AM-LINERII® INSTALLATION PROCEDURE Charles A. Munson 9/21/2018.

Slides:



Advertisements
Similar presentations
Close Fit Pipe Lining. Overview Close Fit Pipe Lining is an internationally recognised technique which involves inserting a compact pipe or sleeve into.
Advertisements

CRIMPING Introduction
ACTIVE LEARNING PROCESS
Power Plant Engineering
Mountings & Accessories
Valley City State University | Facilities Services
Wastewater Collection & Maintenance Division From left to right, Don Patton, Scott Stemen, Matt Agner, Dave Shrider, Gary Carter, Richard Beasley, John.
Chapter 8: Duct Design and Sealing To be used with the Guide to Building Energy Efficient Homes in Kentucky.
Setup/Installation/Operation of an Environmental Control Unit (ECU)
1 HVACR316 – Piping Tubing and Piping. 2 Purposes of Tubing and Piping Provides a path for refrigerant to take Provides a means to return oil to the compressor.
Breaking, Measuring, and Adjusting Chain ~The most used drive system on a FIRST robot uses chains and sprockets. Understanding the proper techniques to.
Installation. Indoor Unit Installation Typical Installation.
Copar Corporation 5744 W. 77 th St. Burbank Il Thermocouple Installation Instructions.
TUBING AND PIPING.
Simple Pressure Control Valves
Section 16.3 Using Heat.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
Installation. Indoor Unit Installation Typical Installation.
Chapter 19 Charging Systems.
STEAM HEATING.
Hydronic Mechanical Controls
“We Bring Engineering to Life” U.S. Tobacco GAP – Barn Testing Procedure.
Installation. Indoor Unit Installation Typical Installation.
The DUCTZ Experience. A Brief Overview of how DUCTZ Cleans a Heating and Cooling System.
Percussion drilling By Batch -2. Percussion drilling Cable Tool Drilling Percussion drills have been used to drill thousands of feet, though they are.
Cutting and Swaging Tubing
Presentation Dungrani rakesh v. Div : a Branch : mechenical Sem : 1 st.
COMPONENT IDENTIFICATION AND INSTALLATION GUIDELINES FLOODBREAK, AUTOGATE FloodBreak, L.L.C Post Oak Blvd., Suite 5850 Houston, Texas
VILLAGE OF SHOREWOOD PPII REDUCTION PROGRAM. Shorewood’s response to the 2010 flooding has been direct and decisive Immediately start identifying problems.
Water & Sewer CCTV Inspection Methods & Techniques
Pipe Inspection and Trenchless Rehabilitation WIOG May 2017
GROUND SERVICING OF VARIOUS SUB SYSTEMS
3.03 Understand support services PP2
Welding Welding should not be performed except in designated areas. Any part to be welded should be removed from the aircraft, if possible. Repair would.
Overview control systems examples of control systems diagrams
Automotive Heating And Air Conditioning
GROUND SERVICING OF VARIOUS SUB SYSTEMS
AND AFTER INSTALLATION Technical Director, NASSCO
3.03 Understand support services
14 Refrigerant Recovery, Recycling, and Recharging.
North Central Florida Local Emergency Planning Committee
Lockout/tagout Refresher training
TRENCHLESS TECHNOLOGY
Mechanical Aspiration
Leakage control in transmission pipelines
Soldering Technique.
SAFE WORK INSTRUCTIONS
Thermoforming Process
Valves.
WATER MAIN REHABILITATION
Desuperheater Heat Transfer Device Manufactured by Maniks
Electrical Gas Plumbing Heating & Cooling
Student CD for Commercial Refrigeration for A/C Technicians Chapter 12 Ice Machines.
3.03 Understand support services
Roof Top Unit Overview (MAGNUM)
Horizontal Installation Overview
FREE CONVECTION – FIXED POWER TD1005
3.03 Understand support services
Power Plant Engineering. Boilers Boilers Boiler is an apparatus to produce steam. Thermal energy released by combustion of fuel is used to make steam.
STEAM CONDENSERS AND COOLING TOWERS Marks-16
Wiring the Light and Relay
TRENTON Casing Filler Presentation
North Central Florida Local Emergency Planning Committee
Rajan Bhandari Senior Lecturer
3.03 Understand support services PP2
3.03 Understand support services
Lockout/tagout Refresher Training
Sterile Technique.
3.03 Understand support services
3.03 Understand support services
Presentation transcript:

AM-LINERII® INSTALLATION PROCEDURE Charles A. Munson 9/21/2018

Introduction This presentation is intended to give an overview of the procedures and techniques used to install the AM-LINERII PVC pipeline rehabilitation system. 9/21/2018

SEQUENCE OF EVENTS Pre-Installation closed circuit television inspection Pre-installation pipeline preparation Installation technique Post-installation closed circuit television inspection Reinstatement of service connections 9/21/2018

PRE-INSTALLATION CLOSED CIRCUIT TELEVISION INSPECTION Identify any conditions in the pipeline that could impede or prevent the proper installation of the liner Provide a record of the pre-lined condition of the pipe Accurately record the position of all service connections 9/21/2018

PRE-INSTALLATION CLOSED CIRCUIT TELEVISION INSPECTION A highly trained operator uses a remotely controlled CCTV camera to assess the condition of the pipeline. As the camera passes through the pipeline, images from the camera are monitored by the operator and recorded either in DVD or VHS format. The operator makes a record of the position of all service connections and defects in the pipeline. 9/21/2018

PIPELINE PREPARATION Typical pipeline conditions that must be remediated prior to lining: Roots Large quantities of groundwater infiltration Collapsed pipe Dropped Joints or offsets of more than 12.5% of the inside pipe diameter Protruding taps 9/21/2018

