Rhode Island College, Providence, RI

Slides:



Advertisements
Similar presentations
Creating A Cleaner Energy Future For the Commonwealth Massachusetts Solar Market RPS Solar Carve-Out II Final Policy Design Mark Sylvia, Commissioner December.
Advertisements

NEPA, CWA, THE FARM BILL, THE BAY ACT, ESC, ASA, WQIA Understanding Laws that Shape Virginia’s Soil and Water Conservation Districts defiance-county.com.
Meeting the Letter and Spirit of the Law: Legal Components of Comprehensive Plans.
Flood Hazard Areas & the NJPDES Rule s © 2009 Fox Rothschild Land Use and Environmental Regulation in New Jersey October 14, 2009 Flood Hazard Areas &
Farmlands Office Of Environmental Services Managing the Environmental and Project Development Process Presented by the Ohio Department of Transportation.
PENNSYLVANIA CODE Title 25.Environmental Protection Chapter 102 Erosion and Sediment Control Clean Streams Law-Act 394 of To preserve and improve.
Promoting Renewable Energy Development on Closed MA Landfills Sarah Weinstein, Massachusetts Department of Environmental Protection, AEHS Foundation, UMass.
S-1925 Subsection t Stakeholder Meeting November 9, :30-2:30pm NJDEP Public Hearing Room 1 st Floor, 401 East State Street Trenton, NJ.
1 SUSTAINING AGRICULTURE: SANTA CLARA LAFCO’s EXPERIENCE August 31, 2007 CALAFCO CONFERENCE Sacramento.
Protecting Working Lands: Through USDA Conservation Programs Denise Coleman National Farm and Ranch Lands Protection Program Manager USDA, Natural Resources.
Siting Considerations for Utility Scale Photovoltaic Power Generation Systems. Tim Green, Brookhaven National Laboratory NE FWS Biologists Conference February.
EUTROPHICATION (NUTRIENT POLLUTION) SOLUTIONS REVIEW BEST POLICIES & REAL FIXES.
Transfer of Development Rights
McCoy Field Proposed Keith Middle School Site EPA Proposes Approval of McCoy Field Cleanup Plan.
Creating A Cleaner Energy Future For the Commonwealth Focusing on Solar PV: Technology, Siting Considerations, Incentives Natalie Andrews Renewable Energy.
1 Food, Conservation, and Energy Act of 2008 (Farm Bill) Disclaimer: Provisions provided in this presentation are subject to change or interpretive differences.
Forestry-related Ordinances in Florida What are the potential influences of county and municipal ordinances on forest land retention and sustainability?
From Mandate to Smart Growth: The Evolution of Growth Management in the United States Jesse J. Richardson, Jr. Department of Urban Affairs and Planning.
1 Renewable Energy at Closed Landfills June 17, 2009 Jim Christo Massachusetts Renewable Energy Trust.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Permitting Guidelines January 19, 2010 Daniel Hall, Solid Waste Section Chief.
APPLYING CONSERVATION TO THE TEXAS LANDSCAPE Norman Bade, NRCS State Resource Conservationist Conservation Provisions of the 2002 Farm Bill (Farm Security.
WIND ENERGY SITING REFORM LEGISLATION Kenneth Kimmell, General Counsel, Executive Office of Energy and Environmental Affairs.
Lynne Welsh Massachusetts Department of Environmental Protection.
Energy Leaders Meeting for Water & Wastewater Treatment Facilities July 1, 2010 Carter Wall, MassCEC.
SW101 Large and Small Construction Denise Hamilton, EPA Region 6 8 th Annual Region 6 MS4 Operators Conference June 26, 2006.
Presentation to Association Municipalities of Ontario Implementation of Management of Excess Soil - A Guide for Best Management Practices Ministry of the.
Dr. Anastasios Antonakos General Manager NanoDomi 8th International Scientific Conference on “Energy and Climate Change” 7-9 October 2015 Athens, Greece.
Net Metering Implications for Community Shared Solar and Security Exchange Commission Considerations.
Potential Environmental and Social Impacts of Solar Energy Solar Industry Practices for Environmental Stewardship on Utility-Scale Ground Mounted Projects.
Community Solar. Background Review of Electricity System mandated by Bill 1 – Nov “Our Electricity Future, Nova Scotia’s Electricity Plan” released.
Growing Smarter Pennsylvania’s Land Use Agenda. Percent of Land Developed in Pennsylvania Source: Natural Resources Conservation Service, U.S. Department.
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
R E N O V U S. S O L A R Town of Catlin Community Solar Farm May 12, 2016 Jon McNamara.
UTC STUDY OF DISTRIBUTED GENERATION AND RECOMMENDATIONS Presentation for the Washington Future Energy Conference October 19, 2011.
Creating A Greener Energy Future For the Commonwealth Clean Heat & Power in Massachusetts John Ballam, P.E. Manager of Engineering & the CHP Program MA.
Wetlands Focus Group. Responsibilities and Goals   Growth Managements Act (Chapter 163, FS) of 1985   Included the adoption of the State Comprehensive.
GREEN GROWTH TOOLBOX Wildlife & Natural Resource Stewardship in Planning Wildlife & Natural Resource Stewardship in Planning Black-crowned night heron.
Where critical areas & agriculture meet
Solar PV Implementing Solar Farms on Landfills and Brownfields
OPEN SPACE/ CONSERVATION
Partners in Conservation
Jefferson County SA Red Rocks Site Approval
Where critical areas & agriculture meet
WHAT DO ALL THESE PLACES
The Community Preservation Act in Northborough
Green Energy and Green Spaces
The Green Communities Division Partnering with Massachusetts
Development of Solar PV Projects on Brownfields
Sacramento County Stormwater Quality Program
Advancing Solar PV at Lower Cost: Performance Based Incentives, Price Certainty, and Equitable Rate Treatment Ronald Gerwatowski – Senior VP, National.
The Community Preservation Act in Topsfield – August 31, 2004
Current VA Ag Initiatives
Federal Facilities and the District’s Phase III WIP
Focal Area and Cross Cutting Strategies – Climate Change
The Green Communities Division Partnering with Massachusetts
DOE 1605(b) Voluntary Greenhouse Gas Registry and
Comprehensive Land Use Planning and Zoning
Environmental Sustainability Manager
INDOT Storm Water Management
Metropolitan Mayors Caucus Illinois Energy Bills
Overview of US EPA & State Manure Management Regulations
The Green Communities Division Partnering with Massachusetts
Presidential Permits Implementing EO 13337
WIND ENERGY SITING REFORM LEGISLATION
WHAT DO ALL THESE PLACES
Creating a market for sustainable energy growth Inġ
Farm Service Agency (FSA) Natural Resource Conservation Service (NRCS)
Massachusetts Solar Market RPS Solar Carve-Out II Final Policy Design Mark Sylvia, Commissioner December 13, 2013 Electricity Restructuring Roundtable.
Sacramento County Stormwater Quality Program
Sustainable Agricultural Lands Conservation Program
Presentation transcript:

Rhode Island College, Providence, RI COMMONWEALTH OF MASSACHUSETTS Charles D. Baker, Governor Karyn E. Polito, Lt. Governor Matthew A. Beaton, Secretary Judith Judson, Commissioner Land Use Policy in Massachusetts Solar Incentive Programs Kaitlin Kelly Renewable Energy Program Coordinator Rhode Island College, Providence, RI November 15, 2017

Evolution of Land Use Policy in MA Solar Solar Carve-out I Program (SREC I) 653MW All projects equally eligible Solar Carve-out II Program (SREC II) 1616 MW Market Sector, SREC Factors, and Managed Growth Higher incentive granted to prioritized sites Large, ground mounted, virtually net-metered projects in capped Managed Growth category (total 126MW) Growth of CSS/ Low Income Housing mitigated limiting impact of Managed Growth Solar Massachusetts Renewable Target Program (SMART) 1600MW Goal Executive Office of Energy and Environmental Affairs directed DOER to focus on land use in development of new program Established Land Use Categories with associated incentive subtractors Category 1 (Ag/ Non-ag); Category 2; Category 3; Prohibited Incentive adders for priority sites Implementing land use performance standards

SMART Land Use Policy Incentive Disincentive “Location Based” adders to incentives Landfill and Brownfield Rooftop Solar Canopy Agricultural Floating Solar Location based adders can be combined with an offtaker based adder, and a storage adder Working with sister agencies in approving projects on unique locations Brownfield- MA Department of Environmental Protection Agricultural- MA Department of Agricultural Resources Floating Solar- MA Department of Environmental Protection/ MA Department of Fish and Wildlife Disincentive Greenfield Subtractor for certain categories of land use

