Having Fun with Gantt Version 1.2 (Dec 2017) Mark Kelly Vceit.com.

Slides:



Advertisements
Similar presentations
Gantt PERT Having Fun with & Modified from lecture notes of Mark Kelly
Advertisements

Work Breakdown Structures
Mark Kelly McKinnon Secondary College Gantt PERT Having Fun with &
Having Fun with Gantt PERT &.
Scheduling The Project  Scheduling Planning, budgeting and scheduling are all part of the same process Planning a project, developing a budget for it,
Chapter 10: Project Schedule Planning
CS3500 Software Engineering Project Management (1) In 1986 one well-known software engineer (Tom DeMarco) made the simple but important observation: “You.
Eleanor Roosevelt High School
Microsoft Project.
Projmgmt-1/18 DePaul University Evaluating Schedule In MicroSoft Project Instructor: David A. Lash.
Project Management Techniques.
Microsoft Project Presentation By Corey Johnson 10/11/00.
BAR CHART Paweł Bilski Piotr Mazur Paulina Wawryca.
This work is licensed under a Creative Commons Attribution 3.0 Unported LicenseCreative Commons Attribution 3.0 Unported License (CC-BY). Project Management.
Prepared by: Michael Palazzo
Workshop-3 Gantt and Pert Chart.
Copyright © Software Process Group 1 Software Process Group Microsoft Project Tutorial Steve Meyers
Planning & Scheduling Your Projects 1. Planning Elements Work Breakdown Structure (WBS) ◦Identifying the tasks and organizing them Scheduling the WBS.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
ERT461 BIOSYSTEMS ENGINEERING DESIGN 1 ERT424 BIOPROCESS PLANT DESIGN 1.
HIT241 - TIME MANAGEMENT Introduction
Project Management An overview. What is a Project A temporary job to accomplish a specific task A temporary job to accomplish a specific task Attributes.
Chapter 3 : Managing the Information Systems Project.
Abeer Bin Humaid. Project management is “the application of knowledge, skills, tools, and techniques to project activities in order to meet project requirements”
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Mark Kelly McKinnon Secondary College Gantt PERT Having Fun with &
Project Scheduling: PERT/CPM
IT Theory Slideshows ITA, SD, IT11 By Mark Kelly Vceit.com Project Management Overview.
Year 11 Info Tech Project Management Overview. Project management overview identifying tasks, resources, people and time scheduling tasks, resources,
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
MS project Abeer Bin Humaid. What is project management? Project management is “the application of knowledge, skills, tools, and techniques to project.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
Objectives 4 Understand the basic concepts of project planning and control 4 Explain PERT and Timeline (Gantt) charts.
1 Rev: 5/05/07 MSE-415: B. Hawrylo Chapter 16 Managing Projects MSE-415: Product Design Lecture #3.
PROJECT MANAGEMENT Approaches By- Rahul Jain. Plan your work first…..then work your plan.
Project Management Software Application PRM 705 Lecture 5 Mian Wasim Irshad.
Mark Kelly Vceit.com Gantt Having Fun with. 2 Well, “fun” might be optimistic At least they’re more fun than this…
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Path and MS Project 2003 Tuesday, February.
DECISION MODELING WITH MICROSOFT EXCEL Chapter 14 Copyright 2001 Prentice Hall Publishers and Ardith E. Baker Part 3 andand PERT CPM.
Project Time Management
PERT Gantt WBS.
Managing the Information Systems Project Cont’d
Project Management Business Management.
Project Management – PTM721S
Business System Development
Project Planning & Scheduling
Eleanor Roosevelt High School
Creating team solutions
Project Planning & Scheduling
Project Planning and Scheduling
2nd Task of Your Project „All you have to decide, is what to do with the time that is given to you.“ J.R.R. Tollkin Prof. Dr. Christian Bleis 1 Interaktionskompetenz.
Project scheduling Chapter 10 Copyright ©2016 Pearson Education, Inc.
2.2 | Use Planning Tools.
Chapter 6: Project Time Management
Chapter 6: Project Time Management
Project Time Management
ENGINEERING MANAGEMENT (GE 404)
Guide to Project.
PROJECT MANAGEMENT Bill Biddle.
Project Scheduling Basics Activity on Node Precedence Diagrams
Prepared by Lee Revere and John Large
Project management Lecture 9
Tools for Visualization
Critical Path Method Farrokh Alemi, Ph.D.
Introduction to Project Management ECE 480 Erik Goodman.
ENGINEERING MANAGEMENT (GE 404)
Project Planning By Phaik San Liew.
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
Importance of Project Schedules
Project Timeline using Microsoft Project
Presentation transcript:

Having Fun with Gantt Version 1.2 (Dec 2017) Mark Kelly Vceit.com

Well, “fun” might be optimistic At least they’re more fun than this…

What is Gantt? Gantt charts : are timelines manage the tasks involved in big and complex projects let project managers organise time, people, equipment and money ensure the right people and equipment are in the right place and the right time

What is Gantt? Gantt charts : allow managers to monitor the progress of a project are adjusted to reflect actual project progress

Henry Laurence Gantt (1861-1919) Gantt Charts Gantt Charts Henry Laurence Gantt (1861-1919)

Gantt Charts Gantt Charts Henry Laurence Gantt (1861-1919) And please spell my name right. It’s Gantt. Not ‘Gannt’. Not GANTT.

