Revenue Recognition Construction-Type and Production –Type Contracts

Slides:



Advertisements
Similar presentations
Income Measurement and Profitablity Analysis
Advertisements

IAS 11 - Revenue recognition for construction contracts
William F. Bentz 1 A&MIS 521 Fin. Accounting I - Session 16 William F. Bentz Accounting & MIS.
Chapter 18 REVENUE RECOGNITION CONTINUED Sommers – ACCT 3311
IFRS 15: Revenue from Contracts with Customers
FASB definitions Allocation: is the accounting process of assigning or distributing an amount according to a plan or a formula. It is a broader term than.
Revenue Recognition - Multiple-Element Arrangements
Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter Five Income Measurement and Profitability Analysis.
Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Income Measurement and Profitability Analysis 5.
1 Revenue Recognition An electronic presentation by Douglas Cloud by Douglas Cloud Pepperdine University Pepperdine University An electronic presentation.
Including Issues When the Right of Return Exists
William F. Bentz1 Revenue Recognition Revenue recognition is a crucial concept in accounting. It is the stage in the production cycle that revenue--and.
Income Measurement (Part 2)
Complexities of Revenue Recognition
Chapter 18 Revenue Recognition ACCT Revenue Recognition Basic Concepts Definition of revenue (SFAC 6) ◦ Inflows or other enhancements of assets.
REVENUE RECOGNITION Some Highlights and Examples from SAB 101.
Construction Contracts
Income Recognition and Measurement of Assets
COPYRIGHT © 2007 Thomson South-Western, a part of The Thomson Corporation. Thomson, the Star logo, and South-Western are trademarks used herein under license.
1 Income Measurement and Profitability Analysis Sid Glandon, DBA, CPA Associate Professor of Accounting.
Income Recognition and Measurement of Assets. Join khalid aziz  ECONOMICS OF ICMAP, ICAP, MA-ECONOMICS, B.COM.  FINANCIAL ACCOUNTING OF ICMAP STAGE.
1 Income Recognition and Measurement of Net Assets C hapter 17 An electronic presentation by Douglas Cloud Pepperdine University An electronic presentation.
Chapter 19: Revenue Recognition 上海金融学院会计学院. 1.Apply the revenue recognition principle. 2.Describe accounting issues involved with revenue recognition.
Intermediate Accounting
8-1 Intermediate Accounting James D. Stice Earl K. Stice © 2012 Cengage Learning PowerPoint presented by Douglas Cloud Professor Emeritus of Accounting,
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1999 Understanding Financial Statements © The McGraw-Hill Companies, Inc., Part One: Financial.
AS 9 : Revenue Recognition.  Revenue is the gross inflow of cash, receivables or other consideration arising in the course of the ordinary activities.
INCOME MEASUREMENT AND PROFITABLITY ANALYSIS Chapter 5 © 2009 The McGraw-Hill Companies, Inc.
Chapter 8 Revenue Recognition.
Chapter 18-1 Revenue Recognition Chapter18 Intermediate Accounting 12th Edition Kieso, Weygandt, and Warfield Prepared by Coby Harmon, University of California,
18-1 Prepared by Coby Harmon University of California, Santa Barbara Intermediate Accounting.
1 Derivatives, Contingencies, Business Segments, and Interim Reports.
Course on Professionalism Statement of Principles.
Chapter : Measurement and Reporting of Revenues and Expenses, Gains and Losses.
1 Chapter 6: Revenue Analysis. 2 Revenue Recognition Criteria Both the criteria should be satisfied: Good and service has been delivered Cash is collected.
C H A P T E R 18 REVENUE RECOGNITION
CONSTRUCTION CONTRACTS (revised 2002). Accounting Standard AS 7 formerly named as Accounting for Construction Contracts is issued by ‘Institute of Chartered.
ACCOUNTING STANDARD - 7 ACCOUNTING FOR CONSTRUCTION CONTRACTS J.P., KAPUR & UBERAI.
IAS 18 : Revenue The Institute of Chartered Accountants of India (Set up by an Act of Parliament)
IAS 11 - Construction Contracts. Academic Resource Center Revenue recognition including construction contracts Page 2 Recognition before delivery – construction.
Income Recognition and Measurement of Assets C hapter 18 COPYRIGHT © 2010 South-Western/Cengage Learning Intermediate Accounting 11th edition Nikolai Bazley.
Income Recognition and Measurement of Assets C hapter 18 COPYRIGHT © 2010 South-Western/Cengage Learning Intermediate Accounting 11th edition Nikolai Bazley.
Construction Contracts
Chapter 4--Learning Objectives 4 1.Understand the concept of recognition.
Accounting (Basics) - Lecture 8 Revenue. Contents Measurement of revenue Identification of the revenue transaction Sale of goods Rendering of services.
Financial Audit Autonomous Bodies AS 1 and 4 Session Accounting Standards.
© 2004 The McGraw-Hill Companies, Inc. McGraw-Hill/Irwin Chapter 5 Income Measurement and Profitability Analysis.
Chapter Chapter 18-2 C H A P T E R 18 REVENUE RECOGNITION Intermediate Accounting 13th Edition Kieso, Weygandt, and Warfield.
Revenue Recognition for the AE Industry Presented by: M. Scott Hursh, CPA, CCIFP®, CDA Managing Shareholder AE Industry Group Stambaugh Ness, PC Brian.
Construction Contracts: IAS 11 Wiecek and Young IFRS Primer Chapter 8.
Revenue.  Definition of Income: ◦ Income is increases in economic benefits during the accounting period in the form of inflows or enhancements of assets.
Revenue Recognition Intermediate Accounting,17E Stice | Stice | Skousen © 2010 Cengage Learning PowerPoint presented by: Douglas Cloud Professor Emeritus.
Ahmad Ismail.  What is IAS 18 Revenue?  Measurement of revenue  Recognition of revenue  Identification of transaction.
1 Chapter 3: The Measurement Fundamentals of Financial Accounting.
Chapter 18-1 Revenue Recognition Chapter18 Intermediate Accounting 12th Edition Kieso, Weygandt, and Warfield.
| International Accounting Standard 11 Construction Contract.
18 Construction Contracts (MFRS 111) Intermediate Accounting
Chapter 8 Revenue Recognition ACCT-3030.
Intermediate Accounting James D. Stice Earl K. Stice
Accounting for Construction Contracts (IAS 11)
Accounting for construction contracts (LKAS 11)
18 Construction Contracts (MFRS 111) Intermediate Accounting
LKAS 11: Construction Contracts
Revenue Recognition and Profitability Analysis
REVENUE AND EXPENSE RECOGNITION
Income Measurement and Profitability Analysis
INVENTORY VALUATION THEORY AND PRACTICE.
Inventories and construction contracts
IFRS 15 - Revenue from Contracts with Customers
C H A P T E R 18 REVENUE RECOGNITION
Presentation transcript:

Revenue Recognition Construction-Type and Production –Type Contracts ASC 605-35 Selected Highlights

Overview This subtopic provides guidance on accounting for the performance of contracts for the construction of facilities or production of goods or related services according to customer specifications. Problems arise particularly in connection with long-term contracts. Two methods are commonly followed: percentage-of-completion and completed-contract methods. Both methods involve estimates and uncertainties in three key areas: The extent of completion Contract revenues Contract costs

Scope Applies to all contractors Applies to contracts: Specifications are provided by the customer For the construction of facilities or production of goods or the provision of related services. Four broad types of contracts: Fixed price Cost-plus (cost-type) Time-and-material Unit-price

Recognition Determining accounting policy: Percentage-of-completion or completed-contract Two methods are not acceptable alternatives for the same circumstances Determining the profit center Assume each contract is a profit center Overcome this assumption if contracts meet the conditions for combining or segmenting contracts

Combining contracts Group of contracts that are closely related and are in effect parts of a single project. Report revenue and profit uniformly over the performance of the combined contracts. Criteria for combining: Negotiated as a package For a single project Closely interrelated construction activities with substanial common costs Performed concurrently or in a continuous sequence – same project management and location With a single customer

Segmenting contracts Includes elements or phases negotiated separately to perform without regard to the performance of others Segment if specified steps were taken and are documented and verifiable. Major factors that must be considered in determining total estimated revenue include: Basic contract price Contract options Change orders Claims Contract provisions for penalties and incentive payments

Provisions for losses on contracts Cost elements to be identified, estimated and accumulated with a reasonable degree of accuracy: Costs incurred to date Estimated costs to complete Provisions for losses on contracts If a loss is anticipated, GAAP requires recognition of the entire anticipated loss as soon as the loss becomees evident. This is true for both the percentage-of-completion and completed-contract methods.

Percentage-of-completion method Recognized income as work on a contract progresses May be estimated total income: based on total incurred costs to date relative to estimated total costs Or some other measure of progress towadr completion of work performed Units of delivery method is a modification of the percentage-of-completion method recognize as revenue the contract price of units delivered during a period Percentage-of-completion is appropriate if there is the ability to make reasonably dependable estimates of progress toward completion, contract revenues and contract costs.

In addition to the ability to make reasonably dependable estimates, all of the following conditions must exist: Contracts specify enforceable rights regarding goods/services to be provided, consideration to be exchanged, and the manner and terms of settlement Both the buyer and contractor can be expected to satisfy all obligations. An entity using the percentage-of-completion method as its basic accounting policy should use completed-contract method for a single contract (or group of contracts) if it cannot make reasonably dependable estimates.

Zero profit margin approach to applying the percentage-of-completion method Recommended for a situation where there is assurance that no loss will be incurred on a contract scope of the contract is ill-defined, but the contractor is protected by a cost-plus contract. Equal amounts of revenue and costs are presented on the income statement. A change to a more precise estimate of profit is a change in accounting estimate.

Completed-contract method Income is recognized only when a contract is completed or substantially completed. Provision is made for any expected losses. Use the completed contract method when there is a lack of dependable estimates or inherent hazards cause forecast to be doubtful. An entity may use the completed contract method for circumstances in which the financial statements would not vary materially from those resulting from use of the percentage-of-completion method (primarily short-term contracts).

Presentation Percentage-of-completion Completed-contract Assets = costs and recognized income not yet billed Liabilities= billings in excess of costs and recognized income Completed-contract Excess of accumulated costs over related billings is a current asset Accumulated billings over related costs is a liability