CARLIN LAW GROUP, APC Grounds for Additional Time and/or Compensation A.Express Changes B.Constructive Changes C.Differing Site Conditions D.Express Suspension.

Slides:



Advertisements
Similar presentations
Construction Delays & CPM Schedules
Advertisements

B. Progress Schedule Schedule Costs –2002 C&MS … the cost of preparing and updating the schedule is incidental to all contract items. –2005 C&MS.
Construction Contracting
CARLIN LAW GROUP, APC Dispute Resolution Procedures Contract Claims Requirements Public Contract Code § (schools) Public Contract Code §20104 Government.
Construction Engineering 380 Subsurface Conditions.
© 2007 Prentice Hall, Business Law, sixth edition, Henry R. Cheeseman Chapter 15: Third-Party Rights and Discharge.
CARLIN LAW GROUP, APC (619) Know Your Indemnity Obligation Know Your Risk Know Your Insurance Company by KEVIN R. CARLIN, ESQ.
Time Is Money - Delay Claims in Construction June 18, 2012
Crossing Agreements Canadian Best Practice Crossing Agreements A Canadian Best Practice Brad Watson TransCanada Pipelines and Alberta Common Ground Alliance.
‘CHANGES IN LAW’ Contractual Provision September, 2012 Topic for discussion Business Confidential Foster Wheeler Iberia/Chile Sep/2012.
6 th December 2003 Luthra & Luthra Law Offices1 Impact of Force Majeure on Contracts Presentation at the Indian Council of Arbitration By Mohit Saraf Partner.
Contractual Liability For Schools… Making Smart Choices and Finding the Negotiator Within Presented by Jessica K. Walls, Esq. Isaac, Brant, Ledman & Teetor.
Completion Outstanding work and Remedying Defects In order that the Works and Contractor's Documents, and each Section, shall be in the condition required.
Slides developed by Les Wiletzky Wiletzky and Associates Copyright © 2006 by Pearson Prentice-Hall. All rights reserved. PowerPoint Slides to Accompany.
Chapter 19 DISCHARGE OF CONTRACTS. 2 Conditions Relating to Performance Classification of Conditions: If the occurrence or non-occurrence of an event.
CONSTRUCTION ADMINISTRATION Preconstruction Operations Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
Contract Administration Chapter 6. Learn. Perform. Succeed. Learning Objectives Determine those contract administration contingency issues most often.
Time for a new standard - AS General Conditions of Contract
Construction Contract Administration (ENGC 6363) ( FIDIC Chapter 15) EMPLOYER BY TERMINATION Presented by: Mustafa Al tayeb.
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT Defects Liability [Construction Contract Administration] Chapter 11.
Delay Claims from the Owner and Contractor’s Perspectives
Construction Engineering 221 Contracts & Contractor Procurement.
Contract Termination and Excusable Delay
Construction Engineering 380 Contract Changes. Types of changes –Cardinal change- drastic change, either single direction or accumulated change in scope.
Contract Law for Paralegals: Traditional and E-Contracts © 2009 Pearson Education, Upper Saddle River, NJ All rights reserved Third-Party Rights.
Insurance provisions under JCT 1998 and JCT Standard Building Contract 2005 Brian Lewis – QBE CAR.
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
Performance and Discharge Chapter 8. Discharge Discharge usually results from performance but can occur in other ways: (1) the occurrence or failure of.
CHAPTER PowerPoint ® Presentation Prepared By Susan McManus, Mount Royal College CHAPTER PowerPoint ® Presentation Prepared By Susan McManus, Mount Royal.
1 Contractual Risk Allocation Provisions Presented by: Rolly Chambers & Gene Rash Smith, Currie & Hancock, LLP March 5, 2013.
Construction: Legal Issues. Legal Issues In the Bidding Process Timing of various activities has legal implications. During the bidding process: –A bid.
Comprehensive Volume, 18 th Edition Chapter 20: Discharge of Contracts.
Project risk and control. Tender risk Programme and method – Tightness of completion LAD’s Extent of change – Construction method Temporary works Change.
Delay In Construction Project In West Bank. Outline:  Background.  Research objective & methods.  Important factors that cause time and cost overrun.
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
Purchasing Supplies at CERN
CONSTRUCTION ADMINISTRATION Construction Operations Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
King Fahd University of Petroleum & Minerals
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
CHANGE ORDER & BACKCHARGES PREPARED BY ABDULAZIZ M. AL-BESHR ID# PREPARED FOR Dr. ABDULAZIZ BUBSHAIT.
LECTURE 4 FORMULATION & PRESENTATION OF MONETARY CLAIMS  Recovery of Loss / Expenses / Damages  Notice of intention to claim  Particular and further.
FORMULATION & PRESENTATION OF EOT CLAIMS
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
Project Closeout Module #14 Prepared by Dr. Randy R. Rapp July 2005.
Copyright © 2008 by West Legal Studies in Business A Division of Thomson Learning Chapter 19 Discharge of Contracts Twomey Jennings Anderson’s Business.
DISCHARGE OF CONTRACTS Used by permission. For Educational purposes only.
CON 2001 CVE 4070 Construction Methods/Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
April 19, 2001L&L/MDI1 Impact of Force Majeure On Contracts Presentation by Mohit Saraf Partner Luthra & Luthra Law Offices.
 Section Where you go if you disagree on either three elements entitlement, impacts or costs  Begins with the contractors notice 5 working days.
CLAIMS MANAGEMENT. PRESENTATION OUTLINE INTRODUCTION TYPICAL CLAIMS AGAINST OWNER TYPICAL CLAIMS AGAINST CONTRACTOR CRITICAL PATH METHODS UTILIZATION.
University of Calgary Continuing Education Construction Contract Law and Documents Week 12 Changes Delays Claims Contract Documentation.
Contract Performance In Traditional and E-Contracts; Breach of Contract and Remedies Chapter 18 & 19.
BIDDING PRIVATE AND PUBLIC WORK Major Differences between Private and Public How to determine whether a project is Public or Private: "Who owns the dirt"
Differing & Unforeseen Conditions Differing Site Conditions- actual conditions differ from the representation made in the contract documents (MSP airport)
CVE 4070 Construction Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
ISO 9001:2015 Subject: Quality Management System Clause 8 - Operation
Helen S. Henningsen Department of Veterans Affairs Office of General Counsel.
Project Risk Management Execution FE302 Lesson 5 June 2015 Changed Conditions on Construction Projects.
Extension of time and how it is granted to a contractor (Referencing JCT 2005)
ENGINEERING MANAGEMENT (GE 404)
Certificates JCT 11 SBC allows for 10 different kinds of certificates.
Find the Problems with the Provisions May 11, 2016 Presented By:
Dennis Li - HKCIC Lecturer
Unique General Conditions of the Alabama Building Commission (ABC)
Contract Changes Construction contracts are unique because owner can make unilateral changes to contract (with consideration)
Allocation of Risk Arising from Subsurface Conditions
Directed Change Constructive Change
Presentation transcript:

CARLIN LAW GROUP, APC Grounds for Additional Time and/or Compensation A.Express Changes B.Constructive Changes C.Differing Site Conditions D.Express Suspension of Work E.Constructive Suspension of Work F.Delay G.Acceleration H.Termination for Convenience

CARLIN LAW GROUP, APC Express Changes Should arise by way of a written change directive –If directive is verbal, the Contractor has the obligation to request it be confirmed in writing. Most construction contracts only allow for written change directives. Upon receipt of a change directive, the Contractor should provide a proposed change order (PCO) describing in detail the additional time and costs the Contractor will require. –Caution must be exercised in signing change orders so as not to waive the Contractors right to all costs and time associated therewith.

CARLIN LAW GROUP, APC Constructive Changes Changes are unintended and require the Contractor to perform work beyond whats required or contemplated by the terms of the Contract Documents.

CARLIN LAW GROUP, APC Causes of Constructive Changes A.Defective Contract Documents ie. Errors, omissions, ambiguities, impossible or impractical requirements B.Unreasonable inspection or installation requirements C.Failure to disclose relevant information D.Constructive Acceleration

CARLIN LAW GROUP, APC Prerequisites to Recovery for Constructive Changes A.The Work performed was not included in the original scope of work B.Contractor satisfied all contractual/statutory notice requirements C.Contractor did not volunteer to work under the changed conditions D.Contractor discreetly tracked and quantified its additional costs incurred due to the change

CARLIN LAW GROUP, APC Differing Site Conditions Contracts and/or statutes contain provisions which affect a Contractors ability to recover for unanticipated or hidden physical conditions on a project which differ from those represented in the bidding documents or would be normally anticipated in similar work.

CARLIN LAW GROUP, APC Type I Differing Site Conditions Physical conditions different from those shown or indicated in the Contract Documents at bid time. –Compensation for these conditions is quantified as the difference between what the bid documents indicate and what is actually encountered on the Project. –Examples include: Rock/unforeseen soils conditions Water where none is anticipated Buried surface obstructions where none are anticipated

CARLIN LAW GROUP, APC Type II Differing Site Conditions Conditions which are so unusual or so unpredictable that the Contractor cannot be reasonably expected to have anticipated them at bid time. –Compensation for these conditions is quantified as the difference between what the Contractor reasonably anticipated, based on similar work, and what is actually encountered on the Project. –Examples include: Hazardous or toxic materials Unusual soil conditions Buried obstacles in an area where not expected

CARLIN LAW GROUP, APC Express Suspension of Work Occasionally, an Owner will direct a Contractor to cease work for a period of time. –Usually the Contractor is obligated to comply with the direction, but is entitled to recover the time and costs associated with the stop work order. –A Contractor is not entitled to recover time or costs if the stop work order is issued due to the Contractors own fault or negligence.

