For the Coosa North Georgia Region

Slides:



Advertisements
Similar presentations
US Army Corps of Engineers BUILDING STRONG ® State of Tennessee Regional Water Supply Planning Pilot Studies Benjamin L. Rohrbach, P.E. Chief, Hydrology.
Advertisements

US Army Corps of Engineers BUILDING STRONG ® State of Tennessee Regional Water Supply Planning Pilot Studies Benjamin L. Rohrbach, P.E. Chief, Hydrology.
LEE COUNTY UTILITIES DIVISION Integrated Water Resources Master Plan
Durham – Where Great Things Happen City of Durham Jordan Lake Allocation Request Presentation to the Jordan Lake Partnership March 21, 2014.
Metropolitan Council Environmental Services A Clean Water Agency Presented to the Environment Committee November 9, 2010 Information Item Master Water.
Eld Polk County Southeast Regional Wellfield. Polk County, Florida  Central Florida (Landlocked)  554 Lakes  Headwaters to Multiple Rivers (Low Volume)
© 2014 HDR, Inc., all rights reserved. Catawba-Wateree Water Management Group Water Supply Planning.
Colorado Springs’ ASR Program Presented by Cortney Brand Western Water Workshop, Gunnison, CO July 28, 2005.
Chehalis River Basin Flood District Formation February 17, 2010.
ESPA Comprehensive Aquifer Management Plan Presentation to the Governor’s Water Summit April 17, 2007 Idaho Water Resource Board Jonathan Bartsch and Diane.
Ross Valley Flood Protection and Watershed Program Flood Zone 9 Advisory Board April 16, 2015 Flow Reduction Study Preliminary Results 1.
Jordan Lake Partnership Western Intake Feasibility Study Jordan Lake Partnership Western Intake Feasibility Study 1.
Complex Network Analysis of the Washoe County Water Distribution System Presentation By: Eric Klukovich Date: 11/13/2014.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
Water System Planning Study
Interlocal Cooperation for a Sustainable and Secure Water Supply Don Greeley Regional Managers Meeting April 8 th, 2014.
Georgia Power Community & Economic Development. What is it? Most simply, it is the creation of wealth. Economic Development.
Northwest Power and Conservation Council 6 th Plan Conservation Resource Supply Curve Workshop on Data & Assumption Overview of Council Resource Analysis.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Regional Water Council Planning Update Dargan “Scott” Cole Hall Booth Smith & Slover, P.C. 191 Peachtree Street, Suite 2900 Atlanta, Georgia
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Withlacoochee Regional Water Supply Authority Water Supply Plan Update - Progress Report #3 May 15 – June 18.
Western Renewable Energy Zone Project October 29, 2009 John Savage Oregon Public Utility Commission.
Using the FRP to Enhance Georgia’s Leadership Program May 9, 2006 Stephanie Busch P 2 AD.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
Withlacoochee Regional Water Supply Authority Withlacoochee Master Regional Water Supply Planning and Implementation Program (WMRWSPIP) Technical Review.
Road Map to the Future: The Consolidation of Sewer Infrastructure in Rutherford County, NC November 16 th, 2015.
Is the Mid-Atlantic Region Water Rich? Presentation to 5 th Mid-Atlantic Regional Planning Roundtable November 7, 2008 Joseph Hoffman, Executive Director.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
EXPANSION OF BRUNSWICK COUNTY’S NORTHWEST WATER TREATMENT PLANT Public Utilities.
Metropolitan Council Water Supply Planning in the Northwest Metro Water Availability Technical Focus Group : June 9, 2008 Lanya Ross Senior Environmental.
1 Water Cooperative of Central Florida Utilities Department Orange County Board of County Commissioners July 26, 2011.
Draft Seventh Power Plan Meets RTF. Key Finding: Least Cost Resource Strategies Rely on Conservation and Demand Response to Meet Nearly All Forecast Growth.
Water Advisory Board March 29, Annual rainfall
1 EASTERN MUNICIPAL WATER DISTRICT Water Supply Strategic Plan Brian Jack Powell, P.E. Director of Planning June 17, 2015.
Prepared by: Alex Fisch Planning Services Division.
Nick Fish, Commissioner | Michael Stuhr, P.E., Director Portland Water Bureau May 3, 2016 Briefing for the Portland Utility Board Asset Management at the.
Richland Creek Water Supply Program Update and Design-Build Contract for 48” Raw Water Pipeline Paulding County, Georgia Board of Commissioners Workshop.
MWRA WATER SOURCE TOWN MEETING OCTOBER 05, :30 PM NR HIGH SCHOOL PERFORMING ART CENTER.
Metropolitan North Georgia Water Planning District DRAFT Water Resource Management Plan Review
Colorado Springs Utilities CH2M HILL Alumni Retreat
Pan-Canadian Wind Integration Study (PCWIS) Prepared by: GE Energy Consulting, Vaisala , EnerNex, Electranix, Knight Piésold Olga Kucherenko.
Lecture (11): Water Distribution Systems
Richland Creek Water Supply Program Briefing
Mn Association of County Planning and Zoning Administrators
FUEL CELLS.
Economic Joint Venture model: summary of progress
North Texas Municipal Water District “Regional Service Through Unity … Meeting Our Region’s Needs Today and Tomorrow” Water Supplies Vital for the Future.
Rob Conley City of Hamilton
THE PLAN The Goal Focus on: Entire system Level of service (LOS)
Protecting the Quality of our Water
Cross-border Infrastructure Projects
Hydrogen Vehicle Readiness on the Central Coast
CITY OF MARSHALL CHLORIDE ISSUES September 26, 2017
Redundancy and Emergency Interconnectivity (REI) Plan
STATEWIDE DROUGHT RESPONSE: IMPACT TO SOUTH ORANGE COUNTY
Sacramento County Stormwater Quality Program
Mulberry Watershed Management Plan
Georgia Agricultural Metering Program
Department of Environmental Quality Division of Water Resources
Southern Bridge Project Brown County Executive
Future Water Supply Evaluation
Investing in Source Water Protection
City of Sunrise Wastewater Reuse Program
Status after Second Year of Work Implementing the Recommendations of the Santa Cruz Water Supply Advisory Committee Joint Meeting Santa Cruz City Council.
The Wausau Wastewater Treatment Facility
Sacramento County Stormwater Quality Program
Antelope Valley-East Kern Water Agency
Indiana Finance Authority (IFA)
Presentation transcript:

For the Coosa North Georgia Region Redundancy and Emergency Interconnectivity Study Water Transmission Grid Study For the Coosa North Georgia Region April 22, 2015 Presented by: Michelle Vincent, Jacobs and Tanya Kinnard, Amec Foster Wheeler

Introduction Background Redundancy and Emergency Interconnectivity Study Service Areas Existing interconnections Emergency scenarios and reliability targets for focus area Additional interconnection projects and costs Next steps and recommendations Water Transmission Grid Study Methods and priorities Conceptual grid development Potential sources Recommendations and costs Future Activities

Background Studies were commissioned by the Coosa North Georgia Regional Water Planning Council (“Council”) to support Regional Water Plan implementation efforts The Council: Established by Georgia's State Water Plan in 2008 Sets direction, goals, and policy for water planning in the region Works closely with Georgia Environmental Protection Division to produce Regional Water Plans and support implementation Meets semi-annually to quarterly The North Georgia Water Partnership (“Partnership”) serves as the technical advisory body for the Council, in addition to implementing goals for water planning and service for the region. The Partnership: Formed in 2003 Provides proactive regional water-based planning, technical assistance and education Meets monthly and assists with implementation process

Background Coosa North Georgia Water Planning Region River basins: Tennessee, Coosa, Chattahoochee, Savannah

Redundancy and Emergency Interconnectivity Major tasks of Study: Data collection Determine Service Areas - entire region Analyze and map existing interconnections – focus area Evaluate emergency scenarios and reliability targets for focus area Propose additional interconnection projects Next steps and recommendations

Redundancy and Emergency Interconnectivity Determined and mapped service areas for region Public Water Service Areas

Redundancy and Emergency Interconnectivity Modeled after study commissioned by GEFA for the Metro Atlanta area Goal is to eventually cover entire Coosa Region and incorporate appropriate findings and targets into Regional Plan Initial Focus Areas Chatsworth Dalton Rome (Floyd County) Calhoun Focus area prioritized due to: High levels of existing interconnections, Known availability of GIS data Centralized location.

Redundancy and Emergency Interconnectivity Data collection Analysed and mapped existing interconnections Focus Areas already interconnected Collected data, pipes, water mains, water treatment plan capacities, permit limits, water availability. Demand – current (2010) and 2050 – from Regional Water Plan Red dots are existing; orange are proposed.

Redundancy and Emergency Interconnectivity Meeting existing and future demand Compared existing and future (2050) demand of Annual Average Day demand with water availability Calhoun’s current supplies would not meet 2050 demand Focus Area results: System Annual Average Day – 2010 Demand Annual Average Day – 2050 Demand Chatsworth  Dalton Rome Calhoun X For purposes of interconnection plan, we assume that Calhoun will expand or build new water treatment facility to meet demand.