Off-taker Based Adders Adder Values Location Based Adders Type Adder Value ($/kWh) Agricultural $0.06 Building Mounted $0.02 Brownfield $0.03 Floating Solar Landfill $0.04 Solar Canopy Off-taker Based Adders Type Adder Value ($/kWh) Community Shared Solar (CSS) $0.05 Low Income Property Owner $0.03 Low Income CSS $0.06 Public Entity $0.02 Energy Storage Adder Type Adder Value ($/kWh) Storage + PV Variable Solar Tracking Adder Type Adder Value ($/kWh) Solar Tracking $0.01

Encouraging Unique Design Agricultural Generation Unit Dual Use PV installations on working farm land, so that it will not interfere with continued land use Raised structures spaced to allow crop growth, grazing animals, etc. Required to provide annual reports on agricultural productivity DOER developing further guidance with MDAR Approval comes from DOER/ MDAR Floating Solar Installed on bodies of water used for agricultural or industrial activities (i.e. water treatment facilites) Prohibited on natural waterbodies and wetland resource areas Approval comes from DOER/ MassDEP

Compensation Rate ($/kWh) Land Use Categories All projects are categorized according to land use Category 1- No Greenfield Subtractor Category 1 Agricultural (facilities located on Land in Agricultural Use or Prime Agricultural Farmland) Agricultural Solar Tariff Generation Units Building Mounted Solar Tariff Generation Units Solar Tariff Generation Units sized to meet no greater than 200% of annual operational load of an agricultural facility Category 1 Non-Agricultural Ground mounted <=500 kW Ground mounted >500 kW and <=5,000 kW that are (1) on land that has been previously developed or (2) on land in a solar overlay district or zoned for solar or power generation Building Mounted, Brownfield, Landfill, Canopy, and Floating Solar Generation Units Category 2- Half Greenfield Subtractor Zoned Commercial/ Industrial and not previously developed Category 3- Full Greenfield Subtractor All other project types Ineligible Land Use Article 97 Land (unless it meets Category 1 criteria) Wetland Resource Areas Historical register sites (except as authorized by regulatory bodies) Previously Developed is defined as having pre-existing paving, construction, or altered landscapes excluding alterations resulting from ag use, forestry, or use as a preserved natural area Project Type Category 3 Category 2 Category 1 Rooftop Brownfields Landfill Canopy Compensation Rate ($/kWh) X - $0.001/acre X - $0.0005/acre X X + $0.02 X + $0.03 X + $0.04 X + $0.06 Base Rate Adders Subtractors

Land Use Performance Standards All ground mounted facilities must comply with the following performance standards: No removal of all field soils existing leveled field areas left as is without disturbance where soils need to be leveled and smoothed, such as filling potholes or leveling, this shall be done with minimal overall impact with all displaced soils returned to the areas affected; ballasts, screw-type, or post driven pilings and other acceptable minimal soil impact methods that do not require footings or other permanent penetration of soils for mounting are required, unless the need for such can be demonstrated; any soil penetrations that may be required for providing system foundations necessary for additional structural loading or for providing system trenching necessary for electrical routing shall be done with minimal soils disturbance, with any displaced soils to be temporary and recovered and returned after penetration and trenching work is completed; no concrete or asphalt in the mounting area other than ballasts or other code required surfaces, such as transformer or electric gear pads; address existing soil and water resource concerns that may be impacted to ensure the installation does not disturb an existing soil and water conservation plan or to avoid creating a negative impact to soil and water conservation best management practices, such as stimulating erosion or water run-off conditions; limited use of geotextile fabrics; and maintain vegetative cover to prevent soil erosion

Next Steps SMART Regulations are fully in effect 225 CMR 20.00 DOER is currently developing further guidance on Land Use Categorization, to be released for comment in the coming weeks Program will go into effect next year, likely around late Spring 2018 A 100MW RFP for ground mounted projects released November 13, 2017 Open only to ground mounted projects Eligible projects subject to Greenfield Subtractor, cannot apply for adders Results announced January 11, 2018, setting all program prices

Thank you Visit our website: https://www.mass.gov/solar-massachusetts-renewable-target-smart Questions: Kaitlin.Kelly@state.ma.us