CARLIN LAW GROUP, APC Constructive Suspension of Work May be caused by acts or omissions of one party on a construction project which have the effect of unreasonably delaying the Contractors work. –These situations usually arise from unintended tax and often result in an unanticipated delay. –Examples include: Delayed approval of shop drawings Delayed responses to requests for information Delayed issuance of change orders Delayed or obstructed access to work areas Delayed delivery of items/information by the other contracting party

CARLIN LAW GROUP, APC Prerequisites to Recovery for Constructive Suspension of Work Before a Contractor can recover for constructive suspensions of work it must demonstrate the following: 1.Occurrence of a delay 2.Caused by an action or inaction of the other contracting party 3.Delay was not foreseeable by the Contractor 4.All notices required by contract/statute were given by Contractor 5.Contractor incurred additional cost or time due to delay 6.Contractor discreetly tracked and quantified its additional costs incurred due to the delay

CARLIN LAW GROUP, APC Delay Delays on a construction project are classified as follows: –Excusable, non-compensable delay –Excusable, compensable delay –Inexcusable delay –Concurrent delay

CARLIN LAW GROUP, APC Excusable, Non-Compensable Delay Usually caused by a third party or occurrences beyond the control of either the Contractor or Owner. –Examples include: Acts of God, unusual weather, strikes, fires, floods, etc. Contractor is entitled to additional time and relief from liquidated damages, but is not entitled to recover additional costs incurred as a result of the delay.

CARLIN LAW GROUP, APC Excusable, Compensable Delay Caused by the other contracting party or its agents. –Changes to the Work which require additional time are an example of delays which are excusable but for which the Contractor is entitled to additional time and compensation associated with the delay.

CARLIN LAW GROUP, APC Inexcusable Delay Caused solely by the Contractor or its related parties ie. Subcontractors, suppliers, etc. Examples include: –Failure to timely prosecute the Work –Late delivery of information, equipment and/or materials In these instances the Contractor is usually not entitled to additional time or compensation for the delay. –Instead the Contractor is obligated to take such actions and incur such costs as are necessary to recover the lost time or pay the Owner damages for late completion.

CARLIN LAW GROUP, APC Concurrent Delays Situation where two or more delays occur simultaneously and impact the Projects critical path of completion. If the concurrent delays are caused by both contracting parties, neither party is entitled to damages to the extent the delays overlap. –The Contractor is entitled to a time extension but cannot recover any costs associated with the concurrent delay. –The Owner is not permitted to assess damages associated with the Contractors late completion to the extent the Owner has also caused the delay.

CARLIN LAW GROUP, APC Acceleration Situation where a party incurs more costs to complete a construction activity in a shorter time period than originally anticipated. –Classified as express or constructive.

CARLIN LAW GROUP, APC Express Acceleration An instance where one contracting party directs the other contracting party to complete its work in a shorter time than that allowed by their contract. –The party who accelerates is entitled to recover its costs associated therewith so long as the acceleration directive is not issued to recover previous delays for which the party is responsible. A related claim is one for deceleration where one contracting party directs the other to slow down its work and for which compensation associated with the inefficiency is recoverable to the extent it is identifiable and quantified.

CARLIN LAW GROUP, APC Constructive Acceleration Unintended shorting of the time allotted to complete a construction activity. To recover on a claim of constructive acceleration, the Contractor must demonstrate the following: 1.A delay occurred on the Project for which a time extension should have been granted 2.All contractual/statutory notices of the delay in corresponding request for a time extension were properly filed 3.The appropriate time extension was not granted 4.Contractor was required/directed to complete on time or threatened with the imposition of late completion damages 5.Contractor filed a separate notice that it was being constructively accelerated 6.Contractor actually accelerated its operation and incurred additional costs due to the acceleration 7.Contractor discreetly tracked and quantified its additional costs incurred due to the acceleration

CARLIN LAW GROUP, APC Termination for Convenience Many construction contracts contain a clause permitting a party to terminate the contract for its convenience. Absent expressed contractual provisions outlining the costs and profits recoverable due to a termination for convenience, the terminated party is entitled to recover its reasonable costs and profit.