Paramix mid-term meeting in Barcelona November 13, 2002

Slides:



Advertisements
Similar presentations
DAY ONE - STEP ONE - Preparation Pure Crete is added to a water truck with a spray bar located at the rear of the truck at a ratio of one gallon to 2000.
Advertisements

Research | consulting | technology safety and efficiency in transport through knowledge TT1825 Mix design and field evaluation.
Using CFB Ash As A Substitute For Portland Cement In Full Depth Reclamation Presented By Steve Dixon, Civil & Environmental Consultants, Inc. Jim Panaro,
Asphalt Concrete Mix Design and Construction
Use of Public Roads New perspectives in mixture designing Role of the state in Technological Developments Chantal de La ROCHE LCPC - France Head of Road.
HMA Design (Surface) The surface course is the layer in contact with traffic loads and normally contains the highest quality materials. It provides characteristics.
Construction Materials (CE 1206)
Pavement Material Session Matakuliah: S0753 – Teknik Jalan Raya Tahun: 2009.
Pavements. Concrete –Rigid pavement Used where strength is an issue Runways, interstates and major roads –Continuous reinforcing Must have a good base.
HRVATSKO ASFALTERSKO DRUŠTVO COLD IN SITU RECYCLING AND VERY THIN ASPHALT CONCRETE - FRENCH TECHNOLOGY JP MICHAUT SEMINAR ASFALTNI KOLNICI 2015 OPATIJA,
Low Volume Road Solutions By: Jason Panter. Seal Coats What is a Seal Coat? – Thin surface treatments – Binder & Aggregates.
SMA Mixture Design Requirements
The Asphalt Core Embankment Dam A Very Competitive Alternative
Relation between CEN standards and performance based operations By JP Michaut Colas’ Group.
Asphaltic Concrete Mix Design
Recycling….the re-use of sealed roads Andrew Silvestri, Account Manager ResourceCo Roads & Works Conference – August 2012.
PART 8 BITUMINOUS MATERIALS
Conversion of Petroleum Contaminated Soil into Asphalt-Treated Road Base U.S. Army Corps of Engineers, Alaska District.
TOPIC OF THE DAY Flexible Pavement Distresses/Failure Of Structure.
NDDOT/LTAP Assistance Conference Mandan, North Dakota November 30, 2011.
Tolerances and Price Impacts Presented by:- Er. Bhagawan Shrestha.
Pavement Design Terms and Concepts
Bituminous Street Recertification Initiatives. Initiative Items n Stone Matrix Asphalt (SMA) n Longitudinal Joint Spec and other methods for longitudinal.
CUPGA - CTAA SMA in Québec D. Perraton, M. Meunier and M. Paradis (MTQ) LUCREB / ÉTS November 2004.
Testing of Cement.
Slurrybound Macadam as Surfacing Option Johan Hattingh May 2005.
Pavement Maintenance II
Eng. Malek Abuwarda Lecture 11 P1P1 Construction Methods Lecture 11 Compaction Equipment and Procedures.
Pavement Distresses Flexible Pavement
AAPA 2010 Study Tour – Accelerated Pavement Testing & Equipment Observations and Recommendations Accelerated Pavement Testing & Equipment.
AGGREGATES.
In Situ Stabilization of Pavement Base Courses Roads Pavement Forum Thursday, May 17, 2001.
Overview of French Research Project on Cold Mix Asphalt Recycling for Road Construction / Maintenance Vincent GAUDEFROY June 4, 2012.
Interim Guidelines: The Design and Use of Foamed Bitumen Treated Materials Kim Jenkins, Dave Collings Hechter Theyse, Fenella Long Road Pavements Forum.
Road Construction Technology
Sampling and Testing Concrete Mixes MATERIAL TESTING LABORATORY
Procedures in Modern Road Construction I. Development of Ancient Roads 1. Great civilizations throughout history enhanced road building. 2. Cross-section.
HiMA TRIAL REPORT AUSTRALIAN TOUR PRESENTED BY WYNAND NORTJE 9 SEPTEMBER 2011.
Highway Subgrade (1) Introduction
Pavement Types Dr. TALEB M. Al-ROUSAN.
 The objective of this task is to develop a mix design procedure for the various types of FDR  Determine what works and what does not work  Each.
Asphalt Concrete Mix Design
Liquid Soil Stabilizer & Road Compactor BASE2000 D. C. A. GEOTECHNIC. ENGINEERS TOP2000 Liquid Surface Sealer & Dust Control Base Marketing International.
A REVOLUTION IN ROAD BUILDING
R52 Rustenburg-Koster Road
RE-USE and RECYCLING of CONSTRUCTION WASTES in FRANCE By Jean Paul Michaut.
Full Depth Reclamation
Chip Seal Best Practices by: Larry Galehouse, P.E., P.S., Director National Center for Pavement Preservation.
3rd International Road Surface Friction Conference
Marshall & Superpave Mix Design
Road making chemical Environmentally friendly
Town Road Survey - What You Should Know 1_24_17
PPRA Fall Meeting, 2014 “Extending the Nation’s Road Maintenance Dollars” Experience with Emulsion-Stabilized FDR on Lower Volume Roadways in Wisconsin:
Compaction.
Feasibility Study to Evaluate Brick Aggregates and Foam Bitumen treated RAP for Pavement Design and Construction of NH-44 in Tripura.
WORKABILITY TESTS OF CONCRETE
TT1825 Mix design and field evaluation of foamed bitumen stabilised pavements December Advancing safety and efficiency in transport.
ALDOT Specification Updates
Surface Preparation before laying Hot Mix
ACP Inspector Certification Homework (oops, not homework) Solutions
PAVEMENTS CEE 320 Steve Muench.
Implementation of CEN/TC 154 and TC 227 standards in Iceland
Introduction to Pavement Design
CONSTRUCTION METHODS & TECHNOLOGY
What is CONCRETE SLUMP TEST –
Pavement materials: Soil
Pavement Structural Analysis
DRY CAST CONCRETE FOR BOXES
Light Compaction Equipment
OLD CONCRETE MAKES WAY FOR NEW ASPHALT A Laatz, N Cocks, N Burger
Presentation transcript:

