Standards Development: An Overview

Slides:



Advertisements
Similar presentations
Standards Development: An Overview
Advertisements

1 Standards Development: An Overview Discovery to Delivery Topic Committee Meeting October 30, 2007 Karen A. Wetzel NISO Standards Program Manager
NISO - An Introduction for New Committees. NISO History Formed in 1939 Originally known as ANSI Committee Z39 ANSI Accredited - Follows ANSI consensus.
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Stephen R Whitesell SC-5 Chair 11/13/2014.
Standards and Certification Training Module B – Process B5Consensus Process for Standards Development ASME S&C Training Module B5 Consensus Process for.
TIA Engineering Manual 6 th Edition Preview and Overview.
HAAGA-HELIA’s accreditation process stages for AACSB Fall 2010Spring 2011Fall The applicant school establishes AACSB International membership.
Overview of NSF Standards Process and Joint Committee Formation Sustainable Water Contact Products Stakeholder Meeting October 30, 2012.
MODULE B - PROCESS SUBMODULES B1.Organizational Structure B2.Standards Development: Roles and Responsibilities B3.Conformity Assessment: Roles and Responsibilities.
1 Presented by Name Date. 2 Mission To enhance the global competitiveness of U.S. business and the American quality of life by promoting and facilitating.
NSF Standards Process Overview GEC Stakeholder Committee September 6, 2012.
11 Accreditation by ANSI as a Standards Developer Presentation to: ICSP & GMF April 30, 2008 Given by: Anne Caldas.
ASME C&S Training Module B5 MODULE B - PROCESS SUBMODULES B1. Organizational Structure B2. Standards Development: Roles and Responsibilities B3. Conformity.
How an idea becomes an IEC standard Gary Johnson Chairman IEC SC45A
TAC July 2, 2003 Market Design Implementation Process Recommendation.
Compliance with the WTO Technical Barriers to Trade Agreement and Steps Toward Developing Good Regulatory Practices Bryan O’Byrne Trade Compliance Center.
GAC-GNSO Consultation Group On GAC Early Engagement in GNSO PDP London Progress Report 22/06/2014.
ASME C&S Training Module B7 MODULE B - PROCESS SUBMODULES B1. Organizational Structure B2. Standards Development: Roles and Responsibilities B3. Conformity.
Submitting Your IEEE Standards Project for Approval Consideration RevCom Presentation PE/IC Meeting 9 November 2009 Prepared by Moira Patterson.
IEEE-SA myBallot TM myBallot ™ IEEE Standards Association New Electronic Balloting System Sponsor Tools.
Why Proposed TC Procedures? Define how TC reaches “completion” of what OASIS calls “Committee Specifications” TC procedures lead up to the OASIS process:
Accredited Standards Committee C63® - EMC 1 Secretariat Update Patricia Roder C63 ® Secretariat May 7, 2015.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 1: Techniques and Developments Zhong Chen SC1 Chair
3GPP2 Publication Process Training TSG-S PMT. December Presentation Overview Background OP Input and Intent Publication Process Overview The Revised.
FGDC Coordination Group Ken Shaffer April 13, 2010 FGDC Standards Process Review Survey.
Due Process – ISSAIs and INTOSAI GOVs Roberto José Domínguez Moro Superior Audit Office of Mexico INTOSAI Working Group on Public Debt June 14, 2010.
TEXAS NODAL Market Design Structure and Process August 19, 2003.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Report to Main C63 Committee Stephen R Whitesell Chair, SC5 November 12, 2015.
Page  ASME 2013 Standards and Certification Training Module B – Process B7. The Appeals Process.
Page © ASME 2016 Module B – Process B8a. US TAG to International Standards Organization (ISO) Standards Development Standards and Certification Training.
IEEE PCIC Standards Working Group Officers’ Workshop IEEE-SA Public Review Overview for Sponsor Chairs, Working Group Chairs and Ballot Designees Pat Roder.
process and procedures for assessments
Sponsor Ballot Process
Accredited Standards Committee C63® - EMC
COMPREHENSIVE PLAN 2017 AMENDMENT PROCESS and DOCKET
Revisions to Codes and Standards
Accredited Standards Committee C63® - EMC
SPEEDING UP THE STANDARDS DEVELOPMENT PROCESS
COMPREHENSIVE PLAN 2017 AMENDMENT PROCESS and DOCKET
2017 Amendments to the INCITS Organization, Policies and Procedures
The Standards Development Process
Standards and Certification Training
Standards and Certification Training
CSAP ORIENTATION FOR NEW MEMBERS
IEEE P Motions at the July Plenary EC Meeting
MODULE B - PROCESS SUBMODULES B1. Organizational Structure
Time Line for Program Reviews
Specification on float equipment
Procedural review of initial WG ballot on P802.1CF
MODULE B - PROCESS SUBMODULES B1. Organizational Structure
Accredited Standards Committee C63® - EMC
IEC Maintenance Committee Report
MODULE B - PROCESS SUBMODULES B1. Organizational Structure
Accredited Standards Committee C63® - EMC
Introduction to Sponsor Balloting using the myBallot™ system
MODULE B - PROCESS SUBMODULES B1. Organizational Structure
Sponsor Ballot Comment Resolution
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [A Brief Overview of Draft Approval.
Specification on float equipment
IEEE MEDIA INDEPENDENT HANDOVER DCN:
Time Line for Program Reviews
TECHNOLOGY ASSESSMENT
Overview of WG Letter Ballot Process
Accredited Standards Committee C63® - EMC
Standards Development Process
802.11F Meeting Report March 2002 Month 1998 doc.: IEEE /xxx
Project Kick-off <Customer Name> <Project Name>
IEEE P Wireless Personal Area Network
Presentation transcript:

