Chapter 8 Aggregate Planning in the Supply Chain

Slides:



Advertisements
Similar presentations
PowerPoint Presentation
Advertisements

Strategic Decisions (Part II)
Operations Management Contemporary Concepts and Cases Chapter Twelve Capacity Planning Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.
© 2004 Prentice-Hall, Inc. 8-1 Chapter 8 Aggregate Planning in the Supply Chain Supply Chain Management (3rd Edition)
Aggregate Planning in a Supply Chain
IES 371 Engineering Management Chapter 14: Aggregate Planning
3. Aggregate Planning. Aggregate Planning  Provides the quantity and timing of production for intermediate future Usually 3 to 18 months into future.
Chapter 12 Aggregate Planning.
PRODUCTION AND OPERATIONS MANAGEMENT
Aggregate Planning in a Supply Chain
19–1. 19–2 Chapter Nineteen Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Aggregate Planning.
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
Aggregate Planning Ash Soni ODT Department Kelley School of Business.
Chapter 8 Aggregate Planning in a Supply Chain
Strategic Capacity Planning Defined
© 2007 Pearson Education Sales and Operations Planning Chapter 14.
Supply Chain Management Lecture 14. Outline February 25 (Today) –Network design simulation description –Chapter 8 –Homework 4 (short) March 2 –Chapter.
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning Delivered by: Eng.Mosab I. Tabash Eng.Mosab I. Tabash.
Utdallas.edu/~metin 1 Planning Demand and Supply in a Supply Chain Forecasting and Aggregate Planning Chapter 8.
Operations Planning Horizons
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Aggregate Production Planning (APP) Slide Set #8.
IES 303 Engineering Management & Cost Analysis | Dr. Karndee Prichanont, SIIT 1 Learning Objectives:  Understand the concepts and methods of aggregate.
Aggregate Planning.
1 Slides used in class may be different from slides in student pack Chapter 16 Aggregate Sales and Operations Planning  Operations Planning Overview 
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 13 Aggregate Planning.
Planning Demand and Supply in a Supply Chain
OM4-1Aggregate Planning Chapter 14. OM4-2Aggregate Planning Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering.
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning PowerPoint presentation to accompany Heizer/Render Principles of.
Contents Introduction Aggregate planning problem
Operations Management Aggregate Planning
8-1 Aggregate Planning in the Supply Chain Supply Chain Management.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Aggregate Planning and Master Scheduling
CHAPTER 8 CAPACITY. THE CONCEPT Maximum rate of output for a process Inadequate capacity can lose customers and limit growth while excess capacity can.
Operations Fall 2015 Bruce Duggan Providence University College.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 5e 1-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall.
Planning Horizons Today3 Months 1 year5 years Planning Horizon Short-range plans Job assignments Ordering Job scheduling Dispatching Intermediate-range.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 16 Sales and Operations Planning.
© 2007 Pearson Education Sales and Operations Planning.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Aggregate Planning.
Aggregate Planning. Session Break Up Aggregate Planning Master Production Schedule.
Visual 3-1 Sales and Operations Planning Purpose of Sales and Operations Planning General Design of Sales and Operations Planning Approaches to Sales and.
AGGREGATE PLANNING IN A SUPPLY CHAIN MEMBERS SAMSON AKYOO 1100 ERNEST MBEZI 1129 GLADYS G. YAMBESI 1151 MWETE AMISI ALI 1152 ANZURUNI B. MALISAWA 1153.
Supply Chain Management By Dr. Asif Mahmood Chapter 9: Aggregate Planning.
9 Sales and Operations Planning: Planning Supply and Demand in a Supply Chain.
LESSON 2 Sales and Operations Planning (S&OP) and Aggregate Planning
OPERATIONS MANAGEMENT: Creating Value Along the Supply Chain,
Sales and Operations Planning
SALES AND OPERATIONS PLANNING AGGREGATE PLANNING PRODUCTION PLANNING OPERATIONS PLANNING How to meet effectively and efficiently forecasted requirements.
Chapter 9 Sales and Operations Planning
Planning Supply and Demand in a Supply Chain
Chapter 14 Aggregate Planning.
13 Aggregate Scheduling PowerPoint presentation to accompany
BUAD306 Aggregate Planning.
Operations Management
Basic Strategies Level capacity strategy: Chase demand strategy:
13 Aggregate Planning.
Chapter 8 Aggregate Planning in the Supply Chain
9 Sales and Operations Planning: Planning Supply and Demand in a Supply Chain.
Aggregate Planning FAISAL FARIS BIN RAHIM
Beni Asllani University of Tennessee at Chattanooga
Chapter 8 Aggregate Planning in the Supply Chain
Supply Chain Management Lecture 3
Fundamentals of Production Planning and Control
Supply Chain Management (3rd Edition)
Dr Sh Salleh bin Sh Ahmad
13 Aggregate Scheduling PowerPoint presentation to accompany
Production and Operations Management
Presentation transcript:

Chapter 8 Aggregate Planning in the Supply Chain

Outline Role of aggregate planning in a supply chain The aggregate planning problem Aggregate planning strategies Implementing aggregate planning in practice

Role of Aggregate Planning in a Supply Chain Capacity has a cost, lead times are greater than zero Aggregate planning: process by which a company determines levels of capacity, production, subcontracting, inventory, stockouts, and pricing over a specified time horizon goal is to maximize profit decisions made at a product family (not SKU) level time frame of 3 to 18 months how can a firm best use the facilities it has?

