Thursday 21/4 07:30: End of fill #1727. Beam dumped. ALICE compensator magnet fault. Delivered ~6.7 pb -1 in 7.5 h. 11:30 Stable beam # bunches/beam.
Advertisements

07:30 – 10:30 Asynchronous dump test with Beam 2. No issue found. FIDEL update. Now chromaticity decay corrected. 12:13 Beam dump due to problem in the.
Tuesday 7 th August - morning 07:10 Reinjection after loss of fill 2920 to UFO near ALICE  26 pb -1 in 1h16m; peak lumi 6.4e33 cm -2 s -1 08:10 dump at.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
LHC Status Tue Morning 22-Aug
Transverse Damping Requirements
Summary of week 40 Machine Coordinators: G. Arduini, M. Lamont
Machine Coordinators: G. Arduini, J. Wenninger
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Tuesday Nov 16th Fill 1492 into physics around 07.30
Monday fill with 1092 bunches (6 h stable beams)
LHC summary week 32 Coordination: Mike Lamont & Jan Uythoven
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
LHC Morning Meeting - G. Arduini
Monday 6th August & night
Summary of Week 11: 14 – 21 March
LHC Morning Meeting - G. Arduini
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Summary of Week 16 G. Arduini, J. Wenninger
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
LHC Morning Meeting - G. Arduini
Friday 31st August & night
Mike Lamont, Jorg Wenninger
Thursday 10th May - morning
Wednesday 8th August & night
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Sunday morning Recovering from 400 kV disturbance.
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
Chromaticity can make a difference…
Friday 11/5 08:00 RF communication problem solved. Ready to inject but beam not available from the injectors. Injection line collimators opened from 4.5.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Saturday – Morning 7:36 beams dumped
Tuesday 9th November 10:02 Fill beams dumped
LHC Morning Meeting - G. Arduini
Finally.... We had to wait a long time.... We had many problems....
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Sunday
LHC Morning Meeting - G. Arduini
Tuesday morning 09:30 Beam dump, SIS dump due to lost connections with FCG FECs. Coincides with starting a development SIS server to test new interlocks.
Wednesday 10/5 Cryo recovery until 18:30
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
LHC Morning Meeting - G. Arduini
Monday 14:00 beam dump Access:
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Thursday Fill 1364 (24 bunch) dumped at 07h
Saturday Nov Stop proton operation. Switch back to ions
IP8 aperture measurements (07:30-10:30)
LHC Morning Meeting - G. Arduini
Thursday – Morning Energy matching at injection with H CODs
LHC Status Tue Morning 22-Aug
LHC Morning Meeting - G. Arduini
Sat 15/10 New record bunch population profiting of the scrubbing period on Friday. Nb~1.42x1011p/bunch  110 MJ at 3.5 TeV. Filling slowed down by ZS sparking.
Saturday 24 September 2011.
Wednesday h18: 228b fill lost just before start of ramp.
LHC Morning Meeting - G. Arduini
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Saturday 6th October 05:38 STABLE BEAMS # :06 OP dump
Wednesday morning Waiting for PS – problem on RF cavity.
Friday :47 stable beams fill 3273
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Tuesday
Presentation transcript:

LHC Morning Meeting - G. Arduini Friday 17/08 09:00 Filling #2981. Still very good emittances 09:52 Beam dump during the ramp. SIS interlock on RB energy check. Data update too slow (CMW)  Being investigated While ramping down start PS access for RF cavity then access for ALICE, ATLAS, CMS + other 2 pending accesses for the machine. Problem of the 40 MHz RF cavity more serious than expected. Could not be repaired. More news next week. For the moment running without hot spare. 13:20 PS/SPS ready but still CMS access. 13:45 CMS out. 14:13 injecting (2983): 1.6x1011 p/b. Increased damper gain (V) during the squeeze. 15:41 Stable beams #2983: Initial luminosities close to 7x1033 cm-2s-1 . Losses on some bunches (B2 mostly) after end of squeeze. 11/11/2018 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini Fill #2980 Instability (vertical) observed at the end of the squeeze in Fill 2980. BBQ-B1H BBQ-B2H BBQ-B1V BBQ-B2V 11/11/2018 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini Fill #2980 Collision Collision End of squeeze End of squeeze X. Buffat Following recommendation from impedance team further increased damper gain in the V-plane (factor 2) now equal to H-plane 11/11/2018 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini Fill 2983 Still some instabilities already appearing at the end of the squeeze and later although better than fill 2980. Further increase damper gain (now at maximum in both planes) and chromaticity (13 units) BBQ-B1H BBQ-B2H BBQ-B1V BBQ-B2V 11/11/2018 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini Fill 2893 Damper pick-up data Consistency with BBQ data being verified B. Salvant 11/11/2018 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini Fill 2893 Loss data Adjust End of squeeze X. Buffat 11/11/2018 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini Kicker temperature Dump delayed due to injection kicker temperature (MKI2) to minimize waiting time at injection. Thresholds to be verified. 07:30 Beams dumped (end of fill #2893 – 195 pb-1 in 16 h). Filling for physics 11/11/2018 LHC Morning Meeting - G. Arduini