Robert Gomez-Reino Garrido

Slides:



Advertisements
Similar presentations
André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
Advertisements

Electrical distribution for ALICE experiment & Electronic Rack Control S. Philippin.
ZXM10 EISU Training.
André Augustinus 16 June 2003 DCS Workshop Safety.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
DCS aspects of TDAQ racks in USA15 and SDX1 Y. Ermoline et al. ATLAS Week, CERN, 15 February 2005.
Uli Schäfer Discussions with H.B. after last meeting… All ATLAS standard racks and crates will be monitored. Helfrieds group will equip them with ELMBs.
PM-RS / March Industrial CMC. PM-RS / March Industrial CMC III Where did it start? Where is it headed? Rittal supplies infrastructure for.
ONYX Product Overview.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
ALICE PC Rack Cooling System Sensor Marco Boccioli André Augustinus Giulia Fanti F.W. Olin College of Engineering.
SCADA and Telemetry Presented By:.
DSS Advisory Board Christoph Schäfer Rack Safety System.
F.F. - 18/07/ User Guide of the Input Trigger Multiplexer unit with input signal rate counters.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
Topics of presentation
15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 1 Answers from the HMPID to the ACC questions 1.Concerning global DCS overview drawing 2.Concerning.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
GIF++ Control System (GCS) Gilles MAIRE PH-DT-DI1.
Helen Heath, Magnus Loutit.  Useful meetings at CERN before Easter ◦ ML and HH met with John Fullerton from BE for practical advice on the CEDAR motor.
New digital readout of HFRAMDON neutron counters Proposal Version 2.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO RCS Review Meeting ― September 2 nd, 2003.
Modular C ontroller S eries Product Introduction.
Lesson 1 PLC BASICS. PLC Definition  Programmable Logic Controllers are industrial computers that control machine and other applications.  PLC have.
Team Members: ECE- Wes Williams, Will Steiden, Josh Howard, Alan Jimenez Sponsor: Brad Luyster Honeywell Network Traffic Generator.
FTK infrastructures and DCS 02/12/20101FTK Initial Design Review - A. Lanza  Crates  Single rack layout  Cabling  Rack placement  DSS  DCS.
PVSS an industrial tool for slow control
NEW RMC Rack Multi Control.
FPix DCS Subgroup Report
HighPROTEC-2 MRM4-2 Motor Protection Relay Sales presentation
I/O SYSTEMS MANAGEMENT Krishna Kumar Ahirwar ( )
Hardware, Installation & maintenance
Safety Systems for ALICE
I-Station Hardware, Installation & maintenance
FTK infrastructure in USA15 Status and plans for 2015 A
HighPROTEC-2 MCDTV4-2 Transformer Protection with differential Sales presentation 2015/08/10.
SCADA for Remote Industrial Plant
DCS WG report 9/09/11 FV.
Christian Veelken last updated 11/09/06
ATLAS MDT HV – LV Detector Control System (DCS)
CMS – The Detector Control System
How SCADA Systems Work?.
MAUVE CO2 cooling review
JCOP Review Closeout March 13, 2003 Chip Watson, Robin Lauckner,
DCS WG report 9/09/11 FV.
Session III Architecture of PLC
Programmable Logic Controllers (PLCs) An Overview.
Radiation- and Magnet field- Tolerant Power Supply System
HighPROTEC-2 MRDT4-2 Transformer Protection with differential Sales presentation 2015/08/10.
The LHCb Run Control System
PAVIRO - Introduction Security Systems
PLC Hardware Components.
PLC / SCADA / HMI Controllers: Name : Muhammad Zunair Comsats University Date: 28-October-2018.
Pierluigi Paolucci & Giovanni Polese
Design Principles of the CMS Level-1 Trigger Control and Hardware Monitoring System Ildefons Magrans de Abril Institute for High Energy Physics, Vienna.
ACOE347 – Data Acquisition and Automation Systems
Experiment Control System
Switching & Controlling LoB
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Tools for the Automation of large distributed control systems
Operation of Target Safety System (TSS)
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

Robert Gomez-Reino Garrido Rack Control Application CMS WEEK 16 Mars 2004 11/13/2018 Robert Gomez-Reino Garrido

Robert Gomez-Reino Garrido A joined project The Rack Control is a joined project between the four LHC experiments and other CERN groups. This project concerns : The power distribution. The monitoring. The cooling. The safety systems. ST-EL : power distribution chassis. ST-MA : smoke detection. EST-LEA : turbine chassis. EP-ESS : monitoring and safety boards. CMS: Rack Control Application (as a JCOP framework development). 11/13/2018 Robert Gomez-Reino Garrido