Role of Aggregate Planning in a Supply Chain Specify operational parameters over the time horizon: production rate workforce overtime machine capacity level subcontracting backlog inventory on hand All supply chain stages should work together on an aggregate plan that will optimize supply chain performance

The Aggregate Planning Problem Given the demand forecast for each period in the planning horizon, determine the production level, inventory level, and the capacity level for each period that maximizes the firm’s (supply chain’s) profit over the planning horizon Specify the planning horizon (typically 3-18 months) Specify the duration of each period Specify key information required to develop an aggregate plan

Information Needed for an Aggregate Plan Demand forecast in each period Production costs labor costs, regular time ($/hr) and overtime ($/hr) subcontracting costs ($/hr or $/unit) cost of changing capacity: hiring or layoff ($/worker) and cost of adding or reducing machine capacity ($/machine) Labor/machine hours required per unit Inventory holding cost ($/unit/period) Stockout or backlog cost ($/unit/period) Constraints: limits on overtime, layoffs, capital available, stockouts and backlogs

Outputs of Aggregate Plan Production quantity from regular time, overtime, and subcontracted time: used to determine number of workers and supplier purchase levels Inventory held: used to determine how much warehouse space and working capital is needed Backlog/stockout quantity: used to determine what customer service levels will be Machine capacity increase/decrease: used to determine if new production equipment needs to be purchased A poor aggregate plan can result in lost sales, lost profits, excess inventory, or excess capacity

Aggregate Planning Strategies Trade-off between capacity, inventory, backlog/lost sales Chase strategy – using capacity as the lever Time flexibility from workforce or capacity strategy – using utilization as the lever Level strategy – using inventory as the lever Mixed strategy – a combination of one or more of the first three strategies

Chase Strategy Production rate is synchronized with demand by varying machine capacity or hiring and laying off workers as the demand rate varies However, in practice, it is often difficult to vary capacity and workforce on short notice Expensive if cost of varying capacity is high Negative effect on workforce morale Results in low levels of inventory Should be used when inventory holding costs are high and costs of changing capacity are low

Time Flexibility Strategy Can be used if there is excess machine capacity Workforce is kept stable, but the number of hours worked is varied over time to synchronize production and demand Can use overtime or a flexible work schedule Requires flexible workforce, but avoids morale problems of the chase strategy Low levels of inventory, lower utilization Should be used when inventory holding costs are high and capacity is relatively inexpensive

Level Strategy Maintain stable machine capacity and workforce levels with a constant output rate Shortages and surpluses result in fluctuations in inventory levels over time Inventories that are built up in anticipation of future demand or backlogs are carried over from high to low demand periods Better for worker morale Large inventories and backlogs may accumulate Should be used when inventory holding and backlog costs are relatively low

Fundamental Tradeoffs in Aggregate Planning Capacity (regular time, overtime, subcontract) Inventory Backlog / lost sales Basic Strategies Chase strategy Time flexibility from workforce or capacity Level strategy Notes:

Aggregate Planning at Red Tomato Tools Notes:

Aggregate Planning at Red Tomato Tools Notes:

Aggregate Planning at Red Tomato Tools (Define Decision Variables) Wt = Workforce size for month t, t = 1, ..., 6 Ht = Number of employees hired at the beginning of month t, t = 1, ..., 6 Lt = Number of employees laid off at the beginning of month t, t = 1, ..., 6 Pt = Production in month t, t = 1, ..., 6 It = Inventory at the end of month t, t = 1, ..., 6 St = Number of units stocked out at the end of month t, t = 1, ..., 6 Ct = Number of units subcontracted for month t, t = 1, ..., 6 Ot = Number of overtime hours worked in month t, t = 1, ..., 6 Notes:

Aggregate Planning at Red Tomato Tools (Define Objective Function) Notes:

Workforce size for each month is based on hiring and layoffs Aggregate Planning at Red Tomato tools (Define Constraints Linking Variables) Workforce size for each month is based on hiring and layoffs Notes:

Aggregate Planning at Red Tomato Tools (Constraints) Production for each month cannot exceed capacity Notes:

Aggregate Planning at Red Tomato Tools (Constraints) Inventory balance for each month Notes:

Aggregate Planning at Red Tomato Tools (Constraints) Over time for each month Notes:

Scenarios Increase in holding cost (from $2 to $6) Overtime cost drops to $4.1 per hour Increased demand fluctuation Notes:

Increased Demand Fluctuation Notes:

Aggregate Planning in Practice Think beyond the enterprise to the entire supply chain Make plans flexible because forecasts are always wrong Rerun the aggregate plan as new information emerges Use aggregate planning as capacity utilization increases

Aggregate Planning in Excel Construct a table with the decision variables Construct a table for constraints Create a cell containing the objective function Use Data Analysis Solver

INVENTORY PLANNING AND ECONOMIC THEORY -ABERRATIONS Available evidence indicates that Indian industries, by and large do not show any serious concern for inventory ordering and carrying costs. What are the main reasons for their indifference to scientific inventory management techniques? What adaptations of Just In Time (JIT) practices do you visualize emerging in the Indian environment in the near future?

Summary of Learning Objectives What types of decisions are best solved by aggregate planning? What is the importance of aggregate planning as a supply chain activity? What kinds of information are needed to produce an aggregate plan? What are the basic trade-offs a manager makes to produce an aggregate plan? How are aggregate planning problems formulated and solved using Microsoft Excel?