Frame Exchange Control for Uplink Multi-user transmission

Slides:



Advertisements
Similar presentations
Submission doc.: IEEE 11-14/0802r0 Consideration on UL MU transmission Date: Slide 1Jinyoung Chun et. al, LG Electronics July 2014 Authors:
Advertisements

Doc.: IEEE /1244r1 Submission Nov.2010 Sun Bo, ZTE CorpSlide 1 Authors: Transmission Mechanism in MU-MIMO Date:
Slide 1 doc.: IEEE /1092r0 Submission Simone Merlin, Qualcomm Incorporated September 2010 Slide 1 ACK Protocol and Backoff Procedure for MU-MIMO.
Submission doc.: IEEE /1186r2 September 2014 Pengfei Xia, Interdigital CommunicationsSlide 1 Comparisons of Simultaneous Downlink Transmissions.
Discussion on OFDMA in HEW
Doc.: IEEE /1190r2 September 2014 Submission Kaiying Lv (ZTE) Frame Exchange Control for Uplink Multi-user transmission Slide 1 Date:
Submission doc.: IEEE /0091r1 January 2015 Woojin Ahn, Yonsei UniversitySlide 1 UL-OFDMA procedure in IEEE ax Date: Authors:
Beamformed HE PPDU Date: Authors: May 2015 Month Year
Submission doc.: IEEE /0091r0 January 2015 Woojin Ahn, Yonsei Univ.Slide 1 UL-OFDMA procedure in IEEE ax Date: Authors:
Submission doc.: IEEE /1454r1 November 2014 Jarkko Kneckt (Nokia)Slide ax Power Save Discussion Date: Authors:
Doc.: IEEE /1431r1 Submission September 2014 Issues on UL-OFDMA Transmission Date: Authors: Slide 1.
Uplink Multi-User MIMO Protocol Design
Submission doc.: IEEE /1454r0 November 2014 Jarkko Kneckt (Nokia)Slide ax Power Save Discussion Date: Authors:
Doc.: IEEE /0587r0 Submission May 2015 Uplink ACK and BA Multiplexing Date: Authors: Slide 1 NameAffiliationsAddressPhone Reza.
MTBA and PSMP in n Abhay Annaswamy
Submission Vida Ferdowsi, NewracomSlide 1 doc.: IEEE /0856r0July 2015 Compressed Uplink Trigger Frame Date: Authors:
Submission doc.: IEEE /1096r0 Sep 2015 John Son et al., WILUSSlide 1 Recovery Procedures in Cascading Sequences Date: Authors: NameAffiliationsAddressPhone .
Submission September 2015 doc.: IEEE /1328r0 November 2015 Yujin Noh, Newracom Slide 1 Scheduling Information for UL OFDMA Acknowledgement Date:
Submission doc.: IEEE /1097r1 September 2015 Narendar Madhavan, ToshibaSlide 1 Reducing Channel Sounding Protocol Overhead for 11ax Date:
Doc.: IEEE /0843r1 July 2015 Submission(ZTE) UL MU Random Access Analysis Date: Slide 1 Authors: NameAffiliationAddress Yonggang.
Submission doc.: IEEE /1349r0 November 2015 Sungho Moon, NewracomSlide 1 Sounding for Uplink Transmission Date: Authors:
January ay Frequency Multiple Access in 11ay Date: Slide 1LG Authors:
January 2016 doc.: IEEE /0095r1 Frequency Multiple Access in 11ay Date: Slide 1LG Authors:
Doc.: IEEE /1121r0 Submission HE A-Control field Slide 1 Date: Authors: Alfred Asterjadhi, et. al. September 2015.
Submission doc.: IEEE /0674r0 May 2016 Hanseul Hong, Yonsei UniversitySlide 1 EIFS excess problem of Acknowledgement for UL MU procedure Date:
Doc.: IEEE /0048r0 SubmissionSlide 1Young Hoon Kwon, Newracom Protection using MU-RTS/CTS Date: Authors: January 2016.
Submission doc.: IEEE /0961r0 July 2016 Hanseul Hong, Yonsei UniversitySlide 1 Consideration on Multi-STA BlockAck Optimization Date:
DL-OFDMA Procedure in IEEE ax
Location Measurement Protocol for Unassociated STAs
MU BAR Frame Format Date: Authors: November 2015 Month Year
MCS, NSS, BW and PPDU selection for 11ax
Joint Proposal MAC Report
Locationing Protocol for 11az
Compressed Uplink Trigger Frame
Comparisons of Simultaneous Downlink Transmissions
Scheduling Information for UL OFDMA Acknowledgement
How to collect STAs’ Tx demands for UL MU
WUR MAC issues follow-up
RTS*/CTS* for UL/DL OFDMA Control
ACK Protection Schemes for the IEEE ac MU-MIMO Downlink
January 2012 Discussions on the better resource utilization for the next generation WLANs Date: January 17th, 2012 Authors: Name Affiliations Address Phone.
MAC Capabilities Info. in HE Capabilities IE
RTS*/CTS* for UL/DL OFDMA Control
MAC Clarifications Date: Authors: September 2016
Regarding HE fragmentation
Discussion on CR for CID 5066
Duration/ID field in UL-MU
DL MU-MIMO ack protocol
Data field in HE PPDU Date: Authors: September 2015
Multi-AP Transmission Procedure
DL MU MIMO Error Handling and Simulation Results
Explanations for CR on NDP feedback report
Multi-AP Transmission Procedure
ACK Protection Schemes for the IEEE ac MU-MIMO Downlink
Additional Measurements & Analysis Confirming the RLAN Duty Cycle
UL MU Random Access Analysis
PS-Poll TXOP Date: Authors: Month Year
Considerations on MU-MIMO Protection in 11ac
Fix the Issue on Number Of HE-SIG-B Symbols
TGbb MAC Channel Access features proposal
Error Recovery Scheme for Scheduled Ack
TGbb MAC Channel Access features proposal
Multiplexing of Acknowledgements for Multicast Transmission
Enabling Persistent Allocation for EHT
Enabling Persistent Allocation for EHT
HE NDP Frame for Sounding
Location Measurement Protocol for 11ax
Enabling Uplink Persistent Allocation for EHT
A unified transmission procedure for multi-AP coordination
Discussion on Multi-link Acknowledgement
Presentation transcript:

