Neutrino Oscillation Physics with a Neutrino Factory

Slides:



Advertisements
Similar presentations
MINOS+ Starts April 2013 for three years April
Advertisements

Sergio Palomares-Ruiz June 22, 2005 Super-NO A Based on O. Mena, SPR and S. Pascoli hep-ph/ a long-baseline neutrino experiment with two off-axis.
Precision Neutrino Oscillation Measurements & the Neutrino Factory Scoping Study for a Future Accelerator Neutrino Complex – Discussion Meeting Steve Geer,
Expected Sensitivity of the NO A  Disappearance Analysis Kirk Bays (Caltech) for the NO A Collaboration April 14, 2013 APS DPF Denver Kirk Bays, APS DPF.
A long-baseline experiment with the IHEP neutrino beam Y. Efremenko detector Presented by.
Neutrino Oscillation Physics at a Neutrino Factory Rob Edgecock RAL/CERN-AB.
Near Detector Working Group for ISS Neutrino Factory Scoping Study Meeting 24 January 2006 Paul Soler University of Glasgow/RAL.
K.T. McDonald March 18, 2010 LArTPC BNL 1 Magnetizing a Large Liquid Argon Detector Kirk T. McDonald Princeton University (March 18, 2010)
Neutrino physics: experiments and infrastructure Anselmo Cervera Villanueva Université de Genève Orsay, 31/01/06.
Segmented magnetised detectors Anselmo Cervera Villanueva Universidad de Valencia ISS meeting RAL (UK) 25/04/06 RAL (UK) 25/04/06.
Preliminary Ideas for a Near Detector at a Neutrino Factory Neutrino Factory Scoping Study Meeting 23 September 2005 Paul Soler University of Glasgow/RAL.
INDIA-BASED NEUTRINO OBSERVATORY (INO) STATUS REPORT Naba K Mondal Tata Institute of Fundamental Research Mumbai, India NUFACT Scoping Study Meeting at.
Summary Near Detector at IDS Meeting in FNAL EuroNu Annual General Meeting, Strasbourg 3 June 2010 Paul Soler.
Alain Blondel Neutrino Factory scenarios I will endeavour to address some principle design issues related to the physics use of high intensity muon beams.
WP5: Detector Performance and Cost EuroNu Launch Meeting 5 February 2008 Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera Villanueva,
Caren Hagner CSTS Saclay Present And Near Future of θ 13 & CPV in Neutrino Experiments Caren Hagner Universität Hamburg Neutrino Mixing and.
Summary Detector Working Group Neutrino Factory International Design Study Meeting 17 January 2008 Paul Soler.
Large Magnetic Calorimeters Anselmo Cervera Villanueva University of Geneva (Switzerland) in a Nufact Nufact04 (Osaka, 1/8/2004)
2 Atmospheric Neutrinos Atmospheric neutrino detector at Kolar Gold Field –1965.
Dec. 13, 2001Yoshihisa OBAYASHI, Neutrino and Anti-Neutrino Cross Sections and CP Phase Measurement Yoshihisa OBAYASHI (KEK-IPNS) NuInt01,
The NOvA Experiment Ji Liu On behalf of the NOvA collaboration College of William and Mary APS April Meeting April 1, 2012.
WP5: Detector Performance and Cost EuroNu Meeting CERN, 26 March 2009 Paul Soler Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera.
Road Map of Future Neutrino Physics A personal view Ken Peach Round Table discussion at the 6 th NuFACT Workshop Osaka, Japan 26 th July – 1 st August.
Alain Blondel. AIDA-Neutrino meeting AIDA Neutrino detector studies 1. News from the neutrino scene 2. Beam requirements for AIDA 3. Discuss.
Preliminary Results from the MINER A Experiment Deborah Harris Fermilab on behalf of the MINERvA Collaboration.
Latest Results from the MINOS Experiment Justin Evans, University College London for the MINOS Collaboration NOW th September 2008.