Power Distribution: CANALIS 11/13/2018 Robert Gomez-Reino Garrido

Monitoring and Safety Systems Purposes Provision of hard-wired, “last-resort” safety. Monitoring of the rack environment. Provision of user-definable analog inputs and digital I/O channels accessible via the DCS. Monitoring Air temperature. Relative humidity. Air circulation status. Tangential turbine currents. Status of the thermo-switch. Status of rack door. Monitoring card in situ. Rear air temperature. Leak detector (?) User definable I/O. Safety Thermo-switch. Smoke detector. EP-ESS adopted the philosophy of designing only one system working either in no radiation or radiation areas. The system provides DCS whit 16 analog input channels, 8 digital output and 8 digital input/output. For the monitoring system must be possible to replace any component without interfering with the functioning of the equipment in the rack. 11/13/2018 Robert Gomez-Reino Garrido

System Implementation Mounted entirely within the standard LHC turbine unit. Consist of 3 components. 11/13/2018 Robert Gomez-Reino Garrido

System Implementation 11/13/2018 Robert Gomez-Reino Garrido

Robert Gomez-Reino Garrido Monitoring card Monitoring system designed around the ELMB. 9 pin SubD connector on the front panel (including the CAN communication and the power for the monitoring). May be repaired without powering off the rack. 11/13/2018 Robert Gomez-Reino Garrido

Robert Gomez-Reino Garrido Monitoring card 11/13/2018 Robert Gomez-Reino Garrido

Robert Gomez-Reino Garrido Auxiliary card This card is not accessible while turbine is in situ in the rack. The thermo-switch is also in this card to avoid the possibility that this safety device can be removed from the rack. 11/13/2018 Robert Gomez-Reino Garrido

Robert Gomez-Reino Garrido Auxiliary card 11/13/2018 Robert Gomez-Reino Garrido

Rack Control Application The Rack Control Application is a PVSSII application that will be integrated in the JCOP framework. Dedicated to the control and monitoring of the rack systems of the LHC experiments. Structure and Configuration The application has a hierarchical structure where zones have racks and the racks have sensors. The zones, racks and sensors can be either created manually or reading from database. To be able to benefit from this option the experiments should use a common structure database. Rack Control Zones Racks Sensors 11/13/2018 Robert Gomez-Reino Garrido

Information Structures Zone Info Zone name Geometrical Info (Width and Depth) Description and Drawing Display, State Last update DATABASE INFO Rack Info Rack name Geometrical Info (Width and Depth, Height?) Number and Row Position (X, Y, orientation) Detector, user, responsible and Comments Weight Last Change Sensors and sensors type PLC address Last Update Important amount of necessary info is readable from database. No need to configure manually the ELMBs or the PLCs addresses. 11/13/2018 Robert Gomez-Reino Garrido

Robert Gomez-Reino Garrido Functionality Once the zones are configured the user will be able to access the different levels to have the monitoring information and to send commands. A possible structure can be: Top Level (Rack Control) Panel visualizing the status of the different zones (ok, warning, error…) summarizing that information of the sensor of each rack of the zones. Zone Level Panel containing a picture of the geometrical distribution of the racks in the zone. Contains also the information of the zone. The rack color in the picture represent the status of the parameter selected by the user. This can be the general state of the rack. Commands (on, off…) can be send to individual racks (groups? Rows?) Trends of the different parameters can be access from this panel. Information of each rack can be accessed from this panel. Rack Level Panel offering the information of all the environment parameters. Additional info, crates, boards… ?? 11/13/2018 Robert Gomez-Reino Garrido

Robert Gomez-Reino Garrido To be done/defined Agree about the general structure of the software (JCOP presentation 5th March 2004). Ideas are welcome :) Whether this should appear or not in the Device Editor & Navigator and in case it should, in the logical or hardware view (in both ?) Ask ATLAS to integrate the standard environment sensors into the ELMB framework. They will provide also the structure of the information needed to retrieve from the database for an automatic configuration of the monitoring ELMBs. Define the communication protocol with the master PLC, to read the status and send commands (meeting 9th March 2004 ) . 11/13/2018 Robert Gomez-Reino Garrido

Robert Gomez-Reino Garrido 11/13/2018 Robert Gomez-Reino Garrido

Robert Gomez-Reino Garrido 11/13/2018 Robert Gomez-Reino Garrido

Robert Gomez-Reino Garrido 11/13/2018 Robert Gomez-Reino Garrido

Robert Gomez-Reino Garrido 11/13/2018 Robert Gomez-Reino Garrido

Robert Gomez-Reino Garrido 11/13/2018 Robert Gomez-Reino Garrido

Robert Gomez-Reino Garrido 11/13/2018 Robert Gomez-Reino Garrido