Frame Exchange Control for Uplink Multi-user transmission

Background In the 11ax PAR, it is said that “the project may include the capability to handle multiple simultaneous communications in both the spatial and frequency domains, in both the uplink (UL) and downlink (DL) direction”, [1]. DL MU-MIMO has already been supported in 11ac. UL multi-user transmission was discussed in previous meetings, including UL MU-MIMO and UL OFDMA. UL MU transmission is identified as a candidate technology to improve the network efficiency in dense deployment case. The feasibility of supporting OFDMA and UL MU-MIMO has been analyzed in [2] and [3].

Motivation A general UL MU transmission procedure has been introduced in [3]. However the detailed scheme for UL MU transmission has not been discussed yet, in particular: Multi-user polling and information indication The policy for multiple frame transmission in a UL MU TXOP Multi-user acknowledgement Error recovery In this contribution, we propose the rules for UL MU transmission in a TXOP.

Analysis The following issues should be considered to define a complete UL MU transmission protocol Multiple UL MU transmission procedure in a TXOP How to schedule multiple frame transmission in a UL MU TXOP, and control the procedure with less overhead Multi-user acknowledgement When AP receive multiple STAs’ UL frame, how to send the acknowledgement frame ? Sending in parallel or serial ? Error recovery When UL MU data fails, STA or AP which one initials the error recovery procedure? Is error indication needed? Flexible UL MU transmission scheduling How to schedule new STAs during a UL MU TXOP

Considerations for UL MU transmission control AP’s responsibility in UL MU transmission Schedule or contend channel time for UL MU transmission Poll multiple STAs’ UL data and sending ack to multiple STAs. Initiate the error recovery procedure Provision assistant information for UL MU transmission Power control Time and frequency synchronization STA’s responsibility in UL MU transmission Waiting AP’s polling before UL MU transmission Send UL PPDU with power/time/frequency adjustment if AP indicated these information to the STA send UL PPDU with a time length which is determined by AP Easy for AP to control the transmission within the TXOP limit Easy for AP to acknowledge multiple STAs at a same time

Multi-user acknowledgement and Polling A scheme is needed to allow multiple UL MU transmissions with purposes such as: acknowledgement Polling and resource allocation error indication transmission control indication eg. time/frequency/power adjustment Principle and justice To achieve the above purposes with less overhead To keep compatibility with legacy devices A scheme using multi-user BA+Poll frame is introduced The multi-user BA + Poll frame combines the functions of BA, scheduling control error indication The multi-user BA + Poll frame can reuse the current BA frame structure The multi-user BA + Poll frame can be sent in non-HT format No additional scheduling/poll frame needed

Multi-user acknowledgement and Polling The multi-user BA+Poll frame used during a UL MU TXOP can: acknowledgement the previous UL MU transmission schedule the next UL transmission for the current group The Duration/ID field can be reused for the next UL MU PPDU TxTime calculation

Error Recovery When one of the UL MU STAs’ data fails, AP can use the multi-user BA+ Poll frame for error recovery indicate receiving failure to the transmitter, a null BA information field can be used as shown in slide 12 both error indication and scheduling can be combined in same BA +Poll frame a STA can trigger retransmission in the next UL MU transmission when receiving the failure indication

Schedule new user(s) during the UL MU TXOP AP can use the multi-user BA+ Poll frame to poll a new STA within the UL MU TXOP Poll new STA(s) for UL MU transmission Indicate the time/frequency/power adjustment information and UL resource allocation for the new STA(s)

Scheduling STAs at the beginning of a TXOP AP can use the multi-user BA+Poll frame as a UL MU scheduling frame that transmitted as a initial frame of a TXOP. When transmitted as a scheduling frame, the multi-user BA+Poll frame is no longer a control response frame The new BA can use the null BA information fields to schedule multi-users of the UL MU TXOP, example of the null BA information fields is shown in slide 12

Example of multi-user BA+Poll frame structure Multi-user BA+Poll is almost the same as multi-TID BA We can use FC filed to indicate the new frame type or use the BA control field to indicate the new BA variant Each STA corresponds to a BA information field, the BA information fields can be a BA+Poll or a null BA The polling bit indicated whether the corresponding STA is permitted to transmit in the following UL MU PPDU AP can base on the STA’s buffer status which is indicated in more data or other fields in UL data frame to determine the value of polling bit for this STA

Example of null BA information fields This field doesn’t contain the acknowledgement information for corresponding STA This field can include the time/frequency/power adjustment information and UL channel resources allocation information, detail is TBD A special value for Block ACK Starting Sequence Control field can be used to indicated that this field is a null BA information field

Conclusion UL MU TXOP needs a new scheme to allow flexible UL MU transmission. In this proposal, we discussed a new control scheme with a multi-user BA+Poll frame to achieve the acknowledgement, polling and resource allocation , error indication and assistant UL transmission control indication. to provide the scheme with minimum overhead to keep compatibility with legacy devices

Reference [1] 11-14-0165-01-0hew-802-11-hew-sg-proposed-par [2] 11-09-1036-00-00ac-uplink-mu-mimo-sensitivity-to-power-differences-and-synchronization-errors [3] 11-14-0802-00-00ax-consideration-on-ul-mu-transmission