13/07/2009 1River restoration design and construction - Celine Gallay Our experience in river restoration design and construction for the Environment Agency.

Slides:



Advertisements
Similar presentations
Effective Asset Management John Holdsworth & Sue Philpott.
Advertisements

1 Bert van der Plas UNFCCC Training programme on preparing technology transfer projects for financing Asia and Pacific regional workshop on preparing technology.
EMPA STAKEHOLDERS CONFERENCE 31 January 2009 Richard Hanson Service Director (Property) Nottinghamshire County Council Chair: East Midlands Property Alliance.
Making a Financial Case: The Loughborough Context ILM Level 5
Supporting an Essential Platform for the Knowledge Base David Harman.
David Mackness CEO Scape. EMPA – Making a Difference Issues to resolve A solution from empa Improving your project deliver.
Information delivered by: Alan Coole from Scape System Build Ltd Fresh Thinking.
© 2010 German Development Institute / Deutsches Institut für Entwicklungspolitik (DIE) Efficient Service Provision at Local Government Level in Zambia.
1 Service Providers Capacity Assessment Framework Presentation to the Service Delivery Advisory Group August 28, 2008.
Managing wetlands for wildlife and people Tricia Henton 19 April 2010.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Case Study Water and Waste Water Infrastructure Northern Ireland.
CIWEM Annual Conference, 30 th April 2009 River SSSIs: Prioritising Steps on the Road to Recovery Joanna Eyquem MCIWEM CEnv 30 th April 2009.
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
Toby Hull South East Rivers Trust March 2015 The Constraints of Connecting Habitat and Fish Passage in an Urban Environment.
Construction Category Management Planning Version 1.1 (May 2015)
Constructing West Midlands Martin Merrix Divisional Manager, Urban Design.
1 A Member of the Team Focus Group Integrated Management Systems Industry View 2 Michael Thompson BSc (Eng), FFICE, MCIWEM Roe Thompson Limited.
New Decade - New Challenges Annual Conference September 2010 Water Services Training Group 14 th Annual Conference New Decade – New Challenges 9 th September.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
Hydrological Monitoring– Status June 2012 Mikaela Kruskopf, TBIWRDP WME, BoARD.
Developing Effective & Sustainable Community Use Sports Provision Colin Grogan, Sport, Health and Inclusion Development Manager, Suffolk County Council.
Current Design and Implementation Challenges of Road Projects on the Coastland Ron Rahaman Chief Roads and Bridges Officer Ministry of Public Works Works.
Loomis & Ballweber’s A Policy Analysis of the Collaborative Upper Colorado River Basin Endangered Fish Recovery Program: Cost Savings or Cost Shifting?
Early Market Briefing Proposed tender for the Australia-Timor-Leste Partnership for Human Development (ATLPHD) 14 September 2015, Dili.
Police Funding and Pensions Update Katharine Hammond 5 th October 2010.
Methodological Lessons Joint Evaluation of Conflict Prevention and Peace-Building in DRC, Day 2, Presentation in Oslo ‘What Have We learnt From.
Tackling the public sector savings challenge Simon Wilson The Crown Commercial Service Conference on University Purchasing (COUP) September 10 th, 2015.
Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009 Water Services Training Group 13 th Annual Conference 10 th.
Caring for the Swan Canning Riverpark Swan River Trust Alcoa Landcare Program 2013 Premier’s Awards Presentation Category - Managing the Environment.
Research on Rural Resource Management and the Rural Economy: Addressing the Local and Regional Dimension Royal Society of Edinburgh 16 May 2007.
LINKING OPPORTUNITY AND NEED: MAXIMISING BENEFITS OF PHYSICAL REGENERATION SCR Mixed and Sustainable Communities Learning Network 26 March 2009.
Western Irrigation Futures Customer Workshops. 2 What is the Western Irrigation Futures? Long-term strategic direction for the Werribee and Bacchus Marsh.
Building Public Service Capability National School Excellence
Southend Together Secretariat 21 st February Developing Southend Together’s Sustainable Community Strategy
CANADIAN COLUMBIA RIVER FORUM U.S. Flood Control and Operational Perspective Jim Barton, Chief of Corps of Engineers Columbia Basin Water Management Division.
URBAN STREAM REHABILITATION. The URBEM Framework.
UlvestadEVLA Advisory Committee Meeting September 6-7, Future EVLA Operations Jim Ulvestad.
Hospital Revitalisation Grant: 2010/11 Financial Year Presentation to the Select Committee on Finance October 2010.
11 PUBLIC HEARINGS ON CONDITIONAL GRANTS AND CAPITAL EXPENDITURE 2008/2009 PARLIAMENT 27 AUGUST 2008.
Supporting People Review Presentation for NIFHA Care and Support Conference – 3 June 2015 Stephen Martin, Deputy Director, Housing Policy Delivery.
Water Director Meeting 30th November 2006, Inari / SF WFD and Hydromorphology Technical report on “Good practice in managing the ecological impacts of.
Pam Jeane Deputy Chief Engineer- Operations Sonoma County Water Agency Habitat Enhancement and Water Delivery.
Introduction to sustainable drainage
TRAP 5 th interregional meeting & Site Visits Limerick & Lough Derg, Ireland 9 th October 2013 CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional.
CONSTRUCTING WEST MIDLANDS Question & Answer Session 22 nd March 2011 LOT 7 – CAPITAL WORKS.
Southeast strategic regional coastal monitoring programme Strategic Regional Coastal Monitoring Programme Procurement & Contract Management.
CONSTRUCTING WEST MIDLANDS Question & Answer Session 22 nd March 2011 LOTS 1-6.
Reorganisation of Gloucestershire Adult Education Service Initial Meeting 21 st April 2016.
Commission of Inquiry into achieving best value in the procurement of construction. Andrew Smith Chair of NIEP Board National Improvement and Efficiency.
Central Valley Habitat Exchange A Voluntary Program Creating New Financial Returns for Landowners Introduction & Overview July 1, 2014.
OVERVIEW OF DEPARTMENT OF ARTS AND CULTURE SERVICES INFRASTRUCTURE PORTFOLIO DATE: 06 SEPTEMBER 2016.
The Oregon Watershed Council Model, USA
The Design Team Carl James.
SUPPLY CHAIN COLLABORATION A Practical Example
Multiple Partnering Consortium
Loddon Campaspe Integrated Transport Strategy
COST PLANNING AND ESTIMATION
CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional Authority
Title: Introduction of Standard Steps in Planning and Implementation of Water Sector Projects in Ethiopia. Prepared by: Dr.-Ing. Asie Kemal Jabir, Addis.
Loddon Campaspe Integrated Transport Strategy
Supplementary Services Project Management Services.
URBAN STREAM REHABILITATION
A pilot appraisal at catchment level for the second RBMP cycle: Experience from the UK Presented by: Simon Scanlan (Defra) Kathrynne Moore (Environment.
STFC Update – Programmes Directorate PPAP Community Meeting
Winter Water: A hot topic for cold fish.
Project delivery RIBA stages Define design deliver Key Objectives 1 2
Progress on the Bucket Eradication Programme
Waters and Communities Office Local Authority Waters Programme
Natura 2000 management group Brussels, 19 May 2011
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

