Project Control: Control of Work and Cost Versus Time Part #4 May 29, 2014 Hide/Unhide Exercises?

Slides:



Advertisements
Similar presentations
Solving Systems by Elimination
Advertisements

© McGraw-Hill/Irwin 2004 Information Systems Project ManagementDavid Olson 11-1.
5.7 Graph Linear Inequalities in Two Variables
Solving Systems of Equations by Substitution Objectives: Solve Systems of Equations using substitution. Solve Real World problems involving systems of.
Managing Risk CHAPTER SEVEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Project Management Concepts
Status Report Presentation. Is this initiative ahead of schedule (why – explain)? Is this initiative on schedule (why – explain)? Is this initiative.
Simultaneous Equations
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
1 1  1 =.
Teacher Name Class / Subject Date A:B: Write an answer here #1 Write your question Here C:D: Write an answer here.
Leicestershire Numeracy Team 2003
L.O.1 To be able to derive quickly division facts corresponding to tables up to 10x10.
The 5S numbers game..
Connoizor Enabling Performance for Businesses through Software Website: Contact:
Project Control: Developing the As-Planned S-Curves
Order of Operations Lesson
The basics for simulations
Cost as a Business Driver 1 John Brown C Eng MIEE mr_ Software Cost Estimation.
Chapter 4 Systems of Linear Equations; Matrices
Math for Liberal Studies. There is a list of numbers called weights These numbers represent objects that need to be packed into bins with a particular.
Developing the Schedule
Management Information Systems [MOIS470]
Finding the Critical Path
5.9 + = 10 a)3.6 b)4.1 c)5.3 Question 1: Good Answer!! Well Done!! = 10 Question 1:
©2003 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
Finding Equations of Exponential Function
Solve by Substitution: Isolate one variable in an equation
Lob: I can use pencil and paper methods to divide TU by U and HTU by U.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
UNIT 2: SOLVING EQUATIONS AND INEQUALITIES SOLVE EACH OF THE FOLLOWING EQUATIONS FOR y. # x + 5 y = x 5 y = 2 x y = 2 x y.
Before Between After.
©Evergreen Public Schools What is a Function Teacher Notes Notes: Today students will create their understanding of a function: “In a function each.
Solve equations with variables on each side.
CHAPTER 10 The Cost of Capital
12 Financial Management 12-1 Financial Planning
Solving Addition and Subtraction Inequalities
1 Phase III: Planning Action Developing Improvement Plans.
Use the substitution method
One step equations Add Subtract Multiply Divide Addition X + 5 = -9 X = X = X = X = X = 2.
1 Dr. Scott Schaefer Least Squares Curves, Rational Representations, Splines and Continuity.
MIS (Management Information System)
úkol = A 77 B 72 C 67 D = A 77 B 72 C 67 D 79.
Monitoring and Control Earned Value Management (EVM)
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
Project Control: Developing the As-Built S-Curves Part #3 June 26, 2002 Hide/Unhide Exercises.
EARNED VALUE MANAGEMENT SYSTEM A Project Performance Tool
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
What financial condition is your Agricultural Society in? “Understanding your financial performance” Presented to the Alberta Association of Agricultural.
Project Time Con trol. Control = Monitor + Compare + Analysis + Action  Definition: Controlling  Controlling involves making sure that the results achieved.
10/19/ :26 AM 1 Project Cost Control. 10/19/ :26 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
Module 11 Session 11.1 Visual 1 Module 11 Executing and Controlling the Work Session 11.1 Managing Execution: Executing and Controlling the Work.
Project Cost Management
11/9/2015 9:42 AM 1 Project Time Control. 11/9/2015 9:42 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
4/21/2003CVEN Maxwell 1 Project Control: Control of Work and Cost Versus Time Part November 19, 2015.
The Project Development Process: Setting the Context for Project Control Part #1 November 28, 2015.
Project Management 6e..
Evaluating EVM January 13, EVM Issues and Opportunities ▪ EVM Basics ▪ EVM Issues ▪ EVM ETC and EAC Calculations ▪ EVM Cost and Schedule Value Calculations.
Report Performance Monitor & Control Risk Administer Procurement MONITORING & CONTROLLING PROCESS.
Project Control: Work and Cost Versus Schedule Module: April 22, 2003.
Managing with Imperfect Information 1 6/14/2016. Perfect Information 2 1 – Source is WikipediaWikipedia Perfect information refers to the situation in.
Agenda ‒ Cost Management ‒ Cost Budgeting ‒ Cost Control Learning Goals 1.Cost Control 2.Earned Value Management.
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Project Controls: As-Built S-Curves
TOPIC-8A- PROJECT TIME CONTROL
MGT 605: CH-13 Progress and Performance Measurement and Evaluation
ENGINEERING MANAGEMENT (GE 404)
Presentation transcript:

Project Control: Control of Work and Cost Versus Time Part #4 May 29, 2014 Hide/Unhide Exercises?