Standards Development: An Overview Nettie Lagace NISO Associate Director of Programs nlagace@niso.org

Standards Development Phase 1: Idea to Proposed Work Item Phase 2: Approved Work Item Phase 3: Creating Work Plan Phase 4: Work Plan to Draft Standard Phase 5: Working Draft to DSFTU/Ballot Phase 6: Approval Phase 7: Maintenance

Phase 1: Idea to Proposed Work Item A work item can be proposed by the Topic Committee (TC) if: the item is of sufficient value to warrant NISO’s investment; it fits within NISO’s standards program as defined by the NISO Framework; the standard is feasible from technical, economic, and political viewpoints; no conflict exists with other standards inside or outside NISO; and a working draft can be completed within 18 months.

Phase 1: Idea to Proposed Work Item, cont. Ideas for work items come from individuals, groups, TC plans, etc. The TC must evaluate and respond to formal proposals for standards. The proposed work item (see template) includes: Working Group (WG) charter description of the proposed standard a suggested timeframe for development a description of related standards

Phase 2: Approved Work Item NISO Office circulates proposed work item. Members have 30 days to vote to express interest in the work item. NISO also announces the work item in media to alert interested parties outside the NISO membership. Approval 10% of the membership votes in favor Members voting “yes” join the Voting Pool NISO Office alerts ANSI TC recruits Working Group first the chair, then members formally approves roster

Phase 3: Creating Work Plan Working Group expands Approved Work Item into Draft Work Plan. When Work Plan is approved by TC, WG begins work. Work plans include: WG charge description of the standard or other deliverable scope of work work approach timeline (including proposed completion date) budget

Phase 3: Work Plan (timelines) Work plan timelines typically account for: data gathering development of initial draft review of draft trial use Ballot ballot review final editorial work development of implementation and marketing plans Work should be scoped to fit development of a final standard for ballot or a draft standard for trial use within 18 months.

Reporting to TC WGs must submit quarterly progress reports to the TC and the Architecture Committee for review. Each progress report includes a comparison of work to date with the proposed timeline. A new timeline must be submitted if there is more than a 30-day delay beyond the current work target. A TC may disband any WG that fails to make continuous progress toward completion.

Phase 4: Work Plan to Draft Standard Data Gathering Process for data gathering developed by WG as part of its work plan. Actual work of data gathering should fit in a 3-6 month window.

Phase 4, cont. Data gathering may include: Examining related standards Questionnaires, surveys, or other techniques Interviews that can provide in-depth information from potential users Use cases or other usage scenarios Working prototypes The WG must publish its findings in a public forum and gather feedback before preparing the draft for ballot or trial use.

Phase 4, cont. Preparing the Working Draft Working Group’s responsibility Supported by NISO Office May submit the draft to reviewers for input or include an open comment period in this process

Phase 5: Working Draft to DSFTU/Ballot Submitting the Working Draft Two-thirds approval by the WG is required The WG sends the final standard draft to the Topic Committee with a recommendation that NISO release it as a Draft Standard for Trial Use (DSFTU) or for ballot. WG Chair must include any dissenting votes in the report to the Topic Committee.

Draft Standard for Trial Use (DSFTU) WG recommends the length of the Trial Use to the TC (from 6-18 months). TC must approve (by 2/3 vote) TC posts the document to the NISO website WG must develop an explicit description of the commitment sought from Trial Users WG must monitoring usage during the trial period and responding to information requests and problem reports WG is responsible for recruiting usage of the proposed standard (with assistance of TC & NISO Office). WG must review and reports on trial results, and submit recommended action to TC within 60 days of trial end.

DSFTU: Recommended Actions WG must recommended an action within 60 days of trial period close: Extend the Trial Use period with the current draft. Release the current draft standard for ballot. Revise the standard and re-release the revision for trial use or for ballot. Release the document as a lower-level consensus document, e.g., a recommended practice or technical report. Withdraw the document and disband the Working Group

Balloting NISO Office issues a standard ballot if it gets: two-thirds vote of a Topic Committee, two-thirds vote of the Architecture Committee, majority vote of the NISO Board of Directors. direction of the Managing Director, or petition of five (5) or more NISO Voting Members. Members have 15 days to join Voting Pool Voting Pool must consist of 15% of membership to move forward

Balloting, cont. With sufficient Voting Pool: NISO sends to ANSI for 60-day public review Ballot extends for 45 days NISO alerts Voting Pool members who haven’t voted two weeks before ballot closes Ballot may be extended 45 days in the case of insufficient votes Ballot options: Affirmative Negative, with Comment Abstain, with Reasons

Balloting, cont. At close of ballot, NISO sends report & ballot comments to: Working Group Voting Pool Voting Members Members of public who voted

Phase 6: Approval Approval: majority of Voting Pool and 2/3 votes are affirmative Abstentions and negative without comment are excluded Comments must be addressed and negative votes must be resolved Once approved by membership, NISO submits standard to ANSI approval

ANS Approval Process Excerpted from “American National Standards Process Summary” (May 14, 2007) Stage 1: PINS form to ANSI Announcement of project initiation PINS deliberation if claim of conflict or duplication is raised Stage 2: Approval of draft Consensus body approves text of draft standard Must meet numerical requirements for consensus as described in developer’s accredited procedures (e.g. approval by a majority of consensus body and 2/3 of those voting, etc.) Stage 3: Public Review BSR-8 form initiates announcement in Standards Action. Developer may also announce in industry publications, etc. (multiple public reviews are possible)

ANS Approval Process Stage 4: Comment resolution Public and consensus body member comments Stage 5: Recirculation (if applicable) Unresolved negative comments from consensus body members and public review commenters as well as any substantive changes to the text, must be recirculated to the entire consensus body to allow them to vote, reaffirm a vote or change a vote Stage 6: Appeals at developer level

ANS Approval Process Stage 7: Submittal to ANSI for approval Submittal of final standard for approval with evidence of consensus (BSR-9 form) Stage 8: Notification Notification of final approval/disapproval Stage 9: Appeal at ANSI Hearing is scheduled if appeal is filed

Phase 7: Maintenance A Maintenance Agency (MA) or a Standing Committee may be appointed by the Board at the recommendation of the managing TC MAs and Standing Committees report to a TC or to the Architecture Committee MAs and Standing Committees respond to requests for change, clarification, or interpretation Periodically maintained standards are sent for reaffirmation ballot every 5 years Maintenance plans should be created, at least in part, by the WG during development for standards that require ongoing maintenance activities

Resources NISO Operating Procedures PDF: 2009 http://www.niso.org/apps/group_public/download.php/3246/NISOprocedures_ansiapproved9dec09.pdf ANSI Documents ANSI Essential Requirements: Due process requirements for American National Standards PDF: 2013 http://www.niso.org/apps/group_public/download.php/10932/2013_ANSI_Essential_Requirements.pdf NISO Proposed Work Item Template PDF: 2008 http://www.niso.org/standards/NISOProposedWorkItemTemplate.pdf