NH MS4 Stormwater Permit -- Guidance for NHDES related provisions

Slides:



Advertisements
Similar presentations
What are TMDLs? and What Might They Mean to MS4 Permittees?
Advertisements

1 Stormwater Program Videoconference April 23, 2013 Bill Cole, Water Quality Standards Unit.
Public Workshop Implementation and Enforcement of Nutrient TMDLs for Lake Elsinore and Canyon Lake CA Regional Water Quality Control Board (Regional Water.
Bureau of Water Overview Wastewater issues Drinking water issues Wrap up topics.
Nebraska Department of Environmental Quality TMDLs 101 An Explanation of the Federal Clean Water Act’s TMDL Requirements and How they Impact Carter Lake.
James Beckley. Virginia and DEQ Virginia has > 52,255 miles of rivers and streams 116,364 acres of significant lakes and reservoirs 2,684 square miles.
Nelly Smith EPA Region 6. - Develop or revise bacteria reduction program for consistency with new TMDL requirements and allocations - Develop or revise.
Slide 1 EPA Stormwater & Water Regulations: Local Impacts & Balancing Power 2011 Congressional City Conference.
Bureau of Water Program Overview Local Government Interest.
Current Planning for 2017 Mid-Point Assessment Gary Shenk COG 10/4/2012 presentation credit to Katherine Antos and the WQGIT ad hoc planning team.
Montana’s 2007 Nonpoint Source Management Plan Robert Ray MT Dept Environmental Quality.
April 22, 2005Chester Creek Watershed TMDL Total Maximum Daily Load Chester Creek University Lake & Westchester Lagoon Alaska Department of Environmental.
Alabama’s Water Quality Assessment and Listing Methodology ADEM QA Workshop February 13, 2006.
Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator
Item No. 13 Recommendation to the State Water Resources Control Board Regarding the Section 303(d) List Lahontan Water Board June 19, 2014 Carly Nilson.
Department of the Environment Overview of Water Quality Data Used by MDE and Water Quality Parameters Timothy Fox MDE, Science Service Administration Wednesday.
NYS Department of Environmental Conservation DRAFT SPDES General Permit for Stormwater Discharges from Separate Storm Sewer Systems (MS4s) (GP )
Total Maximum Daily Loads in MS4 Storm Water Programs.
MS4/sMS4 Annual Report Development Thea Lomax Presenter Storm Water Enforcement Thea Lomax Presenter Storm Water Enforcement Prepared 07/04/2011.
VIRGINIA’S TMDL PROCESS.
Water Quality Planning Division Monitoring & Assessment Section Surface Water Quality Monitoring Program (SWQM)
Water Quality Reduction Trading Program Draft Rule Language Policy Forum January 29,
1 Sandra Spence EPA Region 8 TMDL Program EPA Region 8 TMDL Program Integrating Watershed Plans and TMDLs to Help Answer Watershed Planning Questions November.
1 IDEM Overview of March 14, 2008 Draft Antidegradation Rule Presented at the April 29, 2008 Antidegradation Stakeholder Meeting.
MS4 Permitting Process William Creal Water Bureau Permits Section Chief.
MS4 Remand Rule Intergovernmental Associations Briefing September 15, 2015.
Update on Wyoming Draft 303(d) List and Changes to Watershed Planning.
SMALL CONSTRUCTION STORMWATER PERMITTING. STORMWATER GENERAL PERMIT FOR SMALL CONSTRUCTION ACTIVITIES Construction activities regulated under this permit.
Presentation to the Chesapeake Bay and Water Resources Policy Committee July 30, 2010.
Welcome Revisions of Chapter WAC Sections -035 and -036 Rule advisory committee workshop #5 Lacey, WA October 28, 2009.
Restoring VA Waters the TMDL Way Jeff Corbin Senior Advisor to the Regional Administrator U.S. EPA Region 3.
Preparing for Regulatory Change WATER RESOURCES WORKSHOP February 20, 2004 Donald J. Brady, Ph.D.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
Deliberative, Pre-decisional – Do Not Quote, Cite or Distribute 1 Chesapeake Bay Water Quality Trading.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
Phase II National Storm Water Regulations What’s in it for you?
Region 2000 Local Government Council 828 Main Street, 12th Floor Lynchburg, VA March 4, :30 – 8:30 p.m.
MS4 APPLICATION PROCESS Mark Fife Water Bureau Water Bureau Permits Section Permits Section.
Solid Waste Management Plans Update Webinar Training March 5, 2014.
Overview of the Total Maximum Daily Load Program.
STREAM MONITORING CASE STUDY. Agenda  Monitoring Requirements  TMDL Requirements  OCEA Initial Monitoring Program  Selection of Parameters  Data.
Water Resources Workshop Standards, Use Attainability, Impairments and TMDLS Richard Eskin Maryland Department of the Environment February 20, 2004.
REVISIONS TO THE FEDERAL WATER QUALITY STANDARDS RULE JILL CSEKITZ, TECHNICAL SPECIALIST TEXAS COMMISSION ON ENVIRONMENTAL QUALITY.
Storm Water Permit Program Authority to regulate storm water discharges derives from 40 CFR Illinois EPA is delegated authority to administer this.
Northern Virginia Regional Commission MS4 Workgroup March 17, 2011.
Texas Surface Water Quality Standards Update Joe Martin Water Quality Standards Work Leader Joe Martin Water Quality Standards Work Leader.
MS4 and Trading Considerations
LTCPs and Water Quality Standards
Municipal Separate Storm Sewer System (MS4) Permit
Stormwater Management and MS4 Compliance
GREAT BAY and NEW HAMPSHIRE WATER QUALITY STANDARDS
Environmental Rule 327 IAC 15-5 to a General Permit
Water Quality Planning Division Monitoring & Assessment Section
Drww general membership meeting
Tim Cawthon TCEQ Nonpoint Source Program
Unresolved Reg 2 Issues and Triennial Review Preview Raymond E
The Total Maximum Daily Load (TMDL) Program in Illinois
2018 Stormwater Construction General Permit (CGP) Renewal TXR150000
Neponset Valley Stormwater Collaborative Steering Committee Meeting
John Tinger U.S. EPA Region IX
Presentation to Maryland’s Trading Advisory Committee March 21, 2016
So I have a TMDL Wasteload Allocation
Rule 5 and 13 Conversion Impacts
High Rock Lake TMDL Development
Jon Capacasa, Director Water Protection Division U.S. EPA Region III
Presentation to Maryland’s Trading Advisory Committee March 21, 2016
Water Quality Planning Division Monitoring & Assessment Section
Water Quality Planning Division Monitoring & Assessment Section
EPA’S ROLE IN APPROVING BASIN PLAN AMENDMENTS
Rule 5/6/13 Conversion to General Permits
Presentation transcript:

NH MS4 Stormwater Permit -- Guidance for NHDES related provisions NH Lakes Management Advisory Committee Ted Diers NH Department of Environmental Services

TMDLs and Impaired Waters More monitoring More planning Specific actions Best Management Practices

67%

46%

Focus and prioritize Where most bang for the buck Where town has most responsibility Where other benefits will occur Where partners exist Where the problem and solution is clear We may have data that can help!

NHDES Guidance Antidegradation Provisions Off-ramps for Delistings Sections 2.1.2; 5.1.4; and 6.4 Off-ramps for Delistings Appendix H Monitoring Requirements Appendix G Alternative Pollutant Reduction Plans Section 1.7.2

Antidegradation Provisions 2.1.2 Increased Discharges (p. 18) a. Any increased discharge (including increased pollutant loadings) through the MS4 to waters of the United States is subject to New Hampshire antidegradation regulations. The permittee shall comply with the provisions of N.H. Code Admin. R. Part Env-Wq 1708.04 and 1708.06 including information submittal requirements and obtaining authorization for increased discharges where appropriate. Any authorization of an increased discharge by NH DES shall be incorporated into the permittee's SWMP. If an applicable NH DES approval specifies additional conditions or requirements, then those requirements are incorporated into this permit by reference. The permittee must comply with all such requirements.

Draft Guidance Comply with AoT and other permits Avoid increased stormwater runoff and its accompanying pollutants Less than one acre = de minimis Contact NHDES if increasing runoff, not compliance with AoT provisions, likely to impact an impaired water body. Antidegradation analysis (try to avoid)

Off-ramp for Delistings Appendix H (The permit includes the same language for nitrogen, phosphorus, bacteria, chlorides, metals, and solids, oils and greases) 2. At any time during the permit term the permittee may be relieved of additional requirements in Appendix H part I.1. applicable to it when in compliance with this part. a. The permittee is relieved of its additional requirements as of the date when one of the following criteria are met: i. The receiving water and all downstream segments are determined to no longer be impaired due to nitrogen by NH DES and EPA concurs with such determination. ii. An EPA approved TMDL for the receiving water or downstream receiving water indicates that no additional stormwater controls for the control of nitrogen are necessary for the permittee’s discharge based on wasteload allocations as part of the approved TMDL.

How to get off the list Table of Contents Introduction Assessment Cycle Impairments - 303(d) vs 305(b) The CALM Sampling Data QA/QC QAPP SOPs Submitting your data QA/QC Reporting Understand the Original Listing What is Impaired? Past Water Quality Data Get the Data Used in the Original Assessment Has anything changed?

How to get off the list? Even stronger when have actions that reduced the pollutants!

Monitoring Requirements Appendix G -- New Hampshire Small MS4 Permit Monitoring Requirements For Discharges into Impaired Waters Parameter Benthic-Macroinvertebrate Bioassessments (Streams) Fishes Bioassessments (Streams) Foam/Flocs/Scum/Oil Slicks Habitat Assessment (Streams) Physical substrate habitat alterations

Alternative Pollutant Reduction Plans 1.7.2 Notice of Intent b. Operators of Small MS4s that have developed Alternative Pollutant Reduction Plan(s) to meet TMDL Waste Load Allocations in accordance with Appendix F Part I.2, II.2, and/or III.2 shall attach their proposed NHDES-approved Alternative Pollutant Reduction Plan(s) to their NOI. Appendix F (Example for Bacteria/Pathogens) 2. The MS4 operator shall work with NHDES to develop an Alternative Bacteria/Pathogens Reduction Plan consistent with the applicable TMDL. The MS4 operator shall submit a NHDES-approved Alternative Bacteria/Pathogens Reduction Plan that is consistent with the TMDL Implementation Plan and includes schedules and milestones to meet applicable Waste Load Allocations, with their Notice of Intent (NOI) as an alternative to the requirements described in Appendix F Part II.1. above. a. The Alternative Bacteria/Pathogens Reduction Plan shall be subject to EPA review and the public comment period consistent with the NOI procedures at Part 1.7.4.b. of the permit. b. The permittee shall keep the written plan (hardcopy or electronic) as part of their SWMP.

Watershed Based Plans – “a-i” Source identification. Estimate needed load Describe management measures Implementation schedule Interim, measurable milestones Criteria of success Account for new development. Monitoring component

Questions? NH Department of Environmental Services Baboosic Lake –Baboosic Lake Association NH Department of Environmental Services Ted Diers, 271-3289 Ted.Diers@des.nh.gov Barbara McMillan, 271-7889 barbara.mcmillan@des.nh.gov