Purpose Describe how to use the combined sets of S- Curves to: Control Cost (Budget) versus Schedule. Control Progress (Quantity and Quality of Work) versus Schedule. Use the combined curves to control Cost versus Work versus Schedule. Describe possible counter-measures for the four possible general situations.

Learning Objectives Given a set of S-Curves be able to determine: Cost Variance – over or under cost based solely upon Schedule Schedule Variance – behind or ahead of schedule based upon planned and actual work. Budget Variance – over or under budget based upon Schedule Variance

Combine As-Planned and As-Built At the end of day 8 we are 7% (55-47) over budget and 7% ahead of schedule based upon elapsed time.

Combining the As-Built with the As-Planned. Actual Planned Note the relative positions of the curves.

Cost Variance Independent of Work Accomplished at Day 8. 55%-47% 7% Over Cost Making cost assumptions, independent of actual work may lead to misjudgments of actual job status.

Schedule Variance based on Work Accomplished at Day 8. This implies the project is 1 day ahead of schedule. This is because, work has been completed earlier than planned. Actual (1) Planned (2)

Budget Variance as a function of Schedule Variance at Day 8. This implies that the project is on budget and 1-day ahead of schedule. This is the budgeted cost of the actual work is equal to the cost incurred to date. Planned Actual (3)(4) (2)

Class Exercise 4.1: Individuals, plot and interpret the S- Curves from the data. Pairs, compare answers. Teams, be prepared to discuss possible counter-measures.

The 4 Possible Cases. 1. Most likely Over Budget Behind Schedule 2. Common Over Budget Ahead of Schedule 3.Common Under Budget Behind Schedule 4. Least Likely Under Budget Ahead of Schedule

Case 1: Over Budget, Behind Schedule Use these data to solve for Schedule and Cost Variance.

Case 1: Behind and Over

Answer to Case 1: Cost Variance based upon schedule is 10% over budget. Schedule Variance based upon progress to date is (12 – 10.4 = 1.6 days) 10% behind schedule. Budget Variance based upon progress to date is (92% - 66%) 26% over budget, Since 70% of the schedule has elapsed at this point, you are in BIG trouble.

Case 2: Over Budget, Ahead of Schedule Use these data to solve for Schedule and Cost Variance.

Case 2: Ahead and Over

Answer to Case 2: Cost Variance based upon schedule is 5% over budget. Schedule Variance based upon progress to date is (14 – 12) 2 days ahead of schedule at day 12. Budget Variance based upon progress to date is (98% - 88%) 10% under budget, Since 70% of the schedule has elapsed at this point, maintain momentum to finish early and close to budget.

Case 3: Under Budget, Behind Schedule Use these data to solve for Schedule and Cost Variance.

Case 3: Behind and Under

Answer to Case 3: Budget Variance based upon schedule is 2% under budget. Schedule Variance based upon progress to date is (11 – 12) 1 days behind of schedule at day 12. Budget Variance based upon progress to date is (78% - 72%) 6% over budget, Since 70% of the schedule has elapsed at this point, increase momentum to finish on time and over budget OR … …

Case 4: Under Budget, Ahead of Schedule Use these data to solve for Schedule and Cost Variance.

Case 4: Ahead and Under

Case 4: Answer Budget Variance based upon schedule is 15% under budget. Schedule Variance based upon progress to date is (12 – 14) 2 days ahead of schedule at day 12. Budget Variance based upon progress to date is (68% - 98%) 30% under budget, Since 70% of the schedule has elapsed at this point, maintain momentum to finish early and 30% under budget.

Important Points to remember Cost Variances based solely on schedule may yield misleading results. Schedule Variances may be difficult to determine because actual progress to date may be difficult to measure. Budget Variances based upon progress to date and schedule variances yield the best result.

Some Control Issues Coming out of the start-up phase, it is essential to achieve max productivity as quickly as possible. Otherwise, unrecoverable time may be lost. Therefore it is important to have an early check point to confirm early productivity.

Some Control Issues, contd. It is essential to establish an accurate check point before the 50% cost to complete point is reached. This will yield an estimate of status at completion, if trends continue. This becomes input to a successful completion strategy. It may be required in the Terms and Conditions of the contract.

Some Control Issues, contd. There is no substitute of constant monitoring. For keeping progress on track and hitting payment milestones. Designing counter-measures for unforeseen delays and cost estimation errors. Provide accurate data for the claims negotiation exercise at the end of the project.

Reminder! Class Assessment Questions In 1 sentence what was the muddiest part of this module? In 1 sentence, what part of this module could be improved the most?