Construction Start Date: May 4, 2009 Architect: FGM Architects – OFallon, IL Civil : Hoelscher Engineering – Fairview Heights, IL Mechanical / Plumbing:

Slides:



Advertisements
Similar presentations
August July 2010 Annual Academic Calendar Colegio Los Robles.
Advertisements

JULY JULIO AUGUST AGOSTO SEPTEMBER SEPTIEMBRE OCTOBER OCTUBRE NOVEMBER NOVIEMBRE DECEMBER DICIEMBRE LOS ANGELES UNIFIED SCHOOL DISTRICT DISTRITO ESCOLAR.
Team UK Eugene Incerti Director of Skills Competitions BACH Conference March 2011.
Advanced Piloting Cruise Plot.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
NANPA Oversight Working Group Status Report to the NANC April 17, 2001 Chair Pat Caldwell.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
Multiplying binomials You will have 20 seconds to answer each of the following multiplication problems. If you get hung up, go to the next problem when.
Board of Early Education and Care Retreat June 30,
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 10 second questions
2010 fotografiert von Jürgen Roßberg © Fr 1 Sa 2 So 3 Mo 4 Di 5 Mi 6 Do 7 Fr 8 Sa 9 So 10 Mo 11 Di 12 Mi 13 Do 14 Fr 15 Sa 16 So 17 Mo 18 Di 19.
Compiled by John McFarlane 13 th June th June Slides Duration 5:30 minutes Version V.01.
Duration CONSTRUCTION Opening Date EQUIP INSTALL. & TEST Incheon International Airport Control Tower Outcome Progress DESIGN & AWARD : AOR 36 MONTHS.
West Elementary School May 16, % Construction Documents.
East Parking Garage Project (Executive Leadership Council) January 31, 2011.
Richmond House, Liverpool (1) 26 th January 2004.
Break Time Remaining 10:00.
ABC Technology Project
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
VOORBLAD.
15. Oktober Oktober Oktober 2012.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
Copyright © 2013, 2009, 2006 Pearson Education, Inc.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Squares and Square Root WALK. Solve each problem REVIEW:
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
8 2.
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
SIMOCODE-DP Software.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
25 seconds left…...
Recession Briefing RDA Project Managers Meeting Nov 2009 Ben Neild Assistant Director, SLIM.
Masters Monthly Report Region Europe April. Volvo Construction Equipment 2 European Masters 2009 April report  All dealers will have different time plans.
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Clock will move after 1 minute
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
PSSA Preparation.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Essential Cell Biology
Calendario 2008 MON TUE WED THU FRI SAT SUN January.
X-box Factoring. X- Box 3-9 Product Sum Factor the x-box way Example: Factor 3x 2 -13x (3)(-10)= x 2x 3x 2 x-5 3x +2.
Weekly Attendance by Class w/e 6 th September 2013.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
CpSc 3220 Designing a Database
DISTRIBUSI PROBABILITAS KONTINYU Referensi : Walpole, RonaldWalpole. R.E., Myers, R.H., Myers, S.L., and Ye, K Probability & Statistics for Engineers.
Presentation transcript:

Construction Start Date: May 4, 2009 Architect: FGM Architects – OFallon, IL Civil : Hoelscher Engineering – Fairview Heights, IL Mechanical / Plumbing: Cover Engineering – Alton, IL Electrical: Solutions AEC – St. Louis, MO General Contractor: R.W. Boeker – Hamel, IL STAUNTON TRACK AND CONCESSION BUILDING 2009 FGM ARCHITECTS #

Construction Photo Date: May 6, 2009 STAUNTON TRACK AND CONCESSION BUILDING 2009 FGM ARCHITECTS #

Construction Photo Date: June 7, 2009 STAUNTON TRACK AND CONCESSION BUILDING 2009 FGM ARCHITECTS #

Construction Photo Date: June 22, 2009 STAUNTON TRACK AND CONCESSION BUILDING 2009 FGM ARCHITECTS #

Construction Photo Date: June 29, 2009 STAUNTON TRACK AND CONCESSION BUILDING 2009 FGM ARCHITECTS #

Construction Photo Date: July 7, 2009 STAUNTON TRACK AND CONCESSION BUILDING 2009 FGM ARCHITECTS #

Construction Photo Date: July 13, 2009 STAUNTON TRACK AND CONCESSION BUILDING 2009 FGM ARCHITECTS #

Construction Photo Date: July 20, 2009 STAUNTON TRACK AND CONCESSION BUILDING 2009 FGM ARCHITECTS #

Construction Photo Date: July 27, 2009 STAUNTON TRACK AND CONCESSION BUILDING 2009 FGM ARCHITECTS #

Construction Photo Date: Aug 10, 2009 STAUNTON TRACK AND CONCESSION BUILDING 2009 FGM ARCHITECTS #

Construction Photo Date: Aug 11, 2009 STAUNTON TRACK AND CONCESSION BUILDING 2009 FGM ARCHITECTS #

Construction Photo Date: Aug 17, 2009 STAUNTON TRACK AND CONCESSION BUILDING 2009 FGM ARCHITECTS #

Construction Photo Date: Aug 24, 2009 STAUNTON TRACK AND CONCESSION BUILDING 2009 FGM ARCHITECTS #

Construction Photo Date: Oct 7, 2009 STAUNTON TRACK AND CONCESSION BUILDING 2009 FGM ARCHITECTS #

Construction Photo Date: Oct 7, 2009 STAUNTON TRACK AND CONCESSION BUILDING 2009 FGM ARCHITECTS #

Construction Photo Date: Oct 7, 2009 STAUNTON TRACK AND CONCESSION BUILDING 2009 FGM ARCHITECTS #

Concession Building Construction Photo Date: July 20, 2009 STAUNTON TRACK AND CONCESSION BUILDING 2009 FGM ARCHITECTS #

Concession Building Construction Photo Date: July 27, 2009 STAUNTON TRACK AND CONCESSION BUILDING 2009 FGM ARCHITECTS #

Concession Building Construction Photo Date: Aug 10, 2009 STAUNTON TRACK AND CONCESSION BUILDING 2009 FGM ARCHITECTS #

Concession Building Construction Photo Date: Aug 17, 2009 STAUNTON TRACK AND CONCESSION BUILDING 2009 FGM ARCHITECTS #

Concession Building Construction Photo Date: Oct 7, 2009 STAUNTON TRACK AND CONCESSION BUILDING 2009 FGM ARCHITECTS #

Construction Start Date: May 4, 2009 Architect: FGM Architects – OFallon, IL Civil : Hoelscher Engineering – Fairview Heights, IL Mechanical / Plumbing: Cover Engineering – Alton, IL Electrical: Solutions AEC – St. Louis, MO General Contractor: R.W. Boeker – Hamel, IL STAUNTON TRACK AND CONCESSION BUILDING 2009 FGM ARCHITECTS #