CW Operation of XFEL Modules

Slides:



Advertisements
Similar presentations
Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Advertisements

RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
E. KAKO (KEK) 2009' Sept. 30 Albuquerque Global Design Effort 1 Cavity Test Items in S1-G Cryomodule Eiji Kako (KEK, Japan)
News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste.
1 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation.
Lutz Lilje DESY -MPY- Module Issues XFEL Linac Review R. Lange/L. Lilje Ongoing Tests Module Designs Future tests.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
Clustered Surface RF Production Scheme Chris Adolphsen Chris Nantista SLAC.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
Marc Ross Nick Walker Akira Yamamoto ‘Overhead and Margin’ – an attempt to set standard terminology 10 Sept 2010 Overhead and Margin 1.
SRF Requirements and Challenges for ERL-Based Light Sources Ali Nassiri Advanced Photon Source Argonne National Laboratory 2 nd Argonne – Fermilab Collaboration.
Aug 23, 2006 Half Current Option: Impact on Linac Cost Chris Adolphsen With input from Mike Neubauer, Chris Nantista and Tom Peterson.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
1Matthias LiepeAugust 2, 2007 Future Options Matthias Liepe.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
BEAMLINE HOM ABSORBER O. Nezhevenko, S. Nagaitsev, N. Solyak, V. Yakovlev Fermi National Laboratory December 11, 2007 Wake Fest 07 - ILC wakefield workshop.
Jan Low Energy 10 Hz Operation in DRFS (Fukuda) (Fukuda) 1 Low Energy 10Hz Operation in DRFS S. Fukuda KEK.
Overview of long pulse experiments at NML Nikolay Solyak PXIE Program Review January 16-17, PXIE Review, N.Solyak E.Harms, S. Nagaitsev, B. Chase,
THE ANDRZEJ SOŁTAN INSTITUTE FOR NUCLEAR STUDIES INSTYTUT PROBLEMÓW JADROWYCH im. Andrzeja Sołtana
Matthias Liepe. Matthias Liepe – High loaded Q cavity operation at CU – TTC Topical Meeting on CW-SRF
RF control and beam acceleration under XFEL conditions Studies of XFEL-type Beam Acceleration at FLASH Julien Branlard, Valeri Ayvazyan, Wojciech Cichalewski,
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
CW and LP operation of the XFEL-type cryomodule Jacek Sekutowicz.
Cavity/CM Considerations for CW Operation Cryogenic loads and cryogen distribution End Group cooling: HOM antenna redesign HOM loads and suppression requirement.
Thomas Jefferson National Accelerator Facility Page 1 FNAL September 11, 2009 Design Considerations for CW SRF Linacs Claus H. Rode 12 GeV Project Manager.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
DESY 2011 CMTB Experiment Summary PXFEL2-1 cryomodule used to investigate LP and CW operation in the summer of 2011: CW operation up to 7.5 MV/m.
Recent Result for the STF-2 Cryomodule Operation
WP5 Elliptical cavities
XFEL beamline loads and HOM coupler for CW
Power Couplers, HOM Couplers and Tuners for the XFEL
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
LLRF systems status update
Jefferson Lab, Newport News, U.S.A.
Test plan of ESS HB elliptical cavity
Joint Accelerator Research JGU & HZB
High Gradient Cavities: Cost and Operational Considerations
ESS RF Development at Uppsala University
Commissioning and First Cooldown of XFEL Linac
BriXS – MariX WG 8,9 LASA December 13, 2017.
World Wide Fundamental Power Coupler meeting #3
Notkestrasse 85, Hamburg, Germany
Wolfgang Anders, BESSY, Berlin
High Q Cavity Operation in the Cornell Horizontal Test Cryomodule
V. Veshcherevich Cornell University
SRF Pb/Nb photoinjector; recent results
Review of the European XFEL Linac System
XFEL Project (accelerator) Overview and recent developments
Operational Experience with the Cornell ERL Injector SRF Cavities
CW accelerating module test progress at DESY
KEK injector cryomodule
CEPC RF Power Sources System
ERL Main-Linac Cryomodule
SCRF for cw operating XFEL
Performance of Large Grain TESLA cavities
EU-XFEL summary of performance degradation
FRIB summary of performance degradation - VTA to cryomodule
Cryomodules Challenges for PERLE
Cryomodule Performance in FLASH and XFEL
ERL Director’s Review Main Linac
Tom Peterson, Fermilab 6 December 2011
CEPC SRF Parameters (100 km Main Ring)
Comparison between 4K and 2K operation performance of CEBAF injector cryomodules Grigory Eremeev Monday, August 19, 2019.
Cryomodule Design for CW Operation 3.9 GHz considerations
Summary of the maximum SCRF voltage in XFEL
Presentation transcript:

CW Operation of XFEL Modules Outline Limitations of the XFEL cryo module for high duty cycle and CW Module tests Dynamic heat load for the cw operation Dynamic heat load measurements vs. duty factor Maximum gradient test for the lp operation Vector sum stabilization with RF-feedback Wolf-Dietrich Möller, slides are from Jacek Sekutowicz TTC topical meeting on CW SRF 12th – 14th June 2013, Cornell University

Limitations for the XFEL Module and Linac 1 The XFEL main linac consists out of 7 cryo strings, every string includes 12 cryo modules, every cryo module contains 8 cavities. 2.2 K forward 5 K forward 40 K forward 2-phase tube: 240 W (20W/cryomodule) is the estimated limit for one cryo string. 2 K, Gas Return Tube 80 K, Return 8 K, Return 1st limit: Heat load at 2K for each cryomodule must not exceed 20 W.

Limitations for the XFEL Module and Linac 2 Each cryomodule houses 8 cavities (in total there will be 808 cavities in the linac) Cavity was designed for ca. 1% DF. End groups (FPC and HOM couplers) are cooled by means of heat conduction. HOM coupler FPC Dissipation on the HOM coupler antennas is the main sources of the heat for the end groups.

Limitations for the XFEL Module and Linac 3 Experience with vertical tests (cavities immersed in the superfluid bath): Without HOM antennae: Eacc up to 45 MV/m in the cw mode With HOM antennae: Eacc up to 40 MV/m in the lp mode DF = 10 % 2nd limit: Heating of the HOM couplers must not lead to quenching of the end-cells.

Limitations for the XFEL Module and Linac 4 Other, “practical” limits: 3rd limit: The main XFEL linac will not be rebuilt for the new operation modes Minor modifications in the cryomodule (cavities) have to be done now, prior to the series production. Linac can be extended with 12 cryomodules from the injector section. 4th limit: An upgrade of the cryogenic plant should be “doable” 5th limit: New RF-sources will be added to the klystrons we plan to use for the nominal operation. The new sources should fit in the tunnel. We plan to have a single RF-source/CM.

CW and Long Pulse Operation Modes Proposed new operation modes for the XFEL: Continuous wave operation for Eacc ≤ 7 MV/m Long pulse operation at Eacc > 7 MV/m with DF ~ (7/Eacc)2 Example of long pulse operation at Eacc = 14 MV/m 750 ms frep = 1Hz ~100 fs 1s 250 ms 4 µs for 1 nc Bunch quality as high as for the nominal short pulse operation.

Dynamic heat load for the cw operation, 1 For experiments we equipped CryoModule Test Bed with cw operating RF-source (IOT). Example #1 of the cw run Goal: Measurement of dynamic 2K heat load for the cw operation. Conditions: 7 cavities in operation (C#7 had detuned HOM coupler. It was operable <4MV/m). End-groups were thermally connected to the 2K tube. < Qload> = 1.5E7, 3 dB resonance width 87 Hz. Eacc= 5.6 MV/m. Pout IOT ~ 4.4 kW, RF-power/coupler ~ 550 W. Feedbacks: RF off and piezo on. Estimated dynamic heat load and measured static load: For assumed Qo = 1.7E10 at this gradient dynamic heat load should be 13.7 W. Cryomodule static loss 4.5 W.

Dynamic heat load for the cw operation, 2 2K dynamic loss at Eacc= 5.6 MV/m Dynamic HL = 16 W < Eacc > = 5.6 MV/m Reference 5 W Eacc =0 MV/m Measured dynamic heat load for 7 cavities was 16 W.

Dynamic heat load for the cw operation, 3 Conclusion: The difference of 2.3 W between measured and estimated HL can be attributed to warming of 14 end-groups, which is 0.16 W/(end-group) . Projecting this result on 8 cavities operating at 1.8 K, one might expect cw operation at Eacc close to 7 MV/m if Qo at that gradient is 3.4 E10.