Gantt Charts Gantt Charts Henry Laurence Gantt (1861-1919) Thanks. And did you know that Gantt charts are a huge hit at parties?

How much do you need to know? The study design requires you to have a basic understanding of project management concepts. You need to be able to create and modify a simple Gantt chart with software. You do not have to know anything about PERT charts (another common project management tool)

Gantt Basics Basically, a timeline with tasks that can be connected to each other

Making a Gantt chart Step 1 – list all of the tasks in the project

Making a Gantt chart Step 2 – add task durations.

Making a Gantt chart Skill and industry-experience guide the choice of task durations. But real-world events usually mess with predicted durations…

Making a Gantt chart Charts must be adjusted to reflect real-world progress. Your SAC must contain evidence of such adjustments.

Making a Gantt chart Using the right software makes chart adjustments easy. More on software choices later…

Making a Gantt chart Step 3 – add dependencies (which tasks cannot start before another task finishes)

Dependencies The arrows indicate dependencies. Task 1 is a predecessor of task 2 – i.e. task 2 cannot start before task 1 ends. Task 3 is dependent on task 2. Task 7 is dependent on two other tasks Electrics, plumbing and landscaping are concurrent tasks and can happen at the same time, so they overlap on the chart. All 3 can start after task 4 ends. Painting must wait for both electrics and plumbing to be finished. Task 9 has zero duration, and is a milestone

Scope in 2016-2019 You need to know the terms dependency and milestone. The term predecessor is handy to know, but probably won’t appear on the exam. The concept or term critical path will never be examined. Understanding the concept of slack time is recommended, even if the term will not appear on exams…

Scope in 2016-2019 “The concept or term critical path will never be examined.” Heh. Unless VCAA decides (as they did on the 2017 SD exam) that a term like “critical path” can be examined even if it is not mentioned in any key knowledge. Feel free to write to VCAA and tell them what you think of this. The moral – learn more than the very basics. Just in case.

Slack is the amount of time a task can run overtime before it affects other tasks. Task 6 can take an extra day and a half before it affects the project’s end date, so each has 1.5 day’s slack. If a task runs overtime and it has no slack, the start dates of following tasks will be affected.

The diamond shape indicates a milestone. Used to monitor whether a project is on schedule or not. E.g. “The enter project must be finished by 9 September.” A milestone is an event, not a task – a point of major progress in the project.

Milestones Milestones are events, not tasks – they happen, but no time or work is required to accomplish them. They are points of major progress in the project. They usually refer to the start or end of major tasks or groups of tasks. The end-date is the major milestone of any project. Milestones are created as tasks with zero duration and no resources (e.g. staffing).

Real Exam Questions Informatics 2016 – A11 For the Gantt chart shown above, a delay in the completion of Task D by one day will a. have no effect on Task E. b. delay only Task E by one day. c. delay only Task F by one day. d. delay both tasks E and F by one day.

Real Exam Questions Informatics 2016 – A11 For the Gantt chart shown above, a delay in the completion of Task D by one day will a. have no effect on Task E. b. delay only Task E by one day. c. delay only Task F by one day. d. delay both tasks E and F by one day. Answer is A. Why?

2003 Exam Multichoice Q16 Is Task D is a predecessor for : (A) Tasks E & F? (B) Tasks B & C? (C) Tasks C & F? (D) Tasks B & E?

2003 Exam Multichoice Q16 No dependency arrows – be prepared for this in exam questions. Assume that any task that does not start on day 1 must be dependent on some other task. Which tasks are dependent on task D? Find the tasks that start as soon as task D has finished… E and F. So the answer is [A].

Gantt tools Study design says that Gantt charts (‘project plans’) must be created with software. Not hand-drawn!

Gantt tools Excel is possible but NOT recommended. Dependency arrows are nearly impossible. Updating charts is a major pain because tasks are not logically connected. Changing one task means manually adjusting several others.  Yuk!

GanttProject (free) at ganttproject.biz A nice, simple tool. Lacks a few fancy features (e.g. allowing different working hours for different tasks) but will suit all Informatics needs. The textbook uses GanttProject for its examples.

Microsoft Project. Big, fully-featured, $$$

Online Gantt creators Dozens of sites exist, e.g. Ganttpro.com, smartsheet.com Many are free. Problem: charts are not portable, and must be saved and edited on the site. Need internet access.  smartsheet.com

Because you’ve been good

Thanks Mark Kelly – mark@vceit.com VCE IT Lecture Notes vceit.com