Redundancy and Emergency Interconnectivity Reliability Targets and Emergency Scenarios Emergency Scenarios: Failure of largest treatment facility within a Partnership member’s system Short-term catastrophic failure of distribution system Short-term contamination of a water supply system Short-term contamination of a raw water source Reliability Targets 100% Annual Average Day Demand 65% Annual Average Day Demand 35% Annual Average Day Demand

Redundancy and Emergency Interconnectivity Reliability Targets and Emergency Scenarios Maximum Deficit, for evaluated emergency planning scenarios: System 65% of Immediate Demand 35 % of Immediate Demand 65% of 2050 Demand 35% of 2050 Demand Chatsworth  Dalton 2.0 MGD Rome 2.5 MGD Calhoun Dalton and Rome: Failure of largest water treatment facility or short-term failure of water distribution system.

Redundancy and Emergency Interconnectivity Proposed additional interconnection projects Red dots are existing; orange are proposed.

Redundancy and Emergency Interconnectivity Range of cost ~$10,000 to $230,000 based on length Proposed projects and estimated costs

Redundancy and Emergency Interconnectivity Next steps and Future Activities: Phase 1 (current Project): Rome/Floyd, Chatsworth, Dalton, Calhoun [Completed] Phase 2: Dade, Walker, Catoosa, Chattooga, Polk, (Tennessee) (2016) Phase 3: Gilmer, Murray, Pickens, Dawson, (Big Canoe), (Tennessee),(connections with Cherokee Co and Metro Influence) (2017) Phase 4: Fannin, Union, Lumpkin, (Tennessee) (2018) Phase 5: Towns, White, Habersham (2019) Phase 6: Compile entire region (2020) Each phase take about 6-9 months, but could be delayed due to budget concerns. Coucld also accelerate timeframe by combining phases.

Water Transmission Grid Study

Water Transmission Grid Methods and priorities Worked with Partnership to determine potential water supply sources Collected regional data Evaluated raw vs. finished water open and/or natural channels vs closed (pipes) channels Proposed Beyond 2050 Conceptual Grid system Long term planning approach hybrid system – majority finished water. Features (5) “service” zones

Grid Concept Development Envisioned as one continuous raw or finished pipeline available for anyone to tap Refined to (4) service zones in GA and (1) service zone in TN Reality of these endeavors is beyond 2050 as water supply projected needs are minimal through 2050 for the region Planning for 3rd generation

Conceptual Water Transmission Grid (Zone 1) - North Blue Ridge (Zone 2) -Shoal Creek-Upper Chattahoochee (Zone 3) - Carters Lake-Coosawattee (Zone 4) - Tennessee Finished Water (Zone 5) - West Georgia Interconnect

Conceptual Water Transmission Grid

Potential Water Supply Sources Tennessee Water Systems Interconnections already exist (Tennessee American Water and Eastside Utility) Several GA municipalities and communities currently purchase water from TN Use of finished water avoids controversy

Potential Water Supply Sources Rome/Dalton/Calhoun Surplus water available now and near future As part of Redundancy and Emergency Interconnectivity Study this focus area is identified as an example for the region and possible the state Highly interconnected already

Potential Water Supply Sources Regal Springs A well and surface water spring system Benefits include requiring minimal treatment and conveniently located to west side of region

Potential Water Supply Sources Lake Blue Ridge Blue Ridge was chosen over Nottley or Chattuge due to proximity to future water needs Conceptual grid envisions future connection to other lakes in the area

Potential Water Supply Sources Proposed Reservoir on Dry Creek Identified in “Preliminary Water Supply Study Technical Memorandum” by Partnership in 2008 Projected yield ~ 12.2 MGD Located between Catoosa and Whitfield counties One of highest rated potential reservoirs

Potential Water Supply Sources Shoal Creek Reservoir Potential yield 100 MGD Proximity to southern and eastern Coosa region Eliminates moving water through difficult terrain

Recommendations and Costs Closed pipelines to transport water Break region into interconnected zones Move water through path of least resistance Costs for these types of project pipeline scenarios range from $17M to $58M per zone or on average at $11M per pipeline length Similar projects around the world range from $100s of millions to $1 billion

Operation of Grid Grid Operation Proposed “Chain Memorandum of Understanding” (MOU) Allows existing agreement to remain and additional agreements to be added later Agreements clarify how water will be transported throughout a zone

Water Transmission Grid Future Activities: Incorporate additional interconnection areas Collect additional data: utilities corridors. Identify future regional water supply projects Establish regional goals Target emergency redundancy rates 35% and 65%? Local and regional systems work to achieve goals.

Comments, Questions and Discussion Michelle Vincent, Jacobs and Tanya Kinnard, Amec Foster Wheeler