Dynamic heat load measurements vs. duty factor, 1 Example #2 of the long pulse run Goal: Measurement of the dynamic 2K heat load vs. DF for lp operation. Conditions: <Eacc> = 8.1 MV/m, Rep. rate 0.7 Hz. 6 cavities in operation, (C#7 detuned HOM coup., C#8 quenched at 9.3 MV/m at larger DF). Feedbacks: RF off, piezo feedback and bias on. Test Result: for the DF range from 15% to 47%. DF =47% DF =31% DF =25% DF =21% DF =39% DF =15% Reference 1W; 0 MV/m

Dynamic heat load measurements vs. duty factor, 2 Test Result, cont.: Diagram showing measured and estimated Heat Load (HL) at 2K.

Dynamic heat load measurements vs. duty factor, 3 Conclusion: The cryomodule (6 cavities) could be operated very stable at 8.1 MV/m at up to 650 ms long flat top + 33 ms filling. No anomalous behavior was observed up to this flat top and 47% DF. The difference between measured and estimated heat load for long pulses can be attributed to higher operating temperature of 12 end-groups. These additional heat is ~280 mW/end-group at 650 ms long flat top. Projecting this result for 8 cavities operating at 1.8 K, DF = 14%, one might expect to reach 20 MV/m for the 20 W/cryomodule with repetition rate of 1 Hz.

Maximum gradient test for the lp operation, 1 Example #3 of the lp run Goal: Measurement of the dynamic 2K heat load at higher gradients. Conditions: Maximum IOT Pout was ca. 18 kW, due to strong reflection in the input circuit of IOT and reflection in the RF-power distribution system. Eacc= 10.5 MV/m (6 good cavities) + C# 8 was operated at 8 MV/m. DF= 17 %, repetition rate 0.7 Hz and flat top ca. 200 ms. Feedbacks: RF off, piezo on. Estimated dynamic heat load and measured static load: For assumed Qo = 1.7E10 at this gradient, the dynamic heat load is 5.3 W. Static heat load of the tested cryomodule was 4.5 W.

Maximum gradient test for the lp operation, 2 Test Result: System was operating stable for ca. 2h, no anomalous behavior was observed. Reference 1 W; 0 MV/m Dynamic HL = 6.3 W < Eacc > = 10.5 MV/m Conclusion: As before, 1 W difference between the dynamic measured and estimated heat load is due to losses in the end-groups, ca. 0.08 W/(end-group). Again, projecting this result for 8 cavities operating at 1.8 K, one should be able to reach 21.5 MV/m at DF=17%, flat-top ~140 ms for the budget of 20 W/CM.

Vector sum stabilization with RF-feedback Goal: Stability of the vector sum for the cw operation with the new µTCA LLRF. Conditions: Eacc = 3.5 MV/m, mode cw, piezo feedback off, bias on. Test Result: 1s 1s RF-feedback off Standard deviations for: Amplitude = 1.5E-3 Phase = 0.5° phase Vector sum RF-feedback on Standard deviations for: Amplitude = 6.2 E-5 Phase = 0.0098° Vector sum phase Conclusion: New µTCA RF-feedback improves amplitude and phase stability by factor of 24 and 51 respectively, and fulfills spec for the XFEL linac.

conclusion The experiments showed feasibility of more flexible operation for the XFEL linac. Following must be demonstrated in near future with coming XFEL-like cryomodules: Benefit to operate at 1.8 K (can we get to higher gradients for 20W/cryomodule ?). Higher gradients than 10.5 MV/m in lp operation (maximum Eacc vs. DF). Superconducting RF gun needs more R&D Test stand for SRF guns should be ready in 2014. Other superconductors or photo-emitters should be studied. R&D programs for 1.3 GHz and 3.9 GHz cavities should give an answer by the end of 2014 how high in gradient we can go for the cw mode.

Acknowledgements Thank you Jacek, that you allowed me to present your experiment. Jacek: I want to express my gratitude to all Colleagues contributing to the experiments: DESY: V. Ayvazyan, J. Branlard, W. Cichalewski, M. Ebert, N. Engling, J. Eschke, T. Feldmann, A. Goessel, W. Jalmuzna, D. Kostin, M. Kudla, D. Makowski, F. Mittag, W. Merz, C. Müller, R. Onken, A. Piotrowski, K. Przygoda, I. Sandvoss, A. Sulimov.