Extrapolation Neutrino Flux measured at Near Detector to the Far Detector Near Detector Workshop, CERN, 30 July 2011 Paul Soler, Andrew Laing.
Neutrino Factories Andrea Donini Instituto de Física Teórica/Instituto de Física Corpuscular CSIC European Strategy for Neutrino Oscillation Physics -
NuMI Off-Axis Experiment Alfons Weber University of Oxford & Rutherford Appleton Laboratory EPS2003, Aachen July 19, 2003.
How to extract Neutrino Factory flux from IMD and neutrino elastic scattering? Near Detector Workshop, CERN, 30 July 2011 Paul Soler.
Search for Electron Neutrino Appearance in MINOS Mhair Orchanian California Institute of Technology On behalf of the MINOS Collaboration DPF 2011 Meeting.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
Detector possibilities: scintillator based detectors EUCARD 1 st Annual Meeting, RAL, 13 April 2010 Paul Soler.
1 Study of physics impacts of putting a far detector in Korea with GLoBES - work in progress - Eun-Ju Jeon Seoul National University Nov. 18, 2005 International.
MIND Systematic Errors EuroNu Meeting, RAL 18 January 2010 Paul Soler.
TTdF – EPS Conference Manchester (UK), July 2007 Neutrino hiererchy from atmospheric and beta beam neutrinos with high density magnetised detectors [1]
Detector: Status and Plans 6 th IDS-NF Meeting, RAL, 22 September 2010 Paul Soler.
Observation Gamma rays from neutral current quasi-elastic in the T2K experiment Huang Kunxian for half of T2K collaboration Mar. 24, Univ.
Near Detector Tasks EuroNu Meeting, CERN 26 March 2009 Paul Soler.
T2K Experiment Results & Prospects Alfons Weber University of Oxford & STFC/RAL For the T2K Collaboration.
Precision Measurement of Muon Neutrino Disappearance with T2K Alex Himmel Duke University for the The T2K Collaboration 37 th International Conference.
Final Results from IDS-NF Study NUFACT14 Workshop, Glasgow on behalf of the IDS-NF Collaboration Paul Soler, 26 August 2014.
New Results from MINOS Matthew Strait University of Minnesota for the MINOS collaboration Phenomenology 2010 Symposium 11 May 2010.
Neutral Current Interactions in MINOS Alexandre Sousa, University of Oxford for the MINOS Collaboration Neutrino Events in MINOS Neutrino interactions.
Institute for Advanced Study, Princeton
Neutrino factory near detector simulation
EURONu Collaboration Board,
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
The Accelerator Complex from the International Design Study
Preliminary T2K beam simulation using the G4 2km detector
Neutrino beams from the decay of muons
Detector Baseline EuroNu Meeting, RAL 20 January 2010 Paul Soler.
Wrong sign muons detection in a
nuSTORM at Fermilab D Adey
Status of the OPERA experiment
A LARGE ATMOSPHERIC NEUTRINO DETECTOR USING RESISTIVE PLATE CHAMBERS
nuSTORM: Neutrinos from STORed Muons
Accelerator R&D for Future Neutrino Projects
SOLAR ATMOSPHERE NEUTRINOS
High g Li/B b-Beam Enrique Fernández-Martínez, MPI für Physik Munich
T2KK sensitivity as a function of L and Dm2
T2KK Sensitivity of Resolving q23 Octant Degeneracy
Fine-Grained Near Detector(s) at JHF: Purpose and Thoughts
Naotoshi Okamura (YITP) NuFact05
Toward realistic evaluation of the T2KK physics potential
Impact of neutrino interaction uncertainties in T2K
Determination of Neutrino Mass Hierarchy at an Intermediate Baseline
Oscillation Physics at INO
Presentation transcript:

Neutrino Oscillation Physics with a Neutrino Factory EPS-HEP Conference, Grenoble on behalf of IDS-NF Collaboration Paul Soler, 21 July 2011

EPS-HEP, Grenoble: 21st July 2011 International Design Study International Design Study for a Neutrino Factory (IDS-NF) Principal objective: deliver Reference Design Report by 2013 Physics performance of the Neutrino Factory Specification of each of the accelerator, diagnostic, and detector systems that make up the facility Schedule and cost of the Neutrino Factory accelerator, diagnostics, and detector systems. Co-sponsored by EU through EUROnu Web site: https://www.ids-nf.org/wiki/FrontPage Interim Design Report: IDS-NF-020 delivered in 2011 IDR was used to measure progress in planning for these facilities and detailed performance parameters at half way point of study Reviewed by International Panel organised by ECFA, chaired by Prof Francis Halzen (Wisconsin), at Daresbury Lab on 5-6 May 2011 Report this afternoon at joint ECFA-EPS session EPS-HEP, Grenoble: 21st July 2011

EPS-HEP, Grenoble: 21st July 2011 Neutrino Factory Baseline Two Magnetised Iron Neutrino Detectors (MIND): 100 kton at 2500-5000 km 50 kton at 7000-8000 km Baseline constantly under review in light of new physics results EPS-HEP, Grenoble: 21st July 2011

EPS-HEP, Grenoble: 21st July 2011 Physics Case for a Neutrino Factory EPS-HEP, Grenoble: 21st July 2011

Neutrino Oscillations in Matter Matter oscillation results for three neutrinos: (MSW effect) Minakata & Nunokawa JHEP 2001 where is for EPS-HEP, Grenoble: 21st July 2011

Neutrino Oscillations in Matter Matter oscillation results for three neutrinos: (MSW effect) Only one term in equation Magic baseline: Clean determination of q13 Magic baseline only depends on value of density of Earth where is for EPS-HEP, Grenoble: 21st July 2011

EPS-HEP, Grenoble: 21st July 2011 Neutrino Oscillation fits Global fit provides: sin2q12=0.312+0.017-0.015 Dm212 =7.59+0.20-0.18×10-5 eV2 sin2q23=0.510.06 Dm312=2.450.09×10-3 eV2 Schwetz, Tortola, Valle Normal Inverted Hints for non-zero q13: NH(IH) T2K: 0.03(0.04)<sin2q13<0.28(0.34) (2.5s) MINOS: 0<sin2q13<0.12(0.19) (1.7s) Reactors: sin2q13=0.023+0.016-0.013 (2.3s) Combined: sin2q13=0.021(0.025)±0.007 Yet to be defined in detail: Confirm q13 value Is q23=p/4,<p/4 or >p/4? Mass hierarchy: sign Dm312 CP violation phase d EPS-HEP, Grenoble: 21st July 2011 Fogli et al.

EPS-HEP, Grenoble: 21st July 2011 Neutrino Factory Accelerator and Detectors EPS-HEP, Grenoble: 21st July 2011

EPS-HEP, Grenoble: 21st July 2011 Neutrino Factory Baseline Proton driver Proton beam ~8 GeV on target Target, capture and decay Create p, decay into m (MERIT) Bunching and phase rotation Reduce DE of bunch Cooling Reduce transverse emittance (MICE) Acceleration 120 MeV 25 GeV with RLAs and FFAG Decay rings Store for ~1000 turns Long straight sections Neutrino spectra calculable to high accuracy See poster on Neutrino Factory accelerator facility EPS-HEP, Grenoble: 21st July 2011

Baseline for a Neutrino Factory: MIND Golden channel signature: appearance of “wrong-sign” muons in magnetised iron calorimeter Magnetic Iron Neutrino Detector (MIND) IDS-NF simulations for 25 GeV NuFact: Two far detectors: 2500-5000 km baseline: 100 kton 7000-8000 km (magic) baseline: 50 kton Appearance of “wrong-sign” muons Segmentation: 3 cm Fe + 2 cm scintillator n 50% wrong sign muon detector 50-100 m long 14mx14mx3cm plates Toroidal magnetic field: 1.0-2.2 T Engineering well advanced See poster on Neutrino Factory detectors EPS-HEP, Grenoble: 21st July 2011

EPS-HEP, Grenoble: 21st July 2011 MIND analysis Curvature error (CC rejection) and NC rejection Num hits > 150 nm-CC nm-CC CC signal nm-CC nm-CC Kinematic cuts: Neutrino energy (En=Em+Ehad) vs EPS-HEP, Grenoble: 21st July 2011

