Building a Complex System in a Standards-Driven Environment

Slides:



Advertisements
Similar presentations
A good plan executed today is better than a perfect plan executed at some indefinite point in the future. -General George S. Patton, Jr.
Advertisements

Course: e-Governance Project Lifecycle Day 1
Components of a Product Vision/Strategy
S Y S T E M S E N G I N E E R I N G.
© 2009 The MITRE Corporation. All rights Reserved. Evolutionary Strategies for the Development of a SOA-Enabled USMC Enterprise Mohamed Hussein, Ph.D.
Applying the SOA RA Utah Public Safety ESB Project Utah Department of Technology Services April 10, 2008 Prepared by Robert Woolley.
© Prentice Hall CHAPTER 10 Alternative Approach: Purchasing Systems.
DoD Architecture Framework Overview
Acquiring Information Systems and Applications
Improving Your Business Results Six Sigma Qualtec Six Sigma Qualtec Six Sigma Qualtec – All Rights Reserved June 26, 2002 BEYOND SIX SIGMA: A HOLISTIC.
Moving from Analysis to Design
© 2004 Visible Systems Corporation. All rights reserved. 1 (800) 6VISIBLE Holistic View of the Enterprise Business Development Operations.
1 Samples The following slides are provided as samples and references for the Quarterly Reviews Additional slides will be added.
Lecture 13 Revision IMS Systems Analysis and Design.
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
PowerPoint Presentation for Dennis, Wixom & Tegarden Systems Analysis and Design Copyright 2001 © John Wiley & Sons, Inc. All rights reserved. Slide 1.
Health Informatics Series
Professor Michael J. Losacco CIS 1150 – Introduction to Computer Information Systems Systems Analysis and Design Chapter 12.
IMS Information Systems Development Practices
Acquiring Information Systems and Applications
Technical Integrity Assurance For Product Development W. Henson Graves Lockheed Martin Aeronautics Company Russ Campbell.
Software Evolution Planning CIS 376 Bruce R. Maxim UM-Dearborn.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 18 Slide 1 Software Reuse 2.
Systems Analysis and Design: The Big Picture
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 18 Slide 1 Software Reuse.
INFORMATION SYSTEM APPLICATIONS System Development Life Cycle.
Computers Are Your Future Eleventh Edition Chapter 13: Systems Analysis & Design Copyright © 2011 Pearson Education, Inc. Publishing as Prentice Hall1.
DoD Acquisition Domain (Sourcing) (DADS) Analysis of Alternatives (AoA) E-Business/SPS Joint Users’ Conference November 15-19, 2004 Houston, TX.
The Challenge of IT-Business Alignment
©Ian Sommerville 2000 Software Engineering, 6th edition. Slide 1 Component-based development l Building software from reusable components l Objectives.
Engineering System Design
Your Financial Work Defense Finance and Accounting Service DFAS Transformation Update March 2003.
Enterprise GIS Planning and Framework Jennifer Reek GIS Coordinator City of Brookfield, WI.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
ITIL Framework. What is ITIL ? ITIL stands for the Information Technology Infrastructure Library. ITIL is the international de facto management framework.
Acquiring Information Systems and Applications
McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 8 Moving from Analysis to Design.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
CHAPTER 13 Acquiring Information Systems and Applications.
Moving On To Design Chapter 9. Key Ideas The purpose of the analysis phase is to figure out what the business needs. The purpose of the design phase is.
Software Development Life Cycle by A.Surasit Samaisut Copyrights : All Rights Reserved.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
1 Moving On To Design Chapter 9. 2 Key Ideas The purpose of the analysis phase is to figure out what the business needs. The purpose of the design phase.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Copyright © 2014 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education.
Software Engineering Lecture 10: System Engineering.
Open Source in the Enterprise Agenda  Introductory remarks - Carl Bunje, Graham Bird & Walter Stahlecker  Open Source and Enterprise Architecture - Issues,
10-1 McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
The Information Systems Development Processes Chapter 9.
Information Systems Development
System Design, Implementation and Review
IS301 – Software Engineering V:
TIM 58 Continuing Ch 2: Project Management
Systems Analysis and Design in a Changing World, 4th Edition
Identify the Risk of Not Doing BA
THE FEASIBILTY STUDY LECTURE-5.
Harvard CRM Service Strategy
Information Systems Development
Chapter 1 (pages 4-9); Overview of SDLC
By Jeff Burklo, Director
Relationship between MRLs and AS6500
DoD Architecture Framework Overview
Module 2 Topics Information technology governance: Organization and planning for IS.
Enterprise Architecture at Penn State
Systems Architecture & Design Lecture 3 Architecture Frameworks
November 14, 2018 Bob Gross, MBA, CPHIMS
Presentation transcript:

Building a Complex System in a Standards-Driven Environment USAF Total Enterprise Skills Management & Learning Initiative

Agenda Description & Status BCA Development ConOps Revision Next Steps

Description & Status - Challenges USAF currently supports skills management and learning activities with over 200 individual systems Stove-piped environment prevents information sharing USAF standards, Command policies, Unit technical guidance, Civilian policies Mission planning challenged by lack of integrated support Full USAF Personnel (military, civilian, reserve & guard) capabilities not maximized Training management satisfaction for USAF personnel lower than organizations that permit individual support

Description & Status - Initiative Focused on maximizing currently active training investments Evaluating current situation to maximize success of future solution Targeting a stable solution that integrates all USAF personnel Integrating applicable standards (JTA-AF, AFMANs, etc.) Defining a feasible solution in terms of: Political Financial Technological Started with enterprise vision to revise Concept of Operations and prepare a Business Case Analysis

BCA Development – Step 1 Information Gathering Interview protocol driven Site Survey Defining Alternatives Current Capabilities Identified Gaps Functionality Data support Best Practices, Policies and Standards application Other military services Non-DoD Government Commercial organizations Essential functions & data matrix driven Vendor Survey

Essential Matrices Functions & Data

BCA Development – Step 2 Alternatives Measurement & Evaluation Mapped Essential Functions and Data to Alternatives Determined alternatives’ functionality subsets that COTS could accomplish Performed Cost Benefits Analysis (OMB 11, 94, 300) Total Ownership Cost Annual Savings Discounting (using mid-year values) Net Present Values Return On Investment Current System retirement rates based on available functionality

Cost Benefits Analysis Elements Site survey systems’ actual administration costs for baseline REVIC for custom development estimate Vendor COTS & hardware quotes Custom and COTS retirement rates definition Custom - based on REVIC COTS – modified Custom rates based on true OTS functionality Standard formulas for: TOC NPV ROI PBP

BCA Development – Step 3 Alternative De-selection Functionality expected User acceptance of implementation process Cost Benefits Analysis results Feasibility of COTS-based solution to speed development

ConOps Revision Concept of Operations description created in prior years Assumptions included based on existing technologies Details missing of needed functionality Improved support to mission planning through increased mission readiness Added integration of civilians Enhanced technology view Included capabilities defined by viable alternatives Being extended with development of more details in architecture products

Next Steps Requirements Definition (full SDLC support) High level SHALLs Based on Essential Functions Include support for Essential Data Architecture Development (DoD Architecture Framework) High Level Operations Concept Graphic (OV-1) in BCA Logical Data Model (OV-7) Underway Preparing in DDDS format using DDA components Operational Node Connectivity Diagram (OV-2) & System Interface Description (SV-1) planned next