13/07/2009 1River restoration design and construction - Celine Gallay Our experience in river restoration design and construction for the Environment Agency Céline Gallay Senior Engineer Halcrow Group Ltd

13/07/2009 2River restoration design and construction - Celine Gallay Introduction I will discuss the following topics: Understanding the design and information on how to restore Landowner engagement, constraints and buy-in into the design Our experience of framework contractors in river restoration The need for flexibility in the design and adequate supervision How to program the works for the low flow period

13/07/2009 3River restoration design and construction - Celine Gallay Understanding the design and information on how to restore Simple design with two categories: structures and in-river restoration works Structures: balance design life, Eurocode standards / structures similar to historical structures Conflict between different protected species in different channels: the client must prioritise species at an early stage RRC manuals: good source of information on restoration techniques More information on ideal flow conditions to provide good habitats for different species would be useful

13/07/2009 4River restoration design and construction - Celine Gallay Landowner engagement, constraints and buy-in into the design Consultation of landowner is required at the earliest opportunity ideally with outline design Good to have a showcase project. E.g. Barton Court on Kennet Convincing the landowner that fish will not be lost due to removal of weed rack Strategic River Avon Restoration : removal of weirs/hydroelectric schemes

13/07/2009 5River restoration design and construction - Celine Gallay Our experience of framework contractors in river restoration Works have been delivered through the NCF or the Minor Works Framework Competent framework Contractors to build structures but some lack experience in river restoration techniques Wylye: river restoration works were carried out by a fencing sub- contractor Avington: stone riffle rolled to a flat finish Lessons learnt: during tender process, a client should request CVs of key construction staff for the works, which demonstrate past experience in river restoration

13/07/2009 6River restoration design and construction - Celine Gallay The need for flexibility in the design and adequate supervision Flexible design to accommodate protected species. E.g. water voles at Avington Not an exact science – design needs to be adapted on site Importance of Environmental Clerk of Works on site and a site supervisor (part-time basis)

13/07/2009 7River restoration design and construction - Celine Gallay How to program the works for the low flow period Best period from mid-July to mid-October during the low flow season Budget allocated for the whole project in the same financial year (April to March) resulting in a great challenge to have works on site before September. Programme of works was developed with the Environment Agency SW Blandford office: Reaches of the River Avon and its tributaries in need of River Restoration were identified and prioritised, with a costed action plan taking into account the likely landowner collaboration, A PAR was prepared for a 5 year programme of works allowing design during a financial year and construction during the summer of next financial year, This approach also allows the packaging of projects and hence cost savings.

13/07/2009 8River restoration design and construction - Celine Gallay Example of strategic River Restoration Project (River Avon) 5-year programme

13/07/2009 9River restoration design and construction - Celine Gallay Conclusion Additional information on ideal flow conditions for protected species would be useful Early landowner engagement is essential Selected EA framework contractor for tenders should demonstrate past experience in river restoration Flexible design and adequate site supervision are required A more strategic catchment base approach to river restoration should be considered to provide better value for money