MIND: CC and NC background Analysis with Nuance and GEANT4: anti-numu as numu numu as anti-numu CC background NC as numu NC as anti-numu NC background EPS-HEP, Grenoble: 21st July 2011

MIND: ne background and signal Analysis with Nuance and GEANT4: nue as numu anti-nue as anti-numu nue background numu efficiency anti-numu efficiency Signal efficiencies EPS-HEP, Grenoble: 21st July 2011

EPS-HEP, Grenoble: 21st July 2011 Near Detectors Near detector: Neutrino flux (<1% precision) and extrapolation to far detector Charm production (main background) and taus for Non Standard Interactions (NSI) searches Cross-sections and other measurements (ie PDFs, sin2qW) n beam 3 m B>1 T ~20 m High Res Detector Mini-MIND Vertex Detector Two options EPS-HEP, Grenoble: 21st July 2011

EPS-HEP, Grenoble: 21st July 2011 Performance of a Neutrino Factory with MIND EPS-HEP, Grenoble: 21st July 2011

Flexible design of Neutrino Factory Optimisation for one baseline as function of q13 Contours of CP coverage For large q13: Energy 10 GeV Baseline 2000 km 100 kton MIND For small q13: Energy ~25 GeV Baseline ~4000 km 100 kton MIND EPS-HEP, Grenoble: 21st July 2011

Neutrino Factory performance Optimised performance for small q13 (25 GeV, two detectors) and large q13 (10 GeV, 100 kton detector) MIND analysis Performance based on 5 GeV, 1300 km, 20 kton Totally Active Scintillator Detector (TASD, magenta) EPS-HEP, Grenoble: 21st July 2011

Neutrino Factory performance Optimised performance for small q13 (25 GeV, two detectors) and large q13 (10 GeV, 100 kton detector) MIND analysis EPS-HEP, Grenoble: 21st July 2011

Neutrino Factory performance Comparison Neutrino Factory and other facilities Neutrino Factory outperforms all other facilities EPS-HEP, Grenoble: 21st July 2011

EPS-HEP, Grenoble: 21st July 2011 Conclusions International Design Study is progressing on course Interim Design Report delivered March 2011 We had successful ECFA review May 2011 (final report due soon) On target to produce Reference Design Report, including performance and costs by 2013 Main concepts for accelerator systems have been defined Main areas of work are at interfaces between components Two Magnetised Iron Neutrino Detectors (MIND) at standard Neutrino Factory (25 GeV) is small q13 baseline: 2500-5000 km with100 kton mass 7000-8000 km (magic baseline) with 50 kton 10 GeV Neutrino Factory with one 100 kton MIND shows best performance for large q13 (sin2 q13> 10-2) Conceptual design for near detector being established EPS-HEP, Grenoble: 21st July 2011

EPS-HEP, Grenoble: 21st July 2011 Backup slides EPS-HEP, Grenoble: 21st July 2011

Expected neutrino event rates in MIND sin22q13 nm CC ne CC nm + ne NC nm signal 4×10-2 2.5×105 7.0×105 3.1×105 1.2×104 5×10-5 7.2×105 3.2×105 2.2×102 Event rates 100 kton MIND at 4000 km (for 1021 m decays) Need 10-4 bkg suppression anti-numu CC nue CC anti-nu NC nu NC EPS-HEP, Grenoble: 21st July 2011

MIND: signal efficiency Difference in numu and anti-numu efficiencies: effectively only because of Bjorken y distribution (inelasticity) of neutrinos and antineutrinos nm-CC EPS-HEP, Grenoble: 21st July 2011

MIND: systematic errors Systematic errors: hadronic energy & angular resolution Systematic errors: ratio of QES/DIS, 1p/DIS, “Other”/DIS EPS-HEP, Grenoble: 21st July 2011

MIND: tau contamination Tau neutrino simulations using GENIE already implemented New results since IDR: nt signal right-sign nutau as numu anti-nutau as anti-numu New results since IDR: nt signal wrong-sign anti-nutau as numu nutau as anti-numu EPS-HEP, Grenoble: 21st July 2011

EPS-HEP, Grenoble: 21st July 2011 Roadmap EPS-HEP, Grenoble: 21st July 2011