PIPELINE PREPARATION ROOTS Roots must be removed from the pipeline prior to installing the liner. Roots may be removed by using a chemical root treatment or by mechanical means such as chain flails. 9/21/2018

PIPELINE PREPARATION INFILTRATION Large quantities of cold ground water flowing into the pipeline, can act as a heat sink and prevent the PVC liner material from reaching the temperature needed to form properly. Infiltration may be eliminated either by chemical grouting or installing a patch prior to lining. 9/21/2018

PIPELINE PREPARATION COLLAPSED PIPE Collapsed pipe, dropped or offset joints that reduce the inside circumference of the pipeline to less than the outside circumference of the pipe liner will not allow the liner to form properly. This condition is usually presented as a longitudinal rib after the liner is installed. To avoid ribs in the liner, sections of pipeline containing collapsed pipe, dropped or offset joints should be point repaired prior to lining. COLLAPSED PIPE 9/21/2018

PIPELINE PREPARATION PROTRUDING TAPS Service taps that protrude into the pipeline more than 12.5% or 1-inch should be cut off using a chain flail or remotely controlled grinder. 9/21/2018

PIPELINE PREPARATION CLEANING Prior to insertion of the liner, the pipeline is cleaned using a high pressure water jet to remove any debris in the pipeline. 9/21/2018

LINER INSTALLATION Heating the coil of liner Attaching the liner to the pulling cable Insertion of the liner into the host pipe Stress Relief Processing the liner 9/21/2018

LINER INSTALLATION The coil of AM-LINERII is brought to the jobsite and loaded into an enclosed trailer to be heated. 9/21/2018

LINER INSTALLATION Preparing Pulling Nose The pulling nose is made by folding the flat liner in half longitudinally, drilling holes perpendicularly through the folded liner, then weaving a cable or chain through the holes. The entire section is then wrapped with duct tape. The end of the liner is heated to make it pliable. 9/21/2018

LINER INSTALLATION The coil of liner is heated by steam in the trailer. The liner is heated until it is as pliable as wet leather. Heating time will vary depending on ambient temperature, altitude and steam quality. 9/21/2018

LINER INSTALLATION A cable that has been strung from a winch at the downstream manhole, through the pipeline to the upstream manhole is attached to the pulling nose. 9/21/2018

LINER INSTALLATION The liner is pulled into the host pipe either directly as shown in the picture on the left or through the patented shaping device shown on the right. 9/21/2018

LINER INSTALLATION The speed at which the liner is inserted into the pipeline is coordinated using two way radio. 9/21/2018

LINER INSTALLATION The liner is pulled to above ground level at the downstream manhole. When the liner reaches the maximum above ground length allowed by the pulley system the winch is locked in that position. 9/21/2018

LINER INSTALLATION STRESS RELIEF The liner is cut off above ground level at the upstream manhole. A flow through plug with the steam hose attached is inserted into the end of the liner. Steam under low pressure is forced into the liner. As the liner material heats induced stress is relieved, this is indicated by movement of the liner. This process continues until no movement of the liner is observed. 9/21/2018

LINER INSTALLATION STRESS RELIEF Upstream manhole Downstream manhole After all movement has ceased at the upstream end, the excess liner is trimmed and the process plug installed. The brake on the winch at the downstream manhole is released. Steam is applied to the liner through the plug at the upstream manhole. The stress relief process is repeated for the downstream end of the liner until all movement has stopped. Upstream manhole Downstream manhole 9/21/2018

LINER INSTALLATION Processing After the stress relief process is complete, the excess liner material is cut away and a flow-through plug installed. The hose from the plug is connected to the downstream exhaust manifold. The steam temperature and pressure is monitored and controlled at this process station. 9/21/2018

LINER INSTALLATION Processing The liner is heated using low pressure steam supplied by a boiler at the upstream end. Heating time is determined by the length, and SDR of the liner. Additional heating time may be added by the installer if warranted by conditions within the host pipe. 9/21/2018

LINER INSTALLATION Forming and Cooling At the end of the heating time the process is switched from steam to compressed air. The operator at the downstream manifold quickly increases the internal pressure of the liner causing it to expand and conform tightly to the interior of the host pipe. Internal pressure is maintained until the exhaust air temperature has reached a predetermined temperature. Water may be induced into the compressed air during the cooling process to reduce the cooling time. 9/21/2018

POST INSTALLATION CCTV INSPECTION After the liner has been cooled, the flow through plugs are removed and the liner is inspected using CCTV. The operator inspects the liner to make sure that the it has formed properly and that there are no defects in the liner. 9/21/2018

REINSTATEMENT OF SERVICE CONNECTIONS Services are reconnected using a remotely controlled robotic cutter 9/21/2018

REINSTATEMENT OF SERVICE CONNECTIONS CCTV Camera Robotic Cutter Cutter Operator 9/21/2018

REINSTATEMENT OF SERVICE CONNECTIONS In most cases the service connection is located by means of a pronounced dimple in the liner. When the dimple is not clearly visible, the cutter operator refers to the pre-installation inspection tape and the previously recorded position of all the service connections. 9/21/2018

REINSTATEMENT OF SERVICE CONNECTIONS Service connections are reinstated using a remotely controlled cutting device. When reinstated the hole for the connection must be smooth and conform to the inside shape of the old opening. The hole must be a maximum of 105% and a minimum of 90% of the service pipe diameter. 9/21/2018

FINISHING TOUCHES The ends of the liner are neatly trimmed leaving one to one and one half inches of liner extending into the manhole. 9/21/2018

AM-LINERII Installation advantages No refrigeration required for storage and transportation No hazardous chemicals to mix No noxious odors The liner is manufactured in a controlled environment not in the ground under unstable conditions The installation process does not change the physical properties of the liner material Simple installation procedure 9/21/2018