ESTIMATING AND COSTING OF DOMESTIC INSTALLATION

Slides:



Advertisements
Similar presentations
UNIT 31 HOME ELECTRICAL SYSTEM
Advertisements

Electrical Installation-Module 3
Electrical Installation
Basic electrical circuitry & applications
BS7671 Formula and Tips.
DAY 4 CHAPTER 3 CONDUCTOR SIZES,TYPES, ETC.. Continuous Load. A load where the maximum current is expected to continue for 3 hours or more. Continuous.
CIRCUIT ARRANGEMENT (Note: All the mentioned tables in this course refer to, unless otherwise specified, Low Voltage Electrical Installation Handbook,
Slides on Drawing Lecture-1
EET Survey of Electronics
Electrical Power Systems
Domestic Installation: Switch Circuits
CON 4003 Construction Estimating Prof R. V. Locurcio.
The Home Inspection Book: A Guide for Professionals By Marcia Darvin Spada Copyright, Thomson/South-Western, 2003, Revised, 2006.
By Carlin Bright. Electricity The flow of electrons in a conductor.
Electrical Review Electricity Resistance Insulator
MINIMUM ACCEPTABLE LEVELS OF SAFETY & RELIABILITY
TTS 171 : PART 1: 2002 ANNEX E PRESENTER WINSTON THOMAS ELECTRICALINSPECTOR 1 ELECTRICAL INSPECTOR 1.
HASMUKH GOSWAMI COLLEGE OF ENGINEERING HASMUKH GOSWAMI COLLEGE OF ENGINEERING BRANCH :- ELECTRONICS & COMMUNICATION.
Electrical Contractor
COMMERCIAL ELECTRICAL (Chapter 11)
CHAPTER 2 FINAL CIRCUIT AND LOAD ESTIMATION
EXAMPLE ELECTRICAL DESIGN OF A SMALL OFFICE
Gandhinagar Institute of Technology
NGfL CYMRU GCaD ELECTRICAL WORKS DISCLAIMER Neither WJEC or NGfL accepts any responsibility whatsoever for any injury, however caused,
SARDAR PATEL INSTITUTE OF TECHNOLOGY, PILUDARA Rakholiya bhavdip : [ ] Gevariya balkrushn : [ ] Patel parth : [ ] ( Branch:
Home Electrical Systems. Behavior Objectives  Define the basics of Electrical Systems  Explain the basic principles of Electricity.  Describe the different.
Complex Circuits Notes Series Circuit + Parallel Circuit = Complex Circuit.
Ag. Mechanics for Beginning Teachers
Testing of Low Voltage Installations
DOMESTIC ELECTRICAL CIRCUITS National Diploma Mechanical and Electrical Services Construction.
ELECTRICAL INSTALLATION IN BUILDING
HOUSE WIRING Final Review. Electricity Electricity = flow of electrons Conductor= electricity passes thru easily - Metal, water, person Insulator = restricts.
Installation of Heating, Cooling, and Refrigeration Systems Electricity for Refrigeration, Heating and Air Conditioning 7th Edition Chapter 8 Installation.
HOUSE WIRING NOTES. Electricity  Proton – positive charge  Electron – Negative charge  Electricity = flow of electrons Conductor= electricity passes.
Residential Wiring Unit 3 – Installation and Planning.
ELECTRICAL WIRING WIRING BASICS Written by Bobby Joslin
C.K.PITHAWALA COLLEGE OF ENGINEERING & TECHNOLOGY,SURAT Branch: Electrical Semester : 5th Group No. 15 Subject :- Element Of Electrical Design.
ELECTRICAL INSTRUMENTS ( service and utilization )
Domestic Circuits – Learning Outcomes
Every electrical system must have three parts, a source, a load, and a circuit.  Source - the origin of electrical potential, such as a battery or 120.
Residential Wiring Unit 3 – Installation and Planning Chaps 9-12.
UNIT-5. ELECTRICAL SAFETY, WIRING & INTRODUCTION TO POWER SYSTEM
4.0 DOMESTIC ELECTRICITY Domestic electricity is that electricity which is supplied to homes under specific conditions of current and voltage. Voltage,
Systems Of Wiring Buildings
Electric Wiring & Illumination
Agricultural Science Career Development Event Electric Power
EV DOMESTIC CHARGING UNIT
EV DOMESTIC CHARGING UNIT
License Examination Practice Drill
Introducing Current Electricity
UNIT V–ELECTRICAL SAFETY, WIRING &INTRODUCTION TO POWER SYSTEM
Basics of electrical engineering
5.3 : BUILDING ELECTRICAL SUPPLY
INDUSTRIAL INSTALLATION.
Installation And Estimation of Service Connection
ANNEX E PRESENTER WINSTON THOMAS
Engineering Project Cable Management.
Govt. Polytechnic,Manesar
EET 323 – Electrical System Design Lecture 9: Grounding
Contactor A contactor is an electrically controlled switch (relay) used for switching an electrical power circuit. A contactor is typically controlled.
Conductor A material, such as copper, that permits the flow of electricity; usually refers to the a wire.
EE-4TH SEMESTER ESTIMATING AND COSTING.
Smitty’s Two Minute Drill Grounding and Bonding
Objectives Learn about Electricity Pricing Electric systems.
Objectives Review conductor and conduit selection
Wiring Circuits Lesson Plan PSTS: C6-7.
ELECTRICAL INSTALLATION
Household Circuits Can u count how many different things your home require electrical energy? You cant see the wires because they are hidden behind your.
Smitty’s Two Minute Drill Services, Feeders, and Branch Circuits 1
Presentation transcript:

