
Electron Cloud Issues for the 3.2km Positron Damping Ring Mark Palmer (Cornell University) GDE January 18, 2011 ILC Baseline Assessment Workshop 2 SLAC.
7 November 2006 Valencia Global Design Effort 1 Damping Ring Susanna Guiducci INFN-LNF for Jie Gao (IHEP), Andrzej Wolski (Cockcroft Institute) and Mike.
WebEx meeting November 17, 2009 ILC Damping Ring Working Group on Electron Cloud LC e- cloud Working Group November 17, 2009.
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008) First Intnl. Teleconference Ecloud, Impedance/Instabilities - M. Pivi, SLAC 31 October.
Intra-Beam Scattering and Electron Cloud for the Damping Rings Mauro Pivi CERN/SLAC CLIC Collabortion Meeting CERN 9-11 May 2012 Thanks to: F. Antoniou,
Updates of EC Studies at KEKB 1.EC studies at KEKB 2.Recent results 1.Clearing Electrode 2.Groove surface 3.TiN coating 4.Measurement of EC in solenoid.
3 February 2010 ILC Damping Ring electron cloud WG effort Mauro Pivi SLAC on behalf of ILC DR working group on e- cloud ILC DR Webex Meeting Jan 3, 2010.
Progress and Plans for Main Injector beam Pipe Coatings Dave Capista Linda Valerio Project X Collabration Meeting WG3 MI/Recycler September 8, 2010.
Electron Cloud in the International Linear Collider ILC Mauro Pivi work performed while at SLAC and the ILC Damping Ring Working Group High.
1 AS TAG Leaders Meeting Webex - Friday S. Guiducci, M. Palmer.
Electron Cloud Experimental Plans at Cesr-TA ILCDR08 - July 10, 2009 G. Dugan Cornell Laboratory for Accelerator-Based Sciences and Education.
Recent Studies on Electron Cloud at KEKB 1.EC studies at KEKB 2.Recent results –Clearing Electrode –Groove surface –EC measurement in Q and solenoid field.
49th ICFA Advanced Beam Dynamics Workshop. October 8–12, 2010 LEPP, the Cornell University Laboratory for Elementary-Particle Physics, has joined with.
International Linear Collider R&D on electron cloud (SLAC)
Groove Mitigation and Plans
Supplement S7 Supplier Selection.
Electron Cloud Effects in SuperB
Electron Cloud and Ion Experimental Program
Electron Cloud R&D at Cornell ILCDR08--7/8/08
CesrTA Status Report Mark Palmer July 8, 2009.
RECENT DEVELOPMENTS IN MODELING
Why Study Electron Clouds? Methods and Tools to Study Electron Clouds
J.A.Crittenden, Y.Li, X.Liu, M.A.Palmer, J.P.Sikora (Cornell)
Damping Ring Summary S. Guiducci, M. Palmer, M. Pivi, J. Urakawa
Analytical Hierarchy Process
Agenda Today: CesrTA and SuperKEKB simulations - Ohmi
ILC DR instability simulations
CesrTA Experimental Schedule and Priorities
ILC DR instability simulations
Electron cloud studies at CESR
ILC Damping Ring electron cloud WG effort
Electron Clouds at SLAC
CTA 09 - Introduction David Rubin Cornell Laboratory for
Session Introduction & Damping Rings Baseline Lattice Decision
ILC DR instability simulations
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008)
Presentation transcript:

Agenda Today: Electron cloud build-up in Wigglers – Theo Demma Electron cloud build-up in Quad and Sext – Lanfa Wang Mitigations recommendation discussion – all

Recommendation for electron cloud mitigations in the DR Mauro Pivi for the LC DR Working Group August 25, 2010 ILC DR Webex Meeting

WG Main Deliverables Characterization of electron cloud at different bunch spacing: 6ns and 3ns by end 2010 Recommendation for the baseline and alternate solutions for the electron cloud mitigation in various regions of the ILC Positron Damping Ring. by end 2010

Recommendation for Mitigations Evaluate mitigations for all the DR regions. Started discussion on criteria for the selection and on mitigation alternatives Mitigations evaluation process: With respect to the method shown at previous Webex meeting, some modifications: Simplified the method and reduced alternatives Ranking scales simplified (still linear though) Similarities with DRs recommendation process made in 2006 Hopefully clearer

Recommendation for Mitigations Going through one case GOAL: Select electron cloud mitigation in DRIFT sections for the DR Straights Criteria for mitigation evaluation: Efficacy of mitigation Impact on Vacuum Impact on Impedance/Optics Costs Criteria includes a number of sub-criteria. For example “Costs” includes: Design, Manufacturing, Durability & Maintenance costs, see below

Scale for Pairwise Comparison Intensity of Importance Ranking the Criteria To rank the criteria systematically, we compare them pairwise using a scale summarized as Scale for Pairwise Comparison Intensity of Importance Definition Explanation 1 Equal importance Two elements contribute equally to the objective 2 Moderate importance Experience and judgment slightly favor one element over another 3 Strong importance Experience and judgment strongly favor one element over another 4 Very Strong to Extreme Importance One element is favored very strong over another or the evidence favoring one element is of the highest possible order of affirmation

Evaluation of mitigation alternatives GOAL: Select electron cloud mitigation in DRIFT sections for the DR Straights Electron cloud mitigation Alternatives for DRIFTs in STRAIGHT sections: TiN or amorphous-Carbon NEG coating Grooves with coating Clearing Electrodes have not been considered here since they are costly and practically difficult to implement in DRIFTs and over long distances

Evaluation of mitigation alternatives TiN, C and NEG imply also the installation of solenoids To rank the alternatives, we compare them against each of the criteria using a scale from -4 to +4 summarized as: Negative values=detrimental 0 = no impact Positive values = helpful

Hierarchical table for Mitigations Selection Process

WebEx meeting Proposed date/Time for next Webex meeting: Wednesday 22 or 29 September 2010

Our presentations posted on web site ILC Damping Ring Wiki: https://wiki.lepp.cornell.edu/ilc/bin/view/Public/DampingRings/ ILC Damping Ring Teleconference page: https://wiki.lepp.cornell.edu/ilc/bin/view/Public/DampingRings/TeleConference

Messages board Blackboard Messages here