Paramix mid-term meeting in Barcelona November 13, 2002 Status of Swedish test sections for cold in-situ stabilization

Test sections are located northwest of Umeå Stockholm The location of the test sections is approximately 650 kms north of Stockholm Gothenburg

Test road before stabilization The length of the test road is 1600 meters. The structural strength was measured before any measures using a FWD. Test road before stabilization

FWD measurement Example only This is an example from another section of a Swedish road. On the test sections sensors were located 0, 200, 300, 450, 600, 900 and 1200 mms from the center of the load plate.

Cores were taken in each lane and direction every 50 meters.

Average thickness 50 mm Thickness measured, composition analyzed (bitumen content and grading) and bitumen recovered and analyzed.

Unbound base .... Under the surfacing .... Samples og the unbound layer underneath the asphalt were taken and analyzed. Under the surfacing ....

Swedish test sections emulsion emulsion no emulsion Test 1 *added SA 16 SA 16 SA 16 100 mm new base emulsion emulsion no emulsion 50 mm AC 100 mm gravel base SA means soft asphalt wearing course (thickness 45 mm). On the first test section 50 mm new aggregate (4-32 mm) was added and mixed with the existing asphalt and 50 mm of existing gravel base. On the second section 50 mm new aggregate (0 – 32 mm) was added... In the second step emulsion was added up to about 4 % (residual binder content!) of the layer. The reference section has no emulsion added, only mixing was performed. A new base layer was added on top. This is the common Swedish way to reinforce a road of this type. 50 mm aggregate A* 50 mm AC 50 mm gravel base 50 mm aggregate B* 50 mm AC 50 mm gravel base Test 1 *added Test 2 Reference

In-situ cold stabilization steps Adding unbound material New wearing course Emulsion mixed in ”Dry” mixing Existing Steps from left to right... Dry mixing means only water added. After dry mixing the road is shaped by means of a grader and compacted.

Emulsion production unit The bitumen emulsion was produced in our own emulsion plant also located in Umeå, close to the laboratory.. Emulsion production unit

Bitumen grade used for the bitumen emulsion The bitumen grade chosen was 330/430. It is a relevant choice taking into account the climatic conditions, workability and compactability during execution of the work. Bitumen grade used for the bitumen emulsion

First milling after adding new aggregate

Shaping after mixing in emulsion...

Surface finish after compaction with two rollers (oneheavy pneumatic and one smooth vibratory)

Samples were taken one every 50 meter on each side of the road

Laboratory compaction was performed using a gyratory compactor with 150 mm perforated moulds (allows water to escape)

A total of 69 specimens were prepared using the same procedure A total of 69 specimens were prepared using the same procedure... Now waiting for curing sawing and any analysis necessary for those building models