RF Status 1 4 High Power Amplifier circuits available CERN(2)

Slides:



Advertisements
Similar presentations
Institute for Storage Ring Facilities, Aarhus,
Advertisements

1 paul drumm; Jan’05; MICE RF Needs MICE RF Power Paul Drumm ISIS Facility Rutherford Appleton Laboratory & MICE.
Andrew Moss ASTeC MICE Project Board 28 th June 2011 MICE RF System.
HIGH POWER SYSTEMS FOR WIND PROFILER K. P. Ray K. P. Ray Society for Applied Microwave Electronics Engineering & Research IIT campus, Powai, Mumbai-400.
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
MICE RF & Controls Paul Drumm. RF Layout 2 MW Amplifier Master Oscillator Controls etc 201 MHz Cavity Module 2 MW Amplifier 201 MHz Cavity Module CERN.
09 th April 2003 SINGLE SPLIT DRIVE CHAIN TH116 TH116 or TH526 RS2058 ex SPS AMP 7651 ex RAL SOLID STATE DRIVER LEVEL CONTROL AND SOURCE R.F. LEVEL FEEDBACK.
Daresbury MICE Progress Andrew Moss Joe Orrett Peter Corlett.
Paul Drumm 9 Feb 2004 MICE at RF system: power source, distribution Paul Drumm RAL Ambitious title!
Report from RF Session (1:30-5:40 PM, 3/30/2004) H. Haseroth and Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration.
Paul Drumm 30 March 2004 MICE at RF Power System: power source, distribution Paul Drumm RAL Ambitious title!
H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE 1 RF & RF power H. Haseroth CERN  Situation of 88 MHz test cavity  Availability of amplifiers.
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
Andrew Moss ASTeC 7 th December 2011 MICE RF System.
Collaboration meeting, DL, 19 h – 23 h October 2008 Andrew Moss ASTeC Collaboration meeting, DL, 19 th – 23 th October 2008 MICE RF distribution system.
1 MICE RF Daresbury Laboratory Support Joe Orrett - ASTeC.
MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.
RF Distribution Alternatives R.A.Yogi & FREIA group Uppsala University.
Andrew Moss ASTeC Collaboration meeting CM29 15 th - 18 th February 2011 MICE RF System.
1 paul drumm, 19 th May 2004 MICE RF By Phone at 16:00 FNAL: Al Moretti LBNL: Derun Li
High Power RF Systems, Control and Distribution in the HINS Alfred Moretti, Brian Chase, Chris Jensen and Peter Prieto Fermilab Accelerator Advisory Committee.
David Regidor, Moisés Weber (CIEMAT, Madrid, Spain) The IFMIF-EVEDA Accelerator Prototype will be a 9MeV, 125mA CW deuteron accelerator to validate the.
Clustered Surface RF Production Scheme Chris Adolphsen Chris Nantista SLAC.
February 17-18, 2010 R&D ERL Alex Zaltsman R&D ERL High Power RF Systems Alex Zaltsman February 17-18, 2010 High Power RF Systems.
I. Syratchev, April 2015, EuCARD2, Barcelona. Review of Efficient RF Sources I. Syratchev, CERN.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
Anders Sunesson RF Group ESS Accelerator Division
1 SPL Collaboration Meeting dec 08 - WG1 Introduction First SPL Collaboration Meeting Working Group 1 High Power RF Distribution System Introduction.
PSB C04 RF system Consolidation or upgrade? M. Paoluzzi – CERN BE-RF 11/23/20151.
ESS RF System Design Stephen Molloy RF Group ESS Accelerator Division SLHiPP2 4-May-2012.
Renovation of the 200 MHz RF system LLRF issues. Cavities redistribution 26 October th LIU-SPS Coordination Meeting 2  2011 : 4 cavities 2 x 4.
Progress on the MICE RF High Power Drive Systems K Ronald, University of Strathclyde For the MICE RF team 1MICE CM38 RF Parallel Session.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
Andrew Moss ASTeC TIARA Mid term meeting 12 th 14 th June 2012 CIEMAT ICTF Progress on the MICE RF System.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
Ingot Niobium Workshop RF Sources Andrew Kimber 4 th December 2015 Thomas Jefferson National Accelerator Facility is managed by Jefferson Science Associates,
Valery Telnov Budker INP, Novosibirsk IWLC2010, CERN October 21, 2010 A FEL pumped solid state laser system for the photon collider at CLIC.
MICE RF Power Status Paul Drumm ~ Sunday August 1 st 2004.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 17 th December 2013.
Managed by UT-Battelle for the Department of Energy Vector Control Algorithm for Efficient Fan-out RF Power Distribution Yoon W. Kang SNS/ORNL Fifth CW.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
CLIC Workshop 2008 TBTS status. PETS testing program and installation status. Igor Syratchev & Germana Riddone for the CLIC team.
Stefan Wilke, DESY MHF-e 1 12th ESLS RF Meeting 1 st October, 2008 at DIAMOND Overview and Status of Assembling and Commissioning the RF-System at PETRA.
BARC-IIFC collaboration meet RF Solid-state Power Amplifiers at 325 MHz RFSS, TPD, BARC.
Project X High Power 325 MHz RF Distribution and Control Alfred Moretti, Nov 12, 2007 Project X Workshop.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
Linac RF System Design Options Y. Kang RAD/SNS/NScD/ORNL Project – X Collaboration Meeting April , 2011.
Andrew Moss ASTeC, Daresbury Laboratory October 2010 MICE RF Amplifier Status.
LLRF development of SSRF RF Group and Linac Group
High Power RF Solid State Amplifiers at FREIA
Solid State Amplifier Development at PSI
RF signal generator Network Analyzer Power Amplifier Power Amplifier 2
Second SPL Collaboration Meeting, Vancouver May 2009
SPL Collaboration Meeting PAC2009
12 GHz High Power RF components requirements for CEA activities
IFMIF-EVEDA RF POWER SYSTEM
CEPC RF Power Sources System
Low Level RF Status Outline LLRF controls system overview
RF Pulse Shaping.
DESIGN OF THE HWR CAVITIES FOR SARAF
Low Level RF Status Outline LLRF controls system overview
FAIR pLinac RFQ Meeting pLinac RF Power Sources
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
HIGH POWER AMPLIFIERS For WARM LINAC Arash Kaftoosian
CEPC RF Power Source System
RF introduction Anders Sunesson RF group leader
Used PEP-II 476 MHz Cavities for MEIC Collider Rings
Presentation transcript:

