Saturday 09:40 Stable beams #1369 (56 bunch scheme)

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Friday, h10: Stable beams at 1.38 TeV. 09h03: Beam dump.  One bunch dropped too much in intensity and gave BPMS interlock (dump protection). 10h36:
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
LHC progress Report LHCC Wednesday 23 rd March 2011.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Thursday 25/11/10 & Night Work on: 16:15 Inject fill #1520
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Monday fill with 1092 bunches (6 h stable beams)
Saturday 30th June - Sunday: Rocky !
LHC Morning Meeting - G. Arduini
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
Thursday morning – optics correction
Tuesday TOTEM and transverse loss map (1) OK
Summary of Week 11: 14 – 21 March
LHC Status Su Morning 17-April R. Assmann, B. Holzer et al
LHC Operation Week 38 Coordination G.Arduini, R.Bailey
Summary of Week 16 G. Arduini, J. Wenninger
Lost at 12:05 to power converter (RTQX2.R1) problem
Friday 31st August & night
Thursday 10th May - morning
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday morning 10:30 Optics measurements and corrections.
Wire almost entirely through beam before BLM triggers dump
Saturday – Morning 7:36 beams dumped
Tuesday 9th November 10:02 Fill beams dumped
Finally.... We had to wait a long time.... We had many problems....
Friday Morning 7:30 injection for fill 2908
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Saturday 7th May Sat – Sun night
(on behalf of the LHC team)
Summary Thursday h21: Stable beams fill #1303.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
LHC Morning Meeting - G. Arduini
Thu 6/4 End of fill #2470. ~1 pb-1 in 4 hours. Dumped by CMS BCM.
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Thursday Fill 1364 (24 bunch) dumped at 07h
Saturday Nov Stop proton operation. Switch back to ions
Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped (after ~14h of collisions) Some issues during refill.
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Thursday 22 September 2011.
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
Summary Tuesday h23: Machine closed. Precycle started.
Sat 15/10 New record bunch population profiting of the scrubbing period on Friday. Nb~1.42x1011p/bunch  110 MJ at 3.5 TeV. Filling slowed down by ZS sparking.
Wednesday 16th May 03:05 beam dump, RF fault crowbar problem on module M1B2 06:09 Another crowbar at injection. Access for RF; problem Beam Imminent Warning.
Fri :52 Stable beams fill #2536
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Wednesday h18: 228b fill lost just before start of ramp.
Another Immortal Fill….
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Saturday Luminosity production 1380 bunches
Tuesday End of fill 1393 Movement of suspicious Roman pots OK
Saturday 26 November 2011.
HI2011 Commissioning Status
Monday 152 bunch operation summary
Wednesday Following the struggle with the vacuum in IR2 over the night, drop intensity to 1.2E11/bunch. Fill first B1 – pretty quiet – then B2 – quite.
Presentation transcript:

Saturday 09:40 Stable beams #1369 (56 bunch scheme) 11:06 Another fast loss when moving the Roman Pots although they were still out  Movement of the Roman Pots only towards the end of a fill in the future. from Alice, they're not fully finished with the checks... but they seem to be fine! No more parasitic collisions! 11/12/2018 LHC status

Stable beams #1369 Injection still not very clean Initial luminosity compatible with emittance of ~2.9 mm Emittances at the beginning of the ramp B1H/V: 2.2/2.1 B2H/V: 2.6/2.9 11/12/2018 LHC status

Stable beams #1369 Difference between BRAN and experiment luminosity readings. BI working on that. 11/12/2018 LHC status

Fast loss #9 11:06: Fast beam loss while moving the Roman Pots (still very far out). Already happened once on 14/8 also during movement of the roman pot and near miss during Roman Pot alignment. Risetime of 0.4 ms, signal relatively strong at 0.3 G/s. Spike in the top and bottom V pot of the far unit XRPV.B6R5.B1. Nothing was seen in the H pot. The near unit was not on. 11/12/2018 LHC status

Saturday 12:00 Filling with 104 bunches for LSS6 BPM test and injection verification 14:00 LSS6 BPM test completed 15:00 1013 p per beam at injection Ramp Beams dumped - TCDQ.B2 not ramping Investigations and tests on TCDQ Problem related to sending data to TCDQ when not in a wait state Possibility to get TCDQ in a state where it looks armed but does not respond to timing Modifications to sequence to prompt for checks and add delays before sending settings In longer term modifications needed on the equipment driver to protect against this 11/12/2018 LHC status

LSS6 BPM LSS6 BPM test done: The bump of 1.2 mm (trim) ran for 80*20 ms = 1.600 s when the beam was dumped. We dumped at around 2 mm with the interlock set to 1.5 mm (known offset of 0.5 mm). System 'B' dumped as expected. Analysis of the reaction time to be completed 11/12/2018 LHC status

Injection Re-steering done for B1 & B2: Some improvement. Not yet robust 11/12/2018 LHC status

104 bunches > 1013 p !. Still problems with the DC BCT for BOTH beams 11/12/2018 LHC status

Saturday 17.30 Filling fill 1372 Emittances before ramp B1H/V: 2.1/2.2 B2H/V: 2.3/2.8 Tune feedback stopped between 1 and 2 TeV B1 5.5 MJ per beam ! Squeeze Lifetime low around 5cm B2 down to ~1h Collisions Luminosity 3.5 1031 Emittance of ~2.8 mm 11/12/2018 LHC status

Sunday Fill 1372 still running Luminosity after 13 hours One cavity (7B1, 3B1) switched off a few times, restarted OK Luminosity after 13 hours Luminosity 1.5 1031 Corresponds to an emittance of ~4.5 mm more blow up than fill 1366 (56 bunches) Integrated luminosity over 1pb-1 Extended lumi scans for emittance measurements Refill for physics Q feedback Damper 11/12/2018 LHC status

Fill 1372 11/12/2018 LHC status

Fill 1372 intensities and losses IPs: 1 5 2 8 - 1 5 8 - 1 5 2 - 1 5 - 2 8 - 8 11/12/2018 LHC status

To fit in later Transverse damper firmware update (to prevent glitches positions very close to 0) – W. Höfle Test of luminosity optimization software - S. White Gas Ionization Profile Monitor tests - M. Sapinski Abort gap cleaning – M. Meddahi Test of new beam presence flag system – M. Gasior DC BCT – P. Odier Q kicker – R. Barlow CO security intervention to be scheduled - A. Bland 11/12/2018 LHC status