CASH FLOWS IN CAPITAL BUDGETING

Slides:



Advertisements
Similar presentations
The Capital Budgeting Decision (Chapter 12)  Capital Budgeting: An Overview  Estimating Incremental Cash Flows  Payback Period  Net Present Value 
Advertisements

Chapter 9. Capital Budgeting: the process of planning for purchases of long- term assets. n example: Suppose our firm must decide whether to purchase.
Capital Budgeting: To Invest or Not To Invest  Capital Budgeting Decision –usually involves long-term and high initial cost projects. –Invest if a project’s.
1 The Basics of Capital Budgeting: Evaluating and Estimating Cash Flows Corporate Finance Dr. A. DeMaskey Should we build this plant?
1 FINANCE 7311 CAPITAL BUDETING. 2 Outline 4 Projects 4 Investment Criteria 4 NPV v. IRR 4 Sources of NPV 4 Project Cash Flow Checklist.
Capital Budgeting Net Present Value Rule Payback Period Rule
1 Chapter 13 Capital Budgeting: Decision Criteria.
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 11 Capital Budgeting.
Chapter – 5 & 6: NPV & Other Investment Rules, Cash flows
UNIT 8 Project Valuation
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Making Capital Investment Decisions Chapter Ten.
Chapter 11: Cash Flows & Other Topics in Capital Budgeting  2000, Prentice Hall, Inc.
Chapter 10.
Chapter 9 Project Cash Flows and Risk © 2005 Thomson/South-Western.
Cash Flows and Other Issues in Capital Budgeting
Chapter 9. Capital Budgeting Techniques and Practice  2000, Prentice Hall, Inc.
Corporate Financial Management 3e Emery Finnerty Stowe
Chapter 10 - Cash Flows and Other Topics in Capital Budgeting.
Project Cash Flow – Incremental Cash Flow (Ch – 10.7) 05/22/06.
Making Capital Investment Decisions Estimating Cash Flows Special cases.
Chapter 10 Making Capital Investment Decisions McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
Relevant cash flows Working capital treatment Unequal project lives Project Cash Flow Analysis.
1 Cash Flows and Other Topics in Capital Budgeting Chapter 10.
Ch.11 Capital Budgeting 1. Goals: 1) After tax cash flow 2) Capital budgeting decision techniques 3) “Solver” to determine the firm’s optimal capital budgeting.
Ch 12: Capital Budgeting Decision Criteria
1 FINC3131 Business Finance Chapter 12: Cash Flow Estimation in Capital Budgeting.
Capital Budgeting Decisions
1 Capital Budgeting Capital budgeting - A process of evaluating and planning expenditure on assets that will provide future cash flow(s).
FI Corporate Finance Zinat Alam 1 FI3300 Corporation Finance – Chapter 11 Cash Flow & Capital Budgeting.
Cash Flow Estimation Chapter 7 in the book Financial Policy and Planning (MB 29)
Exam 3 Review.  The ideal evaluation method should: a) include all cash flows that occur during the life of the project, b) consider the time value of.
Capital Budgeting MF 807 Corporate Finance Professor Thomas Chemmanur.
Lecture Fourteen Cash Flow Estimation and Other Topics in Capital Budgeting Relevant cash flows Working capital in capital budgeting Unequal project.
Opportunity Cost of Capital and Capital Budgeting Chapter Three Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Ch. 10: Capital Budgeting Techniques and Practice  2000, Prentice Hall, Inc.
10 0 Making Capital Investment Decisions. 1 Key Concepts and Skills  Understand how to determine the relevant cash flows for various types of proposed.
10 0 Making Capital Investment Decisions. 1 Key Concepts and Skills  Understand how to determine the relevant cash flows for various types of proposed.
Finance Chapter 11 Cash flow estimation & risk analysis.
0 Corporate Finance Ross  Westerfield  Jaffe Seventh Edition 6 Chapter Six Some Alternative Investment Rules.
Prepared by Ingrid McLeod-Dick Schulich School of Business © 2015 McGraw–Hill Ryerson Limited All Rights Reserved Net Present Value and Capital Budgeting.
Chapter 10 - Cash Flows and Other Topics in Capital Budgeting.
Cash Flows and Other Topics in Capital Budgeting
Estimating Cash Flows and Refinements to Capital Budgeting 11 CHAPTER Copyright © 1999 Addison Wesley Longman.
Chapter 12 Analyzing Project Cash Flows. Copyright ©2014 Pearson Education, Inc. All rights reserved.12-2 Slide Contents Learning Objectives 1.Identifying.
Andrew, Damitio, Schmidgall Financial Management for the Hospitality Industry ©2007 Pearson Education, Inc. Upper Saddle River, NJ Chapter 9 Capital.
Cash Flow Estimation Byers.
NPV and Capital Budgeting
Cash Flows in Capital Budgeting
Capital Budgeting: Estimating Cash Flows and Analyzing Risk
Project Cash Flow Analysis
Cash Flow Estimation and Risk Analysis
INVESTMENT ANALYSIS OR CAPITAL BUDGETING
PROBLEM SOLVING.
12 The Capital Budgeting Decision Prepared by: Michel Paquet
CHAPTER 12 Cash Flow Estimation and Risk Analysis
Cash Flow Estimation and Risk Analysis
Capital Budgeting and Estimating Cash Flows
TECHNIQUES IN CAPITAL BUDGETING
Capital Budgeting and Cost Analysis
Longer-Run Decisions: Capital Budgeting
Lecture: 6 Course Code: MBF702
Chapter 6 Principles of Capital Investment
Chapter 7 Cash Flow of Capital Budgeting
Bus 512- Capital Budgeting | Dr. Menahem Rosenberg
Cash Flow Estimation Byers.
Cash Flow Estimation and Risk Analysis
Intro to Financial Management
Chapter 8 - Cash Flows and Other Topics in Capital Budgeting
Cash Flow Estimation and Risk Analysis
Presentation transcript:

CASH FLOWS IN CAPITAL BUDGETING CHAPTER 10 CASH FLOWS IN CAPITAL BUDGETING

The process of planning for purchases of long-term assets. Capital Budgeting The process of planning for purchases of long-term assets. For example: Our firm must decide whether to purchase a new plastic molding machine for $127,000. How do we decide? Will the machine be profitable? Will our firm earn a high rate of return on the investment? SITI AISHAH BINTI KASSIM (FM2)

IDENTIFYING RELEVANT CASH FLOWS PROJECT CASH FLOW vs ACCOUNTING INCOME 1) COST OF FIXED ASSETS Asset purchases represent negative cash flows. Full cost of the asset includes shipping and installation costs, used as the depreciable basis to calculate depreciation charges. The fixed assets are often sold at the end of project’s life, giving after-tax cash proceeds which represents a +ve cash flow. SITI AISHAH BINTI KASSIM (FM2)

3) CHANGES IN NET OPERATING WORKING CAPITAL 2) NON CASH CHARGES Depreciation is subtracted from revenues. Depreciation shelters income from taxation, has an impact on cash flow, but it is NOT a cash flow, thus MUST be added back to net income when estimating project’s CF. 3) CHANGES IN NET OPERATING WORKING CAPITAL When sales expand, accounts receivable increase. Payables and accruals spontaneously increase, and this reduces the cash to finance inventories and receivables. At end of project’s life, inventories will be used but not replaced, receivables will be collected without replacement, bringing cash inflows. NOWC will be returned and added back to the cash flow. SITI AISHAH BINTI KASSIM (FM2)

INTEREST EXPENSES NOT included in project cash flow for 2 reasons. Firstly because they are already accounted for in the cost of capital (Required rate of return). 2ndly, project cash flow is the cash flow available to ALL investors, bondholders AND shareholders, so interest expenses are NOT subtracted. INCREMENTAL CASH FLOWS (NET CASH FLOW IN AN INVESTMENT PROJECT) Sunk Costs: (EXCLUDE from CF) A cash outlay that has ALREADY been incurred, cannot be recovered regardless of whether the project is accepted or rejected. Examples: Consultant fees, fees for marketing surveys. SITI AISHAH BINTI KASSIM (FM2)

Effects on Other Parts of the Firm: (either INCLUDED or EXCLUDED) 2) Opportunity costs: (INCLUDE in CF) The return on the best ALTERNATIVE use of an asset, that will NOT be earned if funds are invested in a particular project. Example he use of a land for the project site which could be sold, or the use of space/floor which could have been rented out. Effects on Other Parts of the Firm: (either INCLUDED or EXCLUDED) Externalities - Effects of a project on cash flows in other parts of the firm. Often difficult to quantify. Cannibalization - Occurs when the introduction of a new product causes sales of existing products to decline. (Example: IBM for years refused to provide full support for its PC division because it did not want to steal sales from its highly profitable mainstream business. Huge strategic error, because it allowed Intel, Microsoft , Compaq and others to become dominant forces in the computer industry. SITI AISHAH BINTI KASSIM (FM2)

Capital Budgeting Steps 1) Evaluate Cash Flows Look at all relevant cash flows occurring as a result of the project. Initial outlay Differential Cash Flows over the life of the project (also referred to as annual cash flows). Terminal Cash Flows SITI AISHAH BINTI KASSIM (FM2)

Capital Budgeting Steps 1) Evaluate Cash Flows Terminal Cash flow Initial outlay 1 2 3 4 5 n 6 . . . Annual Cash Flows SITI AISHAH BINTI KASSIM (FM2)

Capital Budgeting Steps 2) Evaluate the Risk of the Project We’ll get to this in the next chapter. For now, we’ll assume that the risk of the project is the same as the risk of the overall firm. If we do this, we can use the firm’s cost of capital as the discount rate for capital investment projects. 3) Accept or Reject the Project SITI AISHAH BINTI KASSIM (FM2)

Capital Budgeting Steps (EXAMPLE): The cost of the new machine is $127,000. Installation will cost $20,000. $4,000 in net working capital will be needed at the time of installation. The project will increase revenues by $85,000 per year, but operating costs will increase by 35% of the revenue increase. Simplified straight line depreciation is used. Class life is 5 years, and the firm is planning to keep the project for 5 years. Salvage value at the end of year 5 will be $50,000. 14% cost of capital; 34% marginal tax rate. SITI AISHAH BINTI KASSIM (FM2)

Step 1: Evaluate Cash Flows a) Initial Outlay: What is the cash flow at “time 0?” (Purchase price of the asset) + (shipping and installation costs) (Depreciable asset) + (Investment in working capital) + After-tax proceeds from sale of old asset Net Initial Outlay SITI AISHAH BINTI KASSIM (FM2)

Step 1: Evaluate Cash Flows a) Initial Outlay: What is the cash flow at “time 0?” (127,000) Purchase price of asset + (20,000) Shipping and installation (147,000) Depreciable asset + (4,000) Net working capital + 0 Proceeds from sale of old asset ($151,000) Net initial outlay SITI AISHAH BINTI KASSIM (FM2)

Step 1: Evaluate Cash Flows b) Annual Cash Flows: What incremental cash flows occur over the life of the project? For Each Year, Calculate: Incremental revenue - Incremental costs - Depreciation on project Incremental earnings before taxes - Tax on incremental EBT Incremental earnings after taxes + Depreciation reversal Annual Cash Flow SITI AISHAH BINTI KASSIM (FM2)

For Years 1 - 5: 85,000 Revenue (29,750) Costs (29,400) Depreciation 25,850 EBT (8,789) Taxes 17,061 EAT 29,400 Depreciation reversal 46,461 = Annual Cash Flow SITI AISHAH BINTI KASSIM (FM2)

Step 1: Evaluate Cash Flows c) Terminal Cash Flow: What is the cash flow at the end of the project’s life? Salvage value +/- Tax effects of capital gain/loss + Recapture of net working capital Terminal Cash Flow SITI AISHAH BINTI KASSIM (FM2)

Tax Effects of Sale of Asset: Salvage value = $50,000. Book value = depreciable asset - total amount depreciated. Book value = $147,000 - $147,000 = $0. Capital gain = SV - BV = 50,000 - 0 = $50,000. Tax payment = 50,000 x .34 = ($17,000). SITI AISHAH BINTI KASSIM (FM2)

Step 1: Evaluate Cash Flows So, the terminal cash flow: 50,000 Salvage value (17,000) Tax on capital gain 4,000 Recapture of NWC 37,000 = Terminal Cash Flow SITI AISHAH BINTI KASSIM (FM2)

Project NPV: CF(0) = -151,000. CF(1 - 4) = 46,461. Or CF (1-5) = 45,461 CF(5) = 46,461 + 37,000 = 83,461. Or CF (5) = 37,000 Discount rate = 14%. NPV = $27,721. We would accept the project! SITI AISHAH BINTI KASSIM (FM2)

Capital Rationing Suppose that you have evaluated five capital investment projects for your company. Suppose that the VP of Finance has given you a limited capital budget. How do you decide which projects to select? SITI AISHAH BINTI KASSIM (FM2)

Capital Rationing IRR 5% 10% 15% 20% 25% $ 1 2 3 4 5 $X You could rank the projects by IRR: IRR 5% 10% 15% 20% 25% $ Our budget is limited so we accept only projects 1, 2, and 3. 1 2 3 4 5 $X SITI AISHAH BINTI KASSIM (FM2)

You could rank the projects by IRR: Capital Rationing You could rank the projects by IRR: IRR 5% 10% 15% 20% 25% $ Our budget is limited so we accept only projects 1, 2, and 3. 1 2 3 $X SITI AISHAH BINTI KASSIM (FM2)

Capital Rationing Ranking projects by IRR is not always the best way to deal with a limited capital budget. It’s better to pick the largest NPVs. Let’s try ranking projects by NPV. SITI AISHAH BINTI KASSIM (FM2)

Problems with Project Ranking Mutually exclusive projects of unequal size (the size disparity problem) The NPV decision may not agree with IRR or PI. Solution: select the project with the largest NPV. SITI AISHAH BINTI KASSIM (FM2)

Problems with Project Ranking The time disparity problem with mutually exclusive projects. NPV and PI assume cash flows are reinvested at the required rate of return for the project. IRR assumes cash flows are reinvested at the IRR. The NPV or PI decision may not agree with the IRR. Solution: select the largest NPV. SITI AISHAH BINTI KASSIM (FM2)

Mutually Exclusive Investments with Unequal Lives Suppose our firm is planning to expand and we have to select one of two machines. They differ in terms of economic life and capacity. How do we decide which machine to select? SITI AISHAH BINTI KASSIM (FM2)

Example: The after-tax cash flows are: Year Machine 1 Machine 2 0 (45,000) (45,000) 1 20,000 12,000 2 20,000 12,000 3 20,000 12,000 4 12,000 5 12,000 6 12,000 Assume a required return of 14%. SITI AISHAH BINTI KASSIM (FM2)

Step 1: Calculate NPV NPV1 = $1,433 NPV2 = $1,664 So, does this mean #2 is better? No! The two NPVs can’t be compared! SITI AISHAH BINTI KASSIM (FM2)

Step 2: Equivalent Annual Annuity (EAA) method If we assume that each project will be replaced an infinite number of times in the future, we can convert each NPV to an annuity. The projects’ EAAs can be compared to determine which is the best project! Simply annuitize the NPV over the project’s life. SITI AISHAH BINTI KASSIM (FM2)

EAA with your calculator: Simply “spread the NPV over the life of the project” Machine 1: PV = 1433, N = 3, I = 14, solve: PMT = -617.24. Machine 2: PV = 1664, N = 6, I = 14, solve: PMT = -427.91. SITI AISHAH BINTI KASSIM (FM2)

NPV1 = annuity of $617 per year. NPV2 = annuity of $428 per year. EAA1 = $617 EAA2 = $428 This tells us that: NPV1 = annuity of $617 per year. NPV2 = annuity of $428 per year. So, we’ve reduced a problem with different time horizons to a couple of annuities. Decision Rule: Select the highest EAA. We would choose machine #1. SITI AISHAH BINTI KASSIM (FM2)

Step 3: Convert back to NPV ¥ Assuming infinite replacement, the EAAs are actually perpetuities. Get the PV by dividing the EAA by the required rate of return. NPV 1 = 617/.14 = $4,407 NPV 2 = 428/.14 = $3,057 This doesn’t change the answer, of course; it just converts EAA to an NPV that can be compared. SITI AISHAH BINTI KASSIM (FM2)

The end SITI AISHAH BINTI KASSIM (FM2)