RF Status 1 4 High Power Amplifier circuits available CERN(2) one working at 88MHz One in pieces, one working spare for linac Berkeley(2) as yet seen – visit planned last week of August Some information – not without cost…. Cost of New Amplifier ~ 70k

PAC 1991

RF Status 2 TH271 Drivers – amplifiers & tubes available at CERN (4-5) 4616 Drivers available at Los Alamos (4) Currently in use – expected ?

Possible Schemes 8x 1MW Option 4x 3MW Option One amplifier chain per cavity Lack 4 Amplifier circuits 4x 3MW Option One amplifier shared to two cavities Need load and circulator per cavity Assumes 4 amplifier circuits reused

4x 3MW CAVITIES LOAD 1 to 1.5 MW 100 to 150 kW TH116 4616 LOAD MATCHED POWER SPLITTERS 1 to 1.5 kW R.F. DRIVE LOAD TH116 4616 LOAD 70db COUPLERS CIRCULATORS R.A.CHURCH R.A.L.

8x 1MW CAVITY 1 kW 10 mW 1. To 1.5MW 100 kW 70db COUPLER TH 116 AMPLITUDE AND PHASE CONTROL 4616 SOLID STATE DRIVER R.F. SOURCE R.F. SOURCE TO SEVEN OTHER PHASE AND AMPLITUDE CONTROL SYSTEMS R.A. CHURCH R.A.L.

Costs

£ Cost comparison 8x Option 4x Option 4 new circuits ~ 280k 4 extra 4616 tubes ~120k Extra controls etc ~200k = 600k 4x Option 8 circulators, ~480k 8 loads ~80k 4x splitters ~16k = 576k

Suggested Plan Choose 8x option - Build in two phases Phase I Phase II Initially re-use available kit Power 4 x 1 MW into 4 cavities ~ 1000k est Phase II Construct new circuits Power 8 x 1 MW into 8 cavities