ESTIMATING AND COSTING OF DOMESTIC INSTALLATION BASIC CONCEPTS AND IE RULES

DOMESTIC INSTALLATIONS Electrical installations is used for both Industrial and non industrial buildings. Electrical networks in industrial buildings serve the purpose of distributing the required power to the consuming points where it is used for multitude of purposes in the industry. (b) Non industrial buildings include domestic dwellings ,office,buildings, shopping and commercial centres institutions, medical establishments, hotels and sports buildings etc.

WIRING ACCESSORIES Fuse (Re-wirable fuse, MCB, etc) Sockets & switches Weatherproof cables Ceiling rose Ceiling plate Pendant holder Earthing thimbles Combination switch plates Junction boxes Hand tools PVC casing & caping Fasteners Distribution board Protective devices like ELCB , Main switch , MCB etc

Main SWITCH MAIN SWITCH – It is a control equipment which connect or disconnect the main supply. A iron clad main switch which operate phase & neutral simultaneously has a fuse and a neutral link. For single phase DPIC(Double pole iron clad) main switch with fuse and neutral link is used. For three phase TPIC(Triple pole iron clad) main switch with three fuse and neutral link is used.The rating for main switch for single phase supply is 5A, 10A, 15A, 30A upto 250 V. For three phase ratings are 30A, 60A, 100A, 200A, 300A upto 500V. The thick wire is used for the neutral link. The main switch rating is calculated by multiplying the full load current of a subcircuit by 1.5

Distribution board It is used to distribute the supply from the main circuit into various circuit & sub- circuits .

Selection of wire Minimum size of cable or insulated wire for mechanical reasons. Voltage drop Current carrying capacity Type of insulation used i.e. VIR, PVC, TRS etc. Grade i.e. 250 volts, 500 volts, 660 volts grade etc.

Electrical wiring code PVC insulated Aluminium conductor wire OF size 1.5mm^2 or 1/1.40mm diameter used for wiring light/fan/5amp. socket points. (b) OF size 4mm^2 or 1/2.24mm diameter used to wire 15 amp socket points. (c) OF size 6mm^2 or 1/2.80 diameter used to wire 15 amp socket points to be used for geysers ,electric oven or other heavy loads.

Sequence to be carried out for estimate. Drawing the installation plan. Calculation 0f total load in Amp. Selection and rating of main switch & sub main switch Selection & rating of main distribution board . Calculation for the length of conduit pipe. Calculation for the length of phase and neutral wire. Calculation for the length of earth wire. Preparing the material table.

CALCULATION OF LOAD Tube point - 1x40 = 40 watt Lamp point – 1x100 = 100 watt Fan point - 1x 60 = 60 watt 5 amp socket – 1x100= 100 watt Total load in amperes = 300/230 = 1.3 A Selection of main switch – Here a D.P.I.C Main switch of 5.Amp Rating 250 volt grade is selected.

ASSUME Total height from floor to ceiling = 3.5 mt. Height of horizontal run from floor = 3.0 mt. Height of switch board from floor = 1.5 mt. Light and tube points from ceiling = 0.5 mt. HR = Horizontal run i.e conduit running parallel to floor half metre below ceiling. VR= Vertical run i.e wires or conduit running between switch board and HR.

CALCULATION FOR LENGTH OF CONDUIT PIPE OF 20mm diameter From SB to HR = 1.5 mt. From entry of circuit into room i.e along H.R upto middle of room = 2.0 + 0.5 = 2.5 mt. From H.R to Lamp point = 0.5(Rise) + 4.0 + 0.5(drop) = 5.0 mt. From fan to tube point = 2.5 + 0.5(drop) = 3.0 mt. Total length of conduit pipe = 12mts. Taking 10% wastage = 1.2 mt. Total length of conduit pipe required for wiring the room = 13.2 mt. say 13.0 mt.

CALCULATIONS FOR LENGTH OF PHASE WIRE From point of entry of circuit into room upto SB = 2.0(H.R) + 1.5 (H.R) = 3.5 mt. From SB upto fan = 1.5(V.R) + 0.5(H.R) + 0.5(rise) + 2.0 along ceiling upto fan = 4.5 mt. From SB to lamp = 4.5 mt (upto fan) + 2.0 + 0.5(drop) = 7.0 mt. From SB to tube point = 4.5 upto fan + 2.5 upto ceiling + 0.5(drop) = 7.5 mt. Total length of phase wire = 22.5 mts.

CALCULATION FOR LENGTH OF NEUTRAL WIRE From point of entry of circuit into room upto switch board = 2.0 along H.R + 1.5(V.R) = 3.5 mt. From SB to fan = 1.5 + 0.5 + 0.5(rise) + 2.0 along ceiling = 4.5 mt. From fan to lamp point = 2.0(along ceiling) + 0.5(drop) = 2.5 mt. From fan to tube point = 2.5 + 0.5 (upto tube point) = 3.0 mt. Total length of neutral wire = 13.5 mts.

TOTAL LENGTH OF WIRE Total length of wire required for wiring the room (phase + neutral) = 22.5 mt. + 13.5 mt. = 36 mts. Allowing 15% extra for wastage and connections = 5.4 mt Total wire required for wiring the room = 36.0 + 5.4 = 41.4 mts. say 41 mts.

CALCULATION FOR LENGTH OF EARTH WIRE The earth terminal of the socket outlet is solidly connected to the switch board with a 14 SWG, earth wire through an earthing thimble. Earth wire of 14 SWG (Say 0.25 mt) will serve the purpose.

LIST OF MATERIALS Conduit pipe 20mm dia. Qty -13 mt. PVC insulated, aluminium conductor, single core 250 volt grade of size 1.5mm^2 or 1/1.40 mm dia. Qty- 41mt. Earth wire 14 S.W.G GI. Qty - 0.25 mt. Iron clad, concealed type, switch boards, with bakelite sheets 20cm x 25cm. Qty – 1 No. Conduit pipe accessories for 20mm dia conduit 1 way junction box. Qty - 2 Nos. 2 way junction box. Qty – 1 No. 3 way junction box. Qty – 2 Nos. Conduit bends. Qty – 3 Nos. Conduit nuts hexagonal to fix conduit with SB . Qty – 8 Nos. Conduit sockets to connect two pieces of conduit. Qty – 8Nos.

LIST OF MATERIALS Switch, 5 amp rating. Qty – 4 Nos. Socket , 5 amp rating . Qty – 1 No. Ceiling roses, 2 – plate, bakelte. Qty – 2 Nos. Junction box covers. Qty – 2 N0s. Lamp brass bracket with holder. Qty – 1 No. Earthing thimbles. Qty – 1 No. Hexagonal headed bolt and nut 6 mm dia. 25mm long for fixing earthing thimbles with switch board Qty- 1 No. Labour charges @ 20.00 per point for 4 points Miscellaneous expenses @ 10% of total cost. (including supervision charges) Apply the suitable rates for the materials and the calculate the - Total cost of wiring Rs________