Barhale Procedure for Site Establishment

Slides:



Advertisements
Similar presentations
Safety Absolutes Green Lake
Advertisements

Practical Preparations Planning for Safety and Emergencies.
Managing the Health and Safety of Contractors
Working at Height - Ladders. Legislation The Work at Height Regulations 2005 Ladders can be used for short duration work when: the risk assessment shows.
Emergency Preparedness and Response
Background Presenters Work done in preparation for WHS changes
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
Emergency Evacuation Zayed University, Dubai Campus.
Radiological Emergency Procedures FOR ALL ISOTOPES 1.Prevent others from entering the affected area or coming into contact with the potentially radioactive.
Hazard Communication 29 CFR Compliance Training Presentation.
What to Do When an Event Occurs at Jefferson Lab When an unanticipated event occurs, there are a number of steps that need to be taken to assure the injured.
Safety & Security Contractor Induction Property Management.
OSHA Office of Training and Education 1 Hazard Communication.
Contractor Induction Program Gippsland Southern Health Service is committed to a safe and healthy work environment.
Aircraft Accident Investigation AST 425. Accident investigation Who is involved in an aircraft flight prior to an accident: Pilots Passengers ATC/FSS.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
OSHA Office of Training and Education 1 Hazard Communication.
Gauges and well logging
UKATA EMERGENCY PROCEDURES These slides are designed to assist UKATA members in the delivery of Category A – Asbestos Awareness Training when dealing with.
Control of Substances Hazardous to Health Regulations 2002 (COSHH)
SHE Code 4: Safety and Safe Use of Work Equipment
Health and Safety.
UK’s CDM Regulations 2007 and its Applications in Singapore
Contractor & Owner Roles in Health & Safety. Safety Topics Contractor Role in Health and Safety Owner Role in Health and Safety.
Incident Reporting Procedure
Managing Pre-Hospital Exposures PRODUCED BY RI Department of Health, Division of EMS & Hospital Association of Rhode Island.
Construction Health and Safety Management By Dr Simon Smith – licensed under the Creative Commons Attribution – Non- Commercial – Share Alike License.
Process Safety Management
Authorization and Inspection of Cyclotron Facilities Inspections.
OSHA Office of Training and Education 1 Hazard Communication.
Hazard Communication Training Program “Right-to-Know” Program.
The driver of a vehicle is responsible for the vehicle assigned to him/her. Follow these regulations when operating a vehicle on company business: Operate.
Office of Risk Management Annual Conference. AGENDA  Remembering 2009  Types of Claims Handled by the Property Unit  What to do after a loss  How.
Level 2 Award in Employability Skills
1. Objectives  Describe the responsibilities and procedures for reporting and investigating ◦ incidents / near-miss incidents ◦ spills, releases, ◦ injuries,
Emergency Management & Business Continuity Plan Odyssey House of Utah Last Update: March 2010
Preventing Slips & Trips at Work
Hazard Communication. Introduction !About 32 million workers work with and are potentially exposed to one or more chemical hazards !There are approximately.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Regulatory Authority.
Site Layout constructionsite.
HAZARD COMMUNICATION. Most Frequently Cited Violations In The Workplace n Written Hazard Program n Information & Training n Material Safety Data Sheets.
What is a safe work permit? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific.
OSHA Office of Training and Education 1 Hazard Communication.
CDM Construction Design and Management
04-25 Right to Know Right to Know  General  The purpose of this guideline is to insure that the Brunswick Fire Company No. 1 provides a safe.
OSHA Office of Training and Education 1 Hazard Communication.
Chicago Area Facilities (CAF) Ground Disturbance and Excavation Procedure.
Every employer must ensure, as far as is reasonable practicable, the health, safety and welfare of all his employees More specifically, employers must.
Emergency Preparedness. Proposed Emergency Preparedness Rules NFR/LMC §19.326(a) deleted and moved to § for Emergency Preparedness Rules Places.
Cooling Tower Audit Nathan Maple City of Marion. Why do we undertake an audit and sampling? Regulation 15 South Australian Public Health (Legionella)
Applying for ethical approval
Incident Reporting And Investigation Program
Designated substance requirements
Bloodborne Pathogens - General
Maintaining Safety Standards
Administration of a FIDIC Contract - Project Control
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
UCG- TAG OUT LOCK OUT.
Occupational Radiation Protection during High Exposure Operations
Maintaining Safety Standards
Safety and Security of Radiation Sources
Oleh : Ir. Sjaifuddin Thahir, MSc.
Incident Reporting And Investigation Program
OHS–Occupational Health & Safety
Oleh : Ir. Sjaifuddin Thahir, MSc.
Construction Safety Council Breaking New Ground February 7, 2001
Operationalizing Export Certification and Regionalization Programmes
Recording Clinical Data
OSU Controlled Substances Training Module for Researchers
Presentation transcript:

Barhale Procedure for Site Establishment Procedures, Risk Assessments and Information

Contract Initiation As part of the contract initiation procedure the contract manager responsible for the contract is prompted to carry out an investigation in order to establish the presence of underground services by contacting the local authorities, utility owners and “Linesearch”

Site Establishment A site specific risk assessment is carried for the establishment of all site compounds and where necessary SSOW developed.

Site Establishment Before any work commences a photographic survey is carried out which includes a written record. Individual properties may require an independent structural survey depending on the location and nature of the works. If this is deemed necessary it must be carried out with the consent of the property owner and the client. Before work commences on site any parties who will be affected by the works must be notified of our intention to commence work. Footpaths or roads that will be closed or obstructed must have signs, barriers etc, warning pedestrians and road users of these hazards.

Site Establishment Landowners must be notified particularly if land with livestock present is to be entered. Statutory undertakers with plant that will be affected by the works must be notified. Any structures which cannot be removed for the duration of the works and which may be affected by the works i.e. buildings, trees, overhead cables must be protected to avoid accidental damage. Once the site boundaries have been set out they must be treated in accordance with the contract to make the works safe and secure. Fencing with lockable gates shall be provided in every case where possible. Any items or materials which may be re-used on the site, or which may be contaminated or damaged as a consequence of the works, should be removed and stored in a safe area, so that it may be replaced upon completion of the works.

Site Establishment 1) Office accommodation Establish all accommodation on site including: 1) Office accommodation 2) Welfare facilities 3) Storage for materials, tools, plant etc. 4) First aid Once established depending upon location and nature of the contract the security of the compound, offices, plant etc. shall be considered and if necessary security arrangements to protect against theft and vandalism. Where hazardous materials are to be kept on site, storage facilities must be provided to prevent unnecessary exposure to either employees or the public.

Site Establishment Storage facilities must be in accordance with the manufacturers COSHH data sheets, the Company’s COSHH assessments and all relevant legislation. Services to the site must be provided as soon as practicable. If the statutory undertakers cannot provide these services, temporary supplies may be provided utilising generators, bowsers, mobile phones etc. For emergency purposes the address and telephone number of the nearest hospital (with accident and emergency facilities) should be obtained and displayed in a prominent place. It is also preferable that the emergency services e.g. police, fire and ambulance are contacted to advise them of any high risks associated with the works e.g. compressed air, explosives etc.

Site Establishment To maintain security during the course of the contract arrangements must be made to regularly inspect and maintain boundary fences etc. Arrangements should be made to regularly clean and maintain all offices and welfare facilities. The works should be reinstated in accordance with the specification and the contract documents. All damage done as a consequence of the works is to be reinstated to the satisfaction of the Engineer and third parties involved. Where ground is contaminated with unwanted material this is to be removed from the site to an approved tip and replaced with uncontaminated materials.

Site Clearance Disconnection of services The Site Representative must notify the statutory undertakers when the services to the site are no longer required. The Site Representative will be responsible for taking final meter readings and including these on the MRS sheets and provide the information to the Contracts Manager for the completion of contract completion form Before removing any fencing it must be established if the fence may be removed or whether it is required to be left in place until the end of the maintenance period. Upon removing it, all post holes etc. must be filled with specified materials and all the fencing removed off site. Upon finally leaving site, all advance warning signs must be removed from site together with contract sign boards etc. Prior to leaving site all roads and footpaths shall be checked for cleanliness and fitness for use by the public and where possible photographs taken

Site Clearance Documentation and records Pre-entry survey One copy in site file One copy to client One copy